You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Multimodal Acoustic Tool for Inline Pipe Inspection
SBC: CREARE LLC Topic: 180PH1The United States has a vast network of pipelines used for fuel transport. This infrastructure, installed in 1950–1970, is one of the largest in the world. Yet poor/missing records of the materials used, combined with the overall age and associated environmental degradation effects, often results in unsafe operation. Current non-destructive inspection techniques are only capable of detecting mat ...
SBIR Phase II 2019 Department of Transportation -
Real-Time In-Situ Measurement of Void Fraction and Specific Surface in Fresh Concrete
SBC: CREARE LLC Topic: 171FH2Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume fraction, size, and spacing of these voids are critical. It is importa ...
SBIR Phase I 2017 Department of Transportation -
RailMonitor: Real-Time Broken Rail Detection System
SBC: CREARE LLC Topic: 171FR2Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortunately, current inspection technology does not allow these inspection ...
SBIR Phase I 2017 Department of Transportation -
Improved Thermal and Acoustic Comfort for Motorcycle Helmets
SBC: CREARE LLC Topic: 151NH1Use of motorcycles helmets significantly reduces the risk of fatality or serious brain injury to riders in the event of a crash, but riders often do not wear helmets in warm weather because of thermal discomfort. We propose to develop an innovative ventilation and cooling system that will maintain a cool, dry environment inside the helmet while also meeting applicable safety standards. The key the ...
SBIR Phase II 2017 Department of Transportation -
DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS
SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION Topic: N/ASAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...
SBIR Phase II 1987 Nuclear Regulatory Commission -
SIMULATION MODEL OF AIRCRAFT EVACUATION PROCESS
SBC: Gourary Assoc Inc Topic: N/ATHE FEASIBILITY OF BUILDING A PERSONAL COMPUTER MODEL OF THEEVACUATION PROCESS WILL BE STUDIED, USING AN EXPERIMENTAL MODEL DEVELOPED BY GOURARY ASSOCIATES INC. THE RESULTING MODEL WILL PERMIT THE STUDY AND VISUALIZATION OF PASSENGER MOVEMENTS DURING EVACUATION. IT WILL ALSO ALLOW THE STUDY OF THE EFFECTS OF CROWDING, FIRE, OBSTRUCTIONS, AND OTHER EFFECTS DURING THE EVACUATION PROCESS. THE MODEL W ...
SBIR Phase I 1987 Department of Transportation -
Integration of Advanced Inductive Signature Vehicle Detectors with an Advanced Transportation Controller running under the Real Time Linux Operating System
SBC: Inductive Signature Technologies Inc. Topic: N/AWe propose to determine what outputs from the SSAJ measurement system would be suitable for traffic control applications, to determine what the "real time" needs and accuracies are for measurements of signature, speed, acceleration, and jerk (SSAJ), to integrate the output of our IST-222 Standard Signature Output Card with and Advanced Transportation Contorller (ATC) and finally to demonstrate pro ...
SBIR Phase I 2006 Department of Transportation -
An Intermodal Operations Planning & Coordination System
SBC: Zeta-Tech Associates, Inc. Topic: N/AThis proposed activity will conduct case studies of six selected United States ports to determine whether an integrated terminal information system in each of them might deliver significant benefits to port operators, port users, and shippers. Using the experience of the railroad industry as a guide, problems and possibilities for integrating information flow will be examined. The final report w ...
SBIR Phase II 1998 Department of Transportation -
Feasibility Assessment of an Intelligent System for Real-Time Prediction of Railway Vehicle Response to the Interaction with Track Geometry
SBC: Zeta-Tech Associates, Inc. Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation