You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. HYBRID POLYMERIC GLAZING MATERIALS

    SBC: Rolltrusion Inc.            Topic: N/A

    A NEW PROCESS IS PROPOSED FOR THE APPLICATION OF POLYMERIC MATERIALS FOR AUTOMOTIVE WINDOWS. SEMI-CRYSTALLINE POLYMERIC MATERIALS CAN BE RENDERED CLEAR THROUGH 3-D ORIENTATION VIA SOLID STATE PROCESSING. APPLYING THIS TECHNOLOGY TO A HYBRID POLYMER STRUCTURE CAN RESULT IN CHEMICALLY RESISTANT, MECHANICALLY STRONG, OPTICALLY CLEAR AND ECONOMICALLY VIABLE PLASTIC WINDOWS FOR GROUND TRANSPORTATION.

    SBIR Phase I 1993 Department of Transportation
  2. DEMONSTRATING THE PROFITABILITY OF LINKING PRIVATE DEVELOPMENT USING THE HORIZONTAL DEVELOPMENT PROCESS (HOP) TO PROVIDE FREE INCREMENTS OF TRANSIT FOR THE PUBLIC.

    SBC: Cityscope & Mobility Co            Topic: N/A

    PRIVATE INVESTMENTS IN TRANSPORTATION CAN BE PROFITABLE. THE HORIZONTAL DEVELOPMENT PROCESS (HDP), EMPLOYING A SPECIALIZED FORM OF PEOPLE-MOVER AS A HORIZONTAL ELEVATOR (H*E), MAXIMIZES THE DEVELOPMENT POTENTIAL, REDUCES THE RISK OF HIGH COSTS OR LOW INVESTMENT RETURN. AN HDP GUIDE WITH INDEPENDENT FINANCIAL APPRAISALS INCLUDING PROFORMA DATA AND PRELIMINARY UTAG (URBAN TRANSPORTATION ACTION GRANT ...

    SBIR Phase I 1987 Department of Transportation
US Flag An Official Website of the United States Government