You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Individualized Fatigue Management Program Technology for Trucking Operations

    SBC: PULSAR INFORMATICS, INC.            Topic: 091FM1

    Individual differences in vulnerability to sleep loss and fatigue from extended work hours and night work are a substantial problem in transportation policy making, work schedule development, fatigue risk management strategies, and prediction of performance impairment in real-world operations (Van Dongen et al. 2003; Mollicone et al. 2010). Our group was the first to document the considerable magn ...

    SBIR Phase II 2012 Department of Transportation
  2. IMPROVEMENT IN THE GRAPHITE REFERENCE CELL FOR REINFORCED CONCRETE

    SBC: GINER INC            Topic: N/A

    FOR CATHODIC PROTECTION SYSTEMS TO BE SUCCESSFUL IN MITIGATING CORROSION WITHOUT CAUSING HYDROGEN EMBRITTLEMENT OF PRESTRESSING STEEL, THE AMOUNT OF POLARIZATION OF THE EMBEDDED STEEL MUST BE VERY ACCURATELY CONTROLLED. PRESENTLY AVAILABLE EMBEDDED REFERENCE ELECTRODES DO NOT HAVE THE LONG TERM STABILITY OR RELIABILITY RE@UIRED TO MONITOR AND CONTROL THE AMOUNT OF POLARIZATION WITH THE ACCURACY RE ...

    SBIR Phase II 1993 Department of Transportation
US Flag An Official Website of the United States Government