Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. A Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    A Multimodal Acoustic Tool for Inline Pipe Inspection 3/19/2018 The US energy transport pipeline system is a longstanding distribution network with most of its still standing pipes being installed between the 1950s–1970s. Due to degradation mechanisms, such as embrittlement, capable of causing a two-fold reduction in fracture toughness, pipe rupture is a major risk. Current nondestructive ins ...

    SBIR Phase I 2018 Department of Transportation
  2. Rapid Assessment of Air Void System in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Proposal title: Rapid Assessment of Air Void System in Fresh Concrete Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume ...

    SBIR Phase II 2018 Department of Transportation
  3. Broken Rail Detection from Flashing Rear End Device

    SBC: CREARE LLC            Topic: 171FR2

    Proposal title: Broken Rail Detection from Flashing Rear End Device Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortu ...

    SBIR Phase II 2018 Department of Transportation
  4. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  5. ADHESIVE MATERIALS FOR SEALING CONDUCTORS AND LIGHT UNITS IN AIRPORT PAVEMENTS.

    SBC: Springborn Materials Science            Topic: N/A

    N/A

    SBIR Phase I 1985 Department of Transportation
US Flag An Official Website of the United States Government