You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors

    SBC: APPLIED ENGINEERING MANAGEMENT CORPORATION            Topic: 161FH1

    Technological Enhancements to Improve and Expand Casual Carpooling in New Corridors 12/05/2016 The overall goal of Phase II of this SBIR project is to demonstrate a working prototype of one or more tools and/or approaches that catalyze casual carpooling in a corridor where it does not exist or to improve casual carpooling in a corridor where it is present but underperforming. Phase II will provi ...

    SBIR Phase II 2017 Department of Transportation
  2. Pedestrian and Cyclist Detection Devices for Transit Buses

    SBC: NOVATEUR RESEARCH SOLUTIONS LLC            Topic: 161FT1

    This SBIR proposal presents a robust and cost-effective pedestrian and cyclist detection and collision warning system for transit buses. It uses inexpensive but robust sensors and incorporates state-of-the-art object detection techniques to enable effective pedestrian and cyclist detection near transit buses in different environmental conditions. The proposed collision warning system exploits meas ...

    SBIR Phase II 2017 Department of Transportation
  3. Train Reporting And Inspection INdex (TRAIN)

    SBC: BENTEN TECHNOLOGIES, INC.            Topic: 151FR5

    Benten Technologies proposes to develop a back-end schema-less, open source, cloud-based database with front-end browser-based, cross-platform JavaScript model library to support locomotive inspection data collection. TRAIN will allow for the logging of inspection data for all types of locomotives including steam, diesel, diesel-electric, and electric locomotives by railroad and locomotive manufac ...

    SBIR Phase II 2017 Department of Transportation
  4. Ride Performance Assessment System (RPAS)

    SBC: DFUZION, INC.            Topic: 151FR9

    To address FRA’s requirements of measuring rail vehicle suspension displacement and integrating this into existing accelerometer-based ride quality systems, dFuzion proposes the development of a comprehensive Ride Performance Assessment System (RPAS). RPAS will leverage the investment and research already made by FRA in its sponsored portable ride quality meter. By extending the ride quality dat ...

    SBIR Phase II 2017 Department of Transportation
  5. Improved Thermal and Acoustic Comfort for Motorcycle Helmets

    SBC: CREARE LLC            Topic: 151NH1

    Use of motorcycles helmets significantly reduces the risk of fatality or serious brain injury to riders in the event of a crash, but riders often do not wear helmets in warm weather because of thermal discomfort. We propose to develop an innovative ventilation and cooling system that will maintain a cool, dry environment inside the helmet while also meeting applicable safety standards. The key the ...

    SBIR Phase II 2017 Department of Transportation
  6. Traffic Intersection Simulation of IntelliDrive, J2735, and DSRC/WAVE with eTEXAS

    SBC: HARMONIA HOLDINGS GROUP, LLC            Topic: 101FH3

    We accelerate the maturity of IntelliDrive applications and unlock the storehouse of modeling detail in TEXAS to organizations building IntelliDrive applications J2735/Dedicated Short Range Communication (DSRC) signal controllers and on-board IntelliDrive systems. We add four SAE J2735 messages: SPAT MapData Basic Safety Messages and Signal Request Message for emergency vehicle preemption. Mapping ...

    SBIR Phase II 2011 Department of Transportation
  7. Portable Active Thermographic Coating Inspection System

    SBC: Fuchs Consulting Inc            Topic: 091FH2

    This proposal seeks to produce a unique thermographic coating inspection system that is customized for the inspection of bridge coatings. The system uses active thermography where IR sources are used to provide controlled heating to a coating system. The presence of a defect in a coating system will result in differences in heat flow, which can be imaged with an infrared camera. An off-the-shel ...

    SBIR Phase II 2011 Department of Transportation
US Flag An Official Website of the United States Government