You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Tomographic Nanoscopy for Pathogen Identification

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: CBD171003

    This Phase II effort prototypes a minimal volume microscope designed to allow for a 2-D digital holographic imaging concurrent with field of view spectral content at video frame rates. The use of a laser driven IR dual beam frequency comb, coincident with the optical beam path required for a digital holographic image, will allow rapid acquisition of both the spatial and the spectral content associ ...

    SBIR Phase II 2019 Department of DefenseOffice for Chemical and Biological Defense
  2. Advanced DACS Tanks

    SBC: GLOYER-TAYLOR LABORATORIES INC            Topic: MDA18008

    In the Phase I effort, GTL showed that future missile interceptor performance can be substantially increased by the combination of an innovative configuration and a breakthrough composite tank technology. The Phase II effort will include material characterization testing and the fabrication and testing of multiple small-scale tanks. Based on those results, GTL will design, analyze, fabricate and t ...

    SBIR Phase II 2019 Department of DefenseMissile Defense Agency
  3. Sea State Prediction System

    SBC: CREARE LLC            Topic: N172123

    Safe operation of the current Navy lighterage system can be performed in Sea State 3 and below. At present, sea state estimation is made by Navy personnel and is dependent on their level of experience.Creare is developing an automated Sea State Predictor (SSP) to provide a more accurate and reliable determination of the current sea state. The system relies on measurement of heave of the warping tu ...

    SBIR Phase II 2019 Department of DefenseNavy
  4. Microwave Photonic Radiometers for Weather Forecasting and Situational Awareness

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF182001

    Passive Microwave Remote Sensing is currently utilized by AFRL, NASA, NOAA, and others to conduct Earth Science missions, including weather forecasting, early warning systems, and climate studies. Soundings of the atmosphere are conducted near several oxygen and water absorption lines at frequencies of ~20-200 GHz to determine key parameters of the atmospheric state, including temperature and humi ...

    SBIR Phase II 2019 Department of DefenseAir Force
  5. Multimodal Acoustic Tool for Inline Pipe Inspection

    SBC: CREARE LLC            Topic: 180PH1

    The United States has a vast network of pipelines used for fuel transport. This infrastructure, installed in 1950–1970, is one of the largest in the world. Yet poor/missing records of the materials used, combined with the overall age and associated environmental degradation effects, often results in unsafe operation. Current non-destructive inspection techniques are only capable of detecting mat ...

    SBIR Phase II 2019 Department of Transportation
  6. Cybersecurity for Standalone Airgap Systems

    SBC: SIEGE TECHNOLOGIES, LLC            Topic: AF191049

    WriteWarden provides full-time, in-situ data device protection, allowing selected permitted and verified writes to occur to the device, while reliably performing hardware-enforced, full write-protection at all other times. In all instances of unverified writes, WriteWarden is designed to fail safe, prohibiting all modification to the data storage media though not only software assurances, but also ...

    SBIR Phase I 2019 Department of DefenseAir Force
  7. Next Generation Infrared Scene Projector for Testing MWIR Systems

    SBC: Chip Design Systems Inc.            Topic: AF18AT017

    Based on the results of Phase I, we aim to develop a prototype of the high speed dynamic IRSP instrument. This prototype will incorporate the next generation 1Kx1K IRLED array that is compatible with the highly successful and user-tested NSLEDS IRSP. If Phase II of the proposed project is successful, the result will be an upgrade of NSLEDS IRSP system to higher performance and operability. The rea ...

    STTR Phase II 2019 Department of DefenseAir Force
  8. Innovative methods for detecting and characterizing electrical grid topologies and induced electrical power transient events from lights

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: NGA191010

    This effort will develop and demonstrate methods for remotely assessing the status of electrical grids based on the illumination from lights powered by those grids. It will lead to the development of low-cost sensors which can be passively assess grid health over a large scale. This effort will assess grid health by exploiting recent advances in high-spatial, high-temporal resolution imaging and t ...

    SBIR Phase I 2019 Department of DefenseNational Geospatial-Intelligence Agency
  9. A Laboratory Test Facility for CDP Wire Rope

    SBC: CREARE LLC            Topic: N192077

    Cross Deck Pendants (CDP) used to recover aircraft onboard aircraft carriers are exposed to a challenging environment of physical impact, abrasion, and strain which limit life expectancy to approximately 125 arrestment cycles. Three primary effects are known to contribute to CDP failure including tail hook impact, hook slip, and final bending around the hook, although the precise contributions of ...

    SBIR Phase I 2019 Department of DefenseNavy
  10. Network Capable Concurrent Design Facility & Portfolio Digital Engineering Platform

    SBC: InnoVet LLC            Topic: AF192001

    The seeds of failures of Defense projects can often be traced back to poor quality requirements and a lack of portfolio level coherence between associated projects. Because projects have become so complex, 100% paper-based methods are no longer suitable for requirements management. In June 2018, the DoD released its Digital Engineering Strategy which calls on the services to “move the primar ...

    SBIR Phase I 2019 Department of DefenseAir Force
US Flag An Official Website of the United States Government