You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Efficient Arrays for Generating Light Emission (EAGLE)

    SBC: Chip Design Systems Inc.            Topic: AF16AT22

    With today's IRLED devices, >99.4% of input electrical power is converted into parasitic/waste heat. Moreover, as the local temperatures of the pixels increase due to the generated heat, IRLED optical efficiency is further reduced. Overall this severely limits the number and intensity of array pixels that can be simultaneously operated at high apparent temperatures. In Phase 2, we focus on develop ...

    STTR Phase II 2017 Department of DefenseAir Force
  2. A Reconfigurable Machining Center for Depot Productivity Enhancement

    SBC: CREARE LLC            Topic: AF161019

    Current depot-level manufacturing systems are not responsive to changing requirements and flexible specifications. The serial arrangement of individual work cells results in a lengthy timeline to complete the critically-needed part; thus, critical assets

    SBIR Phase II 2017 Department of DefenseAir Force
  3. Reconfigurable Interface Test Adapter

    SBC: Air Logistics and Engineering Solutions, LLC            Topic: AF161014

    ALAE proposes to develop a reconfigurable test adapter (RTA) that adapts differences between existing automated test equipment/ systems (ATE/ ATS) to ensure efficient, cost-effective test program set (TPS) transportability. Wiring from core versatile depot automated test station (VDATS) instrumentation will be routed to the RTA. Various standard unit under test (UUT) interfaces will be explored an ...

    SBIR Phase II 2017 Department of DefenseAir Force
  4. Big Data Cyber Analytics

    SBC: Dynamite Analytics Inc            Topic: AF171042

    Vlabs will define an architecture for a big data cybersecurity solution that will provide a real-time, intuitive and actionable analytics for enhanced situational awareness and rapid response. The system will facilitate automation of key security decisions with a goal to accelerate the attack detection time of highly resourceful adversaries. The system will ingest and analyze various data types an ...

    SBIR Phase I 2017 Department of DefenseAir Force
  5. Optical System for High-Speed 3D Velocimetry

    SBC: CREARE LLC            Topic: AF161071

    Unsteady processes, such as vortex shedding and local extinction, play a key role in augmentor stability.These processes occur on fast timescales, and can involve complex, three-dimensional (3D) structures.To fully elucidate unsteady processes, such as flame ignition and blowout, fast diagnostics that can provide information over a 3D volume are needed.In this research program, we are developing a ...

    SBIR Phase II 2017 Department of DefenseAir Force
  6. Antimony-based LWIR detectors with low dark current and high quantum efficiency

    SBC: QMAGIQ LLC            Topic: AF171078

    QmagiQ, LLC proposes to fabricate and deliver for evaluation a number of small-format focal plane arrays (FPAs) of antimony-based strained layer superlattice (SLS) photodiodes with longwave infrared (LWIR) cutoff wavelengths ranging from 9 microns to 13 m

    SBIR Phase I 2017 Department of DefenseAir Force
  7. Realtime Multiframe Blind Deconvolution (MFBD) for Imaging through Turbulence

    SBC: Argos Intelligence, LLC            Topic: AF171025

    Argos Intelligence proposes to develop BLINDER to significantly enhance Low Earth Orbit (LEO) imagery that is distorted by atmospheric turbulence. The proposed system will utilize state of the art turbulence mitigation through multiple frame blind deconv

    SBIR Phase I 2017 Department of DefenseAir Force
  8. LWIR Fiber Bundle for Thermal Imaging in Gas Turbine Systems

    SBC: CREARE LLC            Topic: AF17AT016

    Improved temperature measurements of thermal barrier coating (TBC) components are needed for gas turbine research and development.Imaging pyrometry systems are preferred because they are non-contact and can measure the complex spatial temperature distribution on components.Measurement in the long-wave infrared (LWIR) band is required for accurate temperature measurements of modern TBCs.Fiber coupl ...

    STTR Phase I 2017 Department of DefenseAir Force
  9. Integrable High-Performance Analog Optical Modulators

    SBC: PHASE SENSITIVE INNOVATIONS INC            Topic: AF171126

    In this SBIR effort we will develop broadband, low V, high linearity, thin-film lithium niobate on insulator (LNOI) modulators that are fully compatible with silicon photonic integrated circuits (PIC) foundry processes. Developing such devices as well a

    SBIR Phase I 2017 Department of DefenseAir Force
  10. Tools for Cross-Platform Software Development and Performance Projection

    SBC: EM PHOTONICS INC            Topic: AF161088

    Developers of modern software, particularly those targeting mobile or embedded platforms, are presented with a wide variety of hardware choices. Solutions can be built on microprocessors (e.g. x86, ARM, or Power architecture), GPUs (e.g. NVIDIAs Tegra), DSPs, FPGAs, or some combination of these technologies. Not only does this place a significant burden on programmers in understanding the intricac ...

    SBIR Phase II 2017 Department of DefenseAir Force
US Flag An Official Website of the United States Government