You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Meis System for Inspection of Pipeline Coating

    SBC: HD LABORATORIES, INC.            Topic: N/A

    Coating disbond on buried pipelines contineus to be a major problem world-wide. Disbonds left unrepaired promote both corrosion and stress-corrosion cracking, which are much more costly to repair. Improved inspection technology is currently needed to detect and characterize disbonds. HD Laboratories, Inc. proposes to refine and test a novel method of detecting and assessing coating disbonds and ...

    SBIR Phase I 2006 Department of Transportation
  2. Ballast Water Exchange Monitoring System

    SBC: GLOSTEN, INC.            Topic: N/A

    The Glosten Ballast Management System developed under SBIR Phase I determined that tracking ballast exchanges was feasible and showed strong commercial viability. Phase II of this project is intended to demonstrate, with a full-scale shipboard installation, that automated tracking of a vessel¿s ballast system is practical and cost effective for both the operator and the regulator. The system is ...

    SBIR Phase II 2003 Department of Transportation
  3. Ballast Water Exchange Monitoring System

    SBC: GLOSTEN, INC.            Topic: N/A

    The Glosten Ballast Management System developed under SBIR Phase I determined that tracking ballast exchanges was feasible and showed strong commercial viability. Phase II of this project is intended to demonstrate, with a full-scale shipboard installation, that automated tracking of a vessel¿s ballast system is practical and cost effective for both the operator and the regulator. The system is ...

    SBIR Phase I 2003 Department of Transportation
  4. Glosten Ballast Management System Technical Proposal- Phase II

    SBC: GLOSTEN, INC.            Topic: N/A

    The Glosten Ballast management System developed under SBIR Phase I determined that tracking ballast exchanges was feasible and showed strong commercial viability. Phase II of this project is intended to demonstrate, with a full-scale shipboard installation, that automated tracking of a vessel's ballast system is practical and cost effective for both the operator and the regulator. The system is ...

    SBIR Phase II 2003 Department of Transportation
  5. Transportation Planning Uses of Commercial Data

    SBC: Kjs Associates, Inc.            Topic: N/A

    For more than three decades, transportation planners have relied on survey data collected specifically for the development of travel forecasting models, which are expensive to collect and maintain on an ongoing basis. There is a plethora of data collected for other reasons that could potentially support transportation planning which is becoming more accessible through technological advances. Use ...

    SBIR Phase II 1998 Department of Transportation
  6. LABORATORY INVESTIGATION OF ATMOSPHERIC EFFECTS ON VORTEX WAKES

    SBC: Flow Research Inc            Topic: N/A

    LABORATORY EXPERIMENTS CONDUCTED IN A STRATIFIED TOW TANK ARE PROPOSED TO CHARACTERIZE VORTEX WAKES UNDER THE INFLUENCE OF ATOMOSPHERIC DISTURBANCE. FLOW RESEARCH HAS DEVELOPED INNOVATIVE TECHNIQUES FOR STRATIFYING THE FLUID IN THE TANK, GENERATING A CURRENT SHEAR AND CREATING AMBIENTTURBULENCE WITH GOOD CONTROL. SUCH CAPABILITIES WOULD FACILITATE THE ISOLATION OF THE EFFECTS OF THE DISTURBANCE S ...

    SBIR Phase II 1987 Department of Transportation
  7. A NEW MAGNETO-OPTIC BASED FLAW IMAGING DEVICE FOR UNDERWATERAPPLICATION

    SBC: Sigma Research Corp            Topic: N/A

    THE PHASE I RESEARCH IS INTENDEDTO DEMONSTRATE THE BASIC FEASIBILITY OF CONSTRUCTING AND OPTIMIZING A NEW MAGNETO-OPTIC 'SANDWICH' DEVICE INTENDED FOR DIRECT VISUALIZATION OF FLAWSIN FERROUS MATERIALS (STEEL) IN A MARINE ENVIRONMENT. THE DEVICE IS BASED IN THE PROPERTY OF SOME MAGNETO-OPTIC GARNETFILMS TO ROTATE THE PLANES OF POLARIZATION OF AN INCIDENT, LINEARLY POLARIZED LIGHT WAVE (FARADAY MAGN ...

    SBIR Phase II 1987 Department of Transportation
  8. RESEARCH TO INVESTIGATE THE POTENTIALS OF ABRASION JET IN TRANSPORT SYSTEMS CONSTRUCTION

    SBC: Fluidyne Corp            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  9. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  10. FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS.

    SBC: Springborn Materials Science            Topic: N/A

    FLAME RETARDANT FLEXIBLE POLYURETHANE FOAM FINDS WIDESPREAD COMMERCIAL USE AS A SEATING MATERIAL DUE TO ITS FAVORABLE COST, SUPPORT, AND RESILIENCE CHARACTERISTICS. HOWEVER, SMOKE AND TOXIC GAS EVOLUTION IN THE EVENT OF FIRE IS A MAJOR PROBLEM. THE GOAL OF THIS PROGRAM IS TO CREATE A FIRE RESISTANT COMPOSITE FOAM STRUCTURE WHICH WILL GENERATE NEGLIGIBLE QUANTITIES OF TOXIC FUMES WHEN EXPOSED TO FI ...

    SBIR Phase I 1984 Department of Transportation
US Flag An Official Website of the United States Government