You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. MARICULTURE TECHNOLOGY FOR ECONOMIC DEVELOPMENT, PROMOTING SELF-SUFFICIENCY FOR RURAL ALASKA NATIVES

    SBC: Akhiok Tribal Enterprises            Topic: N/A

    PROBLEM: ONE OF THE MAJOR BARRIERS TO THE DEVELOPMENT OF PINK SCALLOP AQUACULTURE IS THE SHIPMENT OF THE LIVE ANIMALSTO MARKETS ON THE WEST COAST. PINK SCALLOPS ARE VERY FRAGILE. TRANSPORTING THEM TO KODIAK AND REMOTE SITE FOR SHIPMENT TO SEATTLE AND STILL MAINTAIN ENOUGH SHELF LIFE FOR WHOLESALERS AND RETAILERS TO SELL THE PRODUCT IS DIFFICULT. QUESTION: CAN THE SHELF LIFE BE EXTENDED WITH PROCED ...

    SBIR Phase I 1989 Department of Agriculture
  2. GALLIUM ARSENIDE ON SILICON FOR MICROELECTRONIC AND OPTOELECTRONIC INTEGRATED CIRCUITS

    SBC: ASTROPOWER, INC.            Topic: N/A

    THE GROWTH OF DEVICE QUALITY, LARGE AREA GAAS EPITAXIAL LAYERS ON SILICON SUBSTRATES IS RECOGNIZED AS AN IMPORTANT TECHNOLOGICAL DEVELOPMENT. THE QUALITY OF HETEROEPITAXIAL LAYERS OF GAAS ON SILICON ARE LIMITED BY GAAS-SI LATTICE MISMATCH AND THERMAL COEFFICIENT MISMATCH. THE DEFECT DENSITY OF THE GAAS EPILAYER IS DIRECTLY RELATED TO THE INTERFACE AREA. OUR LABORATORIES HAVE DEMONSTRATED A VIABLE ...

    SBIR Phase II 1989 National Science Foundation
  3. THIN CRYSTALLINE INDIUM-PHOSPHIDE ON INSULATING SUBSTRATES

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  4. HIGH TEMPERATURE SURVIVABLE INDIUM PHOSPHIDE SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseMissile Defense Agency
  5. AIDS PREVENTION TRAINING FOR MINORITY PARENTS

    SBC: Bethune-cookman Dev Corp            Topic: N/A

    BECAUSE THERE IS NO KNOWN CURE FOR AIDS, NOR ANY CURES CURRENTLY ANTICIPATED, THE MOST EFFECTIVE RESPONSE TO THIS INTERNATIONAL EPIDEMIC MUST BE THROUGH EDUCATION AND PREVENTION. UNFORTUNATELY, OVER A THIRD OF U.S. YOUTHS IN LARGE CITIES HAVE ABANDONED SCHOOL AND, IN CONDUCTING THEIR LIVES IN THE CONTEXT OF STREET CULTURE, ARE AT HIGH RISK FOR CONTRACTING AIDS. PHASE I OF THIS PROJECT AIMS TO DEVE ...

    SBIR Phase I 1989 Department of Health and Human Services
  6. MIS SOFTWARE FOR TRACKING SERVICES FOR DISABLED YOUNG CHILDREN AND THEIR FAMILIES ACROSS MULTIPLE SERVICE PROVIDER

    SBC: Center for Resource Management            Topic: N/A

    THIS PROJECT WILL DETERMINE THE TECHNICAL FEASIBILITY AND POTENTIAL UTILITY OF DEVELOPING MIS SOFTWARE FOR TRACKING SERVICES TO YOUNG CHILDREN WITH DISABILITIES AND THEIR FAMILIES ACROSS MULTIPLE SERVICE PROVIDERS. THE PROJECT ADDRESSES THE IMPORTANT NEED TO DEVELOP MIS SOFTWARE SPECIFICALLY DESIGNED TO SUPPORT A NEW ERA OF PROFESSIONAL AND FAMILY PARTNERSHIPS AND COORDINATED SERVICE DELIVERY. MAJ ...

    SBIR Phase I 1989 Department of Education
  7. MANAGEMENT METHODOLOGY FOR A LARGE NETWORK OF UNDERGROUND STORAGE TANKS- PHASE I: EXTERNAL MONITORING WITH IN SITU SENSORS

    SBC: Morlock Enviromentalinc            Topic: N/A

    N/A

    SBIR Phase I 1989 Department of DefenseAir Force
  8. A LONG-LIFE CENTRIFUGAL PUMP FOR HELIUM II TRANSFER

    SBC: CREARE LLC            Topic: N/A

    NASA CURRENTLY HAS SEVERAL ASTROPHYSICS MISSIONS PLANNED IN WHICH HELIUM REPLENISHMENT IS IMPORTANT. ONE OF THE TWO LEADING CANDIDATE REPLENISHMENT SYSTEMS REQUIRES A MECHANICAL PUMP. THIS PROGRAM IS INTENDED TO DEVELOP A LONG-LIFE CENTRIFUGAL PUMP TO MEET THESE REQUIREMENTS. IN PHASE I, A PRELIMINARY DESIGN AND ANALYSIS OF A SMALL HIGH SPEED CENTRIFUGAL PUMP WILL BE PERFORMED. THE PUMP WILL BE DE ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
  9. COMPUTER SOFTWARE FOR HYPERTHERMIA TREATMENTS

    SBC: CREARE LLC            Topic: N/A

    STRONG EVIDENCE EXISTS THAT ELEVATED TEMPERATURES, IN THE RANGE OF 42 TO 45 DEGREES(C) (HYPERTHERMIA), ARE AN IMPORTANT FACTOR IN THE DESTRUCTION OF CANCER CELLS, ESPECIALLY WHEN COMBINED WITH RADIATION THERAPY AND CHEMOTHERAPY. PRODUCING A CONTROLLED-TEMPERATURE DISTRIBUTION OF A GIVEN MAGNITUDE IS CRITICAL TO THE SUCCESS OF HYPERTHERMIA TREATMENT. RECENT ADVANCES IN COMPUTER TECHNOLOGY HAVE MADE ...

    SBIR Phase II 1989 Department of Health and Human Services
  10. MULTIGRID SOLUTION OF INTERNAL FLOWS USING GENERALIZED SOLUTION ADAPTIVE MESHES

    SBC: CREARE LLC            Topic: N/A

    IN THIS PROJECT, WE PROPOSE TO DEVELOP A MULTIGRID SOLVER FOR INTERNAL FLOWS USING GENERALIZED SOLUTION ADAPTIVE MESHES COMPOSED OF TRIANGULAR OR TETRAHEDRAL MESH CELLS. THE RESULTING COMPUTER PROGRAM WILL PERMIT THE SOLUTION OF THREE-DIMENSIONAL TRANSONIC VISCOUS FLOWS IN STATIONARY AND ROTATING DOMAINS, AND WILL HAVE THE ABILITY TO ACCURATELY REPRESENT GEOMETRICALLY COMPLEX CONFIGURATIONS AND TO ...

    SBIR Phase II 1989 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government