You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Real-Time In-Situ Measurement of Void Fraction and Specific Surface in Fresh Concrete
SBC: CREARE LLC Topic: 171FH2Water expansion during freeze-thaw cycles can cause deterioration in concrete, leading to scaling, cracking, and crumbling over a period of years. Resistance to this damage is achieved with a system of voids formed by adding surfactants to the fresh concrete to stabilize air bubbles naturally entrained during mixing. The volume fraction, size, and spacing of these voids are critical. It is importa ...
SBIR Phase I 2017 Department of Transportation -
RailMonitor: Real-Time Broken Rail Detection System
SBC: CREARE LLC Topic: 171FR2Broken rails are a common cause of mainline derailments and a particular concern given the increasing use of our rail system for passenger traffic and petroleum products. The progressive nature of the defects provides an opportunity for early detection of cracks before they become significant enough to cause a derailment. Unfortunately, current inspection technology does not allow these inspection ...
SBIR Phase I 2017 Department of Transportation -
Improved Thermal and Acoustic Comfort for Motorcycle Helmets
SBC: CREARE LLC Topic: 151NH1Use of motorcycles helmets significantly reduces the risk of fatality or serious brain injury to riders in the event of a crash, but riders often do not wear helmets in warm weather because of thermal discomfort. We propose to develop an innovative ventilation and cooling system that will maintain a cool, dry environment inside the helmet while also meeting applicable safety standards. The key the ...
SBIR Phase II 2017 Department of Transportation -
Automated parking-cruising detection and measurement using Bluetooth AVI Sensor network
SBC: RAPID FLOW TECHNOLOGIES Topic: 142FH2Searching for street parking, a behavior known as cruising for parking, leads to excess congestion and pollution. Many recent smart parking interventions have attempted to address this issue, but the problem of effectively detecting and measuring cruising remains largely unsolved. The goal of this work is to develop methods to detect and measure cruising for parking and its effects on congestion u ...
SBIR Phase II 2017 Department of Transportation -
POST CRASH AIRCRAFT FUEL-FED PREVENTION
SBC: BELTRAN, INC. Topic: N/AN/A
SBIR Phase I 1987 Department of Transportation -
DEMONSTRATING THE PROFITABILITY OF LINKING PRIVATE DEVELOPMENT USING THE HORIZONTAL DEVELOPMENT PROCESS (HOP) TO PROVIDE FREE INCREMENTS OF TRANSIT FOR THE PUBLIC.
SBC: Cityscope & Mobility Co Topic: N/APRIVATE INVESTMENTS IN TRANSPORTATION CAN BE PROFITABLE. THE HORIZONTAL DEVELOPMENT PROCESS (HDP), EMPLOYING A SPECIALIZED FORM OF PEOPLE-MOVER AS A HORIZONTAL ELEVATOR (H*E), MAXIMIZES THE DEVELOPMENT POTENTIAL, REDUCES THE RISK OF HIGH COSTS OR LOW INVESTMENT RETURN. AN HDP GUIDE WITH INDEPENDENT FINANCIAL APPRAISALS INCLUDING PROFORMA DATA AND PRELIMINARY UTAG (URBAN TRANSPORTATION ACTION GRANT ...
SBIR Phase I 1987 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 2001 Department of Transportation -
Innovative Multi-cellular Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase II 2001 Department of Transportation -
Innovative Multi-Celluar Pultruded Composite Guardrail
SBC: Creative Pultrusions, Inc Topic: N/AN/A
SBIR Phase I 1998 Department of Transportation -
Feasibility of an ultrasonic based instrument for assessing in-situ pipeline coatings
SBC: FBS INC Topic: N/AFBS, Inc. proposes to establish the feasibility of an ultrasonically based device for in-situ evaluation of pipeline coatings and for the archiving of coating properties. Based on our experience gained through DOT and EPRI sponsored work on long range ultrasonics, buried pipes, and tar coated pipes we recognize the need for coating characterization not only as an important factor for inspection d ...
SBIR Phase I 2005 Department of Transportation