You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. UNIQUE APPLICATIONS FOR ARTIFICIAL NEURAL NETWORKS

    SBC: Adaptive Solutions Inc.            Topic: N/A

    WE PURPOSE TO DEMONSTRATE THE FEASIBILITY OF SPEECH RECOGNITION ON A VLSI NEUROCOMPUTER. THE SPEECH RECOGNITION SYSTEM PERFORMS SPEAKER-INDEPENDENT RECOGNITION OF SPOKEN ENGLISH LETTERS. THE CURRENT IMPLEMENTATION OF THE SYSTEM, NOW RUNNING ON A SUN 4 WORKSTATION, CLASSIFIES LETTERS OF THE ENGLISH ALPHABET AT 94% ACCURACY - THE BEST REPORTED PERFORMANCE OF ANY SYSTEM ON THIS DIFFICULT TASK. THE HI ...

    SBIR Phase I 1990 Department of DefenseDefense Advanced Research Projects Agency
  2. LIGHT-WEATHER DATABASE FOR REENTRY TECHNOLOGIES

    SBC: Aeromet, Inc.            Topic: N/A

    DEVELOPMENT OF A PLAN AND ITS DEMONSTRATION IN PRODUCING MODERN DATABASE FOR RV TECHNOLOGIES IS PROPOSED BY USING CLOUD MICROPHYSICAL DATA SETS COLLECTED SINCE 1985 OVER THE NORTH AMERICAN CONTINENT AND U.S. ARMY KWAJALEIN ATOLL. THE PLAN INCLUDES THE USE OF AIRBORNE RADAR, MODELING, AND SATELLITE ADDITIONS TO THE PARTICLE SIZE DATA TO CORRELATE PARTICLE SIZE AND LIQUID WATER CONTENT OVER AN EXTEN ...

    SBIR Phase I 1990 Department of DefenseAir Force
  3. SATELLITE KILL ASSESSMENT SPECTROSCOPY

    SBC: Aeromet, Inc.            Topic: N/A

    TO MEET THE KINETIC ENERGY ANTI-SATELLITE (KE ASAT) REQUIREMENTS FOR TIMELY AND RELIABLE KILL ASSESSMENT, AEROMET PROPOSES TO RECOMMEND INNOVATIVE TECHNIQUES IN REAL-TIME KILL ASSESSMENT SPECTROSCOPY. BECAUSE IT CAN BE CRITICALLY IMPORTANT TO ACCURATELY VERIFY SATELLITE ELIMINATION, A KILL ASSESSMENT SYSTEM MUST DISCERN BETWEEN VARIOUS HIT AND MISS PHENOMENA, INCLUDING THE USE OF POTENTIAL COUNTER ...

    SBIR Phase I 1990 Department of DefenseArmy
  4. AUTO MANUFACTURE OF VERY SMALL ELECTRIC MOTORS

    SBC: AIREX CORP.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseAir Force
  5. ACTIVATED METAL DECOY FOR LOW IR SIGNATURE AIRCRAFT

    SBC: Alloy Surfaces Company, Inc.            Topic: N/A

    ACTIVATED STEEL FOIL FABRICATED INTO ELEMENTS TO BE PACKAGED AS EXPENDABLE DECOYS HAS SHOWN GOOD PERFORMANCE IN LOW IR SIGNATURE APPLICATIONS. THE PRESENT BATCH PRODUCTION PROCESS FOR THESE FOILS ENTAILS, IN PART, TWENTY HOURS OF FURNACE TREATMENT. A COMBINATION OF NINE SEPARATE OPERATIONS, LOW PRODUCTION RATES AND HIGH LABOR COSTS YIELDS A UNIT MANUFACTURING COST OF MORE THAN $250.00. WE PROPOSE ...

    SBIR Phase I 1990 Department of DefenseNavy
  6. "ELECTRO-DEPOSITION OF SILICON FILMS FROM LIQUID-METAL SOLUTIONS FOR PHOTOVOLTAIC APPLICATIONS"

    SBC: ASTROPOWER, INC.            Topic: N/A

    ELECTRO-DEPOSITION OF SILICON FILMS FROM LIQUID-METAL SOLUTIONS WILL BE INVESTIGATED. THE OBJECTIVE IS TO DEVELOP A LOW-COST PROCESS FOR THE PRODUCTION OF HIGH-EFFICIENCY THIN-FILM PHOTOVOLTAIC DEVICES. SPECIFICALLY, CURRENT-CONTROLLED GROWTH OF A SILICON FILM ON A SUBSTRATE IS ACCOMPLISHED USING A LIQUID-METAL SOLUTION, SUCH AS TIN, AND A SILICON SOURCE ELECTRODE. THE QUALITY OF SILICON GROWN FRO ...

    SBIR Phase I 1990 Department of Energy
  7. HIGH-PERFORMANCE RADIATION-HARD ULTRA-THIN SILICON-UNDER-GLASS SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  8. HIGH-PERFORMANCE RADIATION-HARD ULTRA-THIN SILICON-UNDER-GLASS SOLAR CELLS

    SBC: ASTROPOWER, INC.            Topic: N/A

    N/A

    SBIR Phase I 1990 Department of DefenseMissile Defense Agency
  9. DEVELOPMENT OF HIGH-PERFORMANCE CHEMICALLY RESISTANT COMPOSITE MEMBRANES

    SBC: BEND RESEARCH, INC.            Topic: N/A

    POLYMERIC MEMBRANES HAVE THE POTENTIAL TO PERFORM ENERGY-EFFICIENT SEPARATIONS IN APPLICATIONS IN A GAS- AND VAPOR-SEPARATIONS MARKET THAT TOTALS AT LEAST $750 MILLION. HOWEVER, THE CURRENT SALES OF MEMBRANE SYSTEMS FOR THESE APPLICATIONS IS ONLY A FEW TENS OF MILLIONS OF DOLLARS--PRIMARILY BECAUSE CURRENTLY AVAILABLE MEMBRANES CANNOT WITHSTAND EXPOSURE TO THE HYDROCARBONS AND SOLVENTS OFTEN PRESE ...

    SBIR Phase I 1990 Department of Energy
  10. MEMBRANE-BASED HIGH-PRESSURE GAS-DEHYDRATION MODULE

    SBC: BEND RESEARCH, INC.            Topic: N/A

    NASA IS DEVELOPING WATER-ELECTROLYSIS CELLS TO RECHARGE THE EXTRAVEHICULAR MOBILITY UNIT (EMU) OXYGEN BOTTLES IN FLIGHT. THESE CELLS PRODUCE HIGH-PRESSURE (UP TO 6000-PSI) OXYGEN AND HYDROGEN STREAMS SATURATED WITH WATER VAPOR. THESE GAS STREAMS MUST BE DEHYDRATED TO VERY LOW WATER-CONTENT LEVELS--TYPICALLY AT LEAST TO -70 DEGREES FAHRENHEIT DEW-POINT TEMPERATURE--TO PREVENT VALVES FROM FREEZING O ...

    SBIR Phase I 1990 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government