You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
PASSIVE TMA USING ITERATED KALMAN FILTERS AND GAUSSIAN SUMS
SBC: DANIEL H WAGNER ASSOCIATES INC Topic: N/ADHWA PROPOSES TO DEVELOP ALGORITHMS FOR LONG-RANGE, PASSIVE TARGET MOTION ANALYSIS (TMA). THE ALGORITHMS WILL USE EXTENDED FILTERS SIMILAR TO THOSE FOUND IN CURRENT ALGORITHMS (JASA, MPKAST, AND MTST), BUT WILL UNIFY AND EXTEND THESE TECHNIQUES IN IMPORTANT WAYS. WE HOPE TO ELIMINATE MOST OF THE PROBLEMS ASSOCIATED WITH CURRENT METHODS. THE DIFFERENCES AMONG CURRENT ALGORITHMS, AND THEIR LIMITATIO ...
SBIR Phase II 1993 Department of DefenseNavy -
AN INFORMATION SYSTEM FOR ECM/ESM CONTACTS
SBC: DANIEL H WAGNER ASSOCIATES INC Topic: N/ATHE PROPOSED PROJECT IS TO DEVELOP AN INFORMATION SYSTEM FOR PROCESSING ECM/ESM CONTACT REPORTS ON BOARD A NAVY SURFACE SHIP. THE SYSTEMWILL COMBINE REPORTS FROM ORGANIC AND REMOTE (0TH) SENSORS WITH OTHER AVAILABLE INFORMATION AND WITH REASONABLE ASSUMPTIONS CONCERNING TARGET TACTICS IN ORDER TO PROVIDE INFORMATION OF VALUE TO THE MISSION COMMANDER. OUR APPROACH IS TO COMBINE TWO EXISTING SYSTEMS ...
SBIR Phase II 1993 Department of DefenseNavy -
FLUCTUATION PROCESSES FOR USE IN ACOUSTIC DETECTION MODELS
SBC: DANIEL H WAGNER ASSOCIATES INC Topic: N/AOPERATIONS ANALYSIS OF NAVAL ENGAGEMENTS REQUIRES A MODEL FOR THE DETECTION PROCESS, AND IN PARTICULAR, FOR PASSIVE ACOUSTIC SENSORS. SUCH MODELS DEPEND IN TURN ON HAVING A MODEL FOR ACOUSTIC FLUCTUATIONS, A TERM WHICH TYPICALLY DESCRIBES ALL RESIDUAL UNCERTAINTY IN THE SONAR EQUATION COMPONENTS. THIS PROJECT WILL DEVELOP A RATIONALE FOR AN ACOUSTIC FLUCTUATION PROCESS WHICH IS A COMPOSITE OF PROC ...
SBIR Phase II 1993 Department of DefenseNavy -
TACTICAL/OPERATOR AIDS
SBC: Esscube Engineering Inc. Topic: N/ATHE S-3B AIRCRAFT IS THE LEAD PLATFORM FOR THE ACTIVE BLOCK UPGRADEPROGRAM FOR INTEGRATION AND UTILIZATION OF THE ERAPS AND ADAR SYSTEMS. BECAUSE OF THE QUANTITY AND COMPLEXITY OF OPERATOR CHOICES IN DEPLOYING AND USING THESE SYSTEMS, TACTICAL OPERATOR AIDS WILL BE REQUIRED FOR THE INTEGRATION AND UTILIZATION OF THESE NEW ACTIVE SYSTEMS. IN THIS PHASE I STUDY, SPECIFIC AIDS ARE TO BE IDENTIFIED FO ...
SBIR Phase II 1993 Department of DefenseNavy -
HIGH TEMPERATURE BORON-TITANIUM CHEMISTRY WITH WATER
SBC: GENERAL SCIENCES INC Topic: N/AGENERAL SCIENCES, INCORPORATED (GSI) PROPOSES THE THERMOCHEMICAL AND KINETIC NALYSIS OF THE TI + B + H20 REACTION SYSTEM. THE HIGHLY EXOTHERMIC NATURE OF THE TITANIUM/BORON REACTION IN ITS GENERIC STATE AND IN COMBINATION WITH BINDERS AND OXIDIZERS HAS BEEN EXTENSIVELY INVESTIGATED BY GSI WITH SEVERAL FORMULATIONS UNDER PATENT FOR SPECIFIC DOD APPLICATIONS. THE PRESENT EFFORT IDENTIFIES METHODS AN ...
SBIR Phase II 1993 Department of DefenseNavy -
DATA RELAY SYSTEM
SBC: Microcom Corp Topic: N/AMicrocom will design a secure Data Relay System for transmission of GPS position, platform sensor, and weapons event data collected from a large number of fleet exercise participants distributed over an extended open-ocean area. We plan to modify our existing R Cubed Transponder (AN/URY-3) design to yield a 400 percent increase in data throughput and add a GPS receiver and Inertial Guidance unit f ...
SBIR Phase II 1993 Department of DefenseNavy -
DUAL TRANSPONDER FOR RANGING AND DATA COMMUNICATION
SBC: Microcom Corp Topic: N/AMicrocom will design a Dual Frequency Transponder which will be compatible with the requirements of both the Tactical Aircrew Combat Training System (TACTS) and the Mobile Sea Range (MSH) system. We will modify our existing R-Cubed Transponder (AN/URY-3) by adding an L Band Transceiver to provide the data relay link for TACTS ranges with a Transponder volume target goal of 108 cubic inches. We pla ...
SBIR Phase II 1993 Department of DefenseNavy -
SYNTHETIC GENERATION OF DYNAMIC INFRARED SCENES
SBC: NAVMAR APPLIED SCIENCES CORP Topic: N/ACOMMERCIALLY AVAILABLE SYNTHETIC SCENE GENERATION SYSTEMS WILL BE INVESTIGATED AS A BASELINE SYSTEM FROM WHICH INFRARED IMAGERY CAN BE CREATED. TRADEOFFS WILL BE MADE REGARDING THE SCENE REALISM REQUIRED FOR SENSOR EVALUATION AND THE COST TO ACHIEVE THIS REALISM. REPRESENTATIVE SIGNATURES OF VARIOUS TERRAINS, TERRAIN FEATURES AND TARGETS WILL BE CREATED THAT PRESENT THE THERMAL CHARACTERISTICS ASS ...
SBIR Phase II 1993 Department of DefenseNavy -
EMISSION STRATEGIES AND OPERATIONS IN MODERN NAVAL COMBAT SYSTEMS
SBC: Adler Consultants, Inc. Topic: N/AEMISSION CONTROL (EMCON), INCLUDING RADAR EMISSION MANAGEMENT, IS A SUBDIVISON OF THE MUCH GREATER SUBJECT OF BATTLE MANAGEMENT. AT PRESENT, THERE IS NOT A FULL DEVELOP AND NAVY ACCEPTED TECHNIQUE FOR EXAMINING THE ENTIRE TECHNICAL MANAGEMENT OF POTENTIAL SEA BATITLES. THIS PROPOSED EFFORT WILL FOCUS ON A VALUABLE SUBSET OF BATTLE STRATEGY, THE INTERPLAY BETWEEN ELECTROMAGNETIC EMISSION CONTROL AN ...
SBIR Phase II 1985 Department of DefenseNavy -
USE OF ROBOTICS IN AUTOMATIC FACTORY ASSEMBLY
SBC: ANALYTICAL BIOLOGICAL SERVICES, INC. Topic: N/ATHIS PROJECT WILL INVESTIGATE THE TECHNICAL FEASIBILITY OF USING A CLUSTER CONTROLLER AND OFF-LINE PROGRAM DEVELOPMENT SYSTEM FOR A CLUSTER OF INDUSTRIAL ROBOTS, PROGRAMMABLE CONTROLLERS AND VISION SYSTEMS IN A FACTORY ENVIRONMENT FOR THE PURPOSE OF LOW VOLUME ASSEMBLY. THE FOLLOWING ISSUES WILL BE INVESTIGATED: 1. USE FLEXIBLE TOOLING/GRIPPERS/HANDS FOR ASSEMBLY TASKS USING ROBOT 2. USE OF IEEE 8 ...
SBIR Phase II 1985 Department of DefenseNavy