You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  2. Improved Thermal and Acoustic Comfort for Motorcycle Helmets

    SBC: CREARE LLC            Topic: 151NH1

    Use of motorcycles helmets significantly reduces the risk of fatality or serious brain injury to riders in the event of a crash, but riders often do not wear helmets in warm weather because of thermal discomfort. We propose to develop an innovative ventilation and cooling system that will maintain a cool, dry environment inside the helmet while also meeting applicable safety standards. The key the ...

    SBIR Phase II 2017 Department of Transportation
  3. Integration of Advanced Inductive Signature Vehicle Detectors with an Advanced Transportation Controller running under the Real Time Linux Operating System

    SBC: Inductive Signature Technologies Inc.            Topic: N/A

    We propose to determine what outputs from the SSAJ measurement system would be suitable for traffic control applications, to determine what the "real time" needs and accuracies are for measurements of signature, speed, acceleration, and jerk (SSAJ), to integrate the output of our IST-222 Standard Signature Output Card with and Advanced Transportation Contorller (ATC) and finally to demonstrate pro ...

    SBIR Phase I 2006 Department of Transportation
  4. MULTI-MODE TRANSIT ACCOUNTING".

    SBC: Paperless Acct. Trans. Tech            Topic: N/A

    FEASIBILITY OF USING MICROPROCESSOR BASED PERSONAL TOKEN DEVICES INDUCTIVELY COUPLED FOR BI-DIRECTIONAL INFORMATION FLOW WILL BE STUDIED FOR TRANSIT FARE COLLECTION AND ACCOUNTING. A SIMPLE MICROPROCESSOR BASED USER TOKEN WILL BE DEVELOPED PRINCIPALLY TO TEST COUPLING AND SOFTWARE CONCEPTS. HARDWARE AND SOFTWARE INTERFACES TO EXISTING TURNSTILE EQUIPMENT WILL BE STUDIED. RESEARCH ON APPROPRIATE RE ...

    SBIR Phase I 1984 Department of Transportation
  5. RailMonitor: Real-Time Broken Rail Detection System

    SBC: CREARE LLC            Topic: 171FR2

    Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortunately, current inspection technology does not allow these inspection ...

    SBIR Phase I 2017 Department of Transportation
  6. Real-Time In-Situ Measurement of Void Fraction and Specific Surface in Fresh Concrete

    SBC: CREARE LLC            Topic: 171FH2

    Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume fraction, size, and spacing of these voids are critical. It is importa ...

    SBIR Phase I 2017 Department of Transportation
  7. URBAN TRANSIT COST RECOVERY FEASIBILITY STUDY

    SBC: Williams-kuebelbeck & Assc Inc            Topic: N/A

    URBAN TRANSIT IMPROVEMENTS ENHANCE THE VALUE OF THE PROPERTY THEY SERVE. TRADITIONAL URBAN TRANSIT FINANCING TECHNIQUES NEGLECT THIS POTENTIAL SOURCE OF REVENUE. BENEFIT ASSESSMENT DISTRICTS AND IMPACT MITIGATION FEES, BASED ON CONCEPTS ORIGINALLY DEVISED FOR MINOR IMPROVEMENTS (EG. SIDEWALKS), HAVE BEEN APPLIED EXPERIMENTALLY TO URBAN TRANSIT, BUT DO NOT GENERATE THE MAJOR FUNDING URBAN TRANSIT R ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government