You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. FEASIBILITY OF SPOKEN LETTER RECOGNITION ON A VLSI NEUROCOMPUTER

    SBC: Adaptive Solutions Inc.            Topic: N/A

    WE PROPOSE TO DEMONSTRATE THE FEASIBILITY OF SPEECH RECOGNITION ON A VLSI NEUROCOMPUTER. THE SPEECH RECOGNITIONSYSTEM WILL PERFORM SPEAKER-INDEPENDENT RECOGNTION OF SPOKENENGLISH LETTERS. THE CURRENT IMPLEMENTATION OF THE SYSTEM, NOW RUNNING IN THE CONTEXT OF A DIRECTORY ASSISTANCE APPLICATION ON A SUN4 WORKSTATION, CLASSIFIES ISOLATED LETTERS OF THE ENGLISH ALPHABET AT 96% ACCURACY-THE BEST REPOR ...

    SBIR Phase I 1991 National Science Foundation
  2. HARDWARE IMPLEMENTATION OF OPTICAL CHARACTER RECOGNITION USING ARTIFICIAL NEURAL NETWORKS

    SBC: Adaptive Solutions Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseDefense Advanced Research Projects Agency
  3. LOW ELEVATION SENSITIVE GPS ANTENNA WITH MULTIPATH SUPPRESSION

    SBC: Adroit Systems, Inc.            Topic: N/A

    ADROIT SYSTEMS, INC. PROPOSES TO DESIGN A NEW ANTENNA FOR A DIFFERENTIAL GPS (DGPS) BASE RECEIVER IN PHASE I, AND TO PROTOTYPE AND TEST THIS ANTENNA IN PHASE II. THIS NEW ANTENNA WILL INCORPORATE OPTIMUM LOW ELEVATION GAIN AND MULTIPATH SUPPRESSION TO ALLOW THE TRACKING OF SATELLITES AT ELEVATIONS FROM THE HORIZON TO FIVE DEGREES. AT ALL ELEVATIONS, THE ANTENNA WILL MINIMIZE ERRORS DUE TO MULTIPAT ...

    SBIR Phase I 1991 Department of Transportation
  4. GLOBAL POSITIONING SYSTEM ATTITUDE CONTROL

    SBC: Adroit Systems, Inc.            Topic: N/A

    A PROTOTYPE GUIDANCE AND CONTROL SYSTEM SENSOR FOR DIRECTED ENERGY WEAPONS IS PROPOSED. THIS GUIDANCE SUBSYSTEM SENSOR WILL USE THE GLOBAL POSITIONING SYSTEM (GPS) SATELLITE CONSTELLATION FOR BOTH POSITION AND ATTITUDE DETERMINATION OF THE DEW. THIS GPS ATTITUDE DETERMINATION SYSTEM CAN BE CAN BE APPLIED FOR POINTING AND ATTITUDE CONTROL OF MANY TYPES OF DEWS, INCLUDING GROUND, AIR, AND SPACE BASE ...

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  5. DYNAMIC GPS ATTITUDE DETERMINING SYSTEM FOR MARINE APPLICATIONS

    SBC: Adroit Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of Transportation
  6. NOAA WEATHER WIRE SERVICE (NWWS) MONITORING

    SBC: Advanced Communication            Topic: N/A

    ACS PROPOSES TO DEVELOP A REAL TIME NWWS PERFORMANCE MONITORING CAPABILITY UTILIZING A 386 PERSONAL COMPUTER, MICROSOFT WINDOWS, AND AN OFF-THE-SHELF SERIAL INTERFACE BOARD. THE ACS DEVELOPED WEATHER WIRE AUTOMATIC MONITORING SYSTEM (WWAMS) WILL PROVIDE THE FOLLOWING FEATURES: A. REAL TIME PERFORMANCE MONITORING, QUALITY CHECKING, REPORT GENERATION, AND USER INTERFACE; B. COLOR, MENU DRIVEN, USER- ...

    SBIR Phase I 1991 Department of Commerce
  7. NON-DEVELOPMENTAL ITEM SOFTWARE APPLICATION TO UNDERSEA WARFARE SYSTEMS

    SBC: Advanced Communication            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseNavy
  8. 128X128 ELEMENT MONOLITHIC DUAL BAND HGCDTE STARING ARRAYS

    SBC: ADVANCED DEVICE TECHNOLOGY, INC.            Topic: N/A

    N/A

    SBIR Phase I 1991 Department of DefenseMissile Defense Agency
  9. REVISION OF AIRCRAFT CARRIER WEIGHT VERTICAL CENTER AND SPACE ALGORITHMS

    SBC: Advanced Marine Enterprises,            Topic: N/A

    THE PROPOSED RESEARCH IS DIRECTED TOWARD THE IMPROVEMENT OF THE RELATIONSHIPS USED DURING THE EARLY STAGES OF U.S. NAVY AIRCRAFT CARRIERDESIGN FOR ESTIMATING WEIGHTS, VERTICAL CENTERS OF GRAVITY (KG) AND REQUIRED AREAS AND VOLUMES. THE PRINCIPAL FOCUS WILL BE ON UPDATING THE RELATIONSHIPS USED IN THE NAYSEA AIRCRAFT CARRIER DESIGN-SYNTHESIS MODEL. SPECIFIC OBJECTIVES WILL BE AS FOLLOWS: (A)TO PROV ...

    SBIR Phase I 1991 Department of DefenseNavy
  10. RADIO FREQUENCY HAZARD MONITORING- USAKA

    SBC: Aeromet, Inc.            Topic: N/A

    AEROMET PROPOSES TO DEVELOP A SENSOR SYSTEM FOR THE PURPOSE OF MONITORING RF FIELD STRENGTH ENERGY. PHASE I WILL CONCENTRATE ON THE DESIGN AND DEVELOPMENT OF A UNIQUE PROGRAMMABLE SENSOR THAT CAN SENSE THE ENERGY IN VARIOUS FREQUENCY BANDS. THE SENSOR WILL ACT AS A STAND ALONE UNIT AND BE POWERED BY SOLAR CHARGED BATTERIES. THE SENSOR WILL BE DESIGNED SO THAT MANY OF THEM CAN BE OPERATED IN CONJUN ...

    SBIR Phase I 1991 Department of DefenseArmy
US Flag An Official Website of the United States Government