You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Simulation of Critical Interior Ballistic Effects

    SBC: 3c Systems, Inc.            Topic: N/A

    During launching of regenerative liquid propellant guns, the projectiles and their components experience potentially damaging high pressure/high frequency oscillations. The purpose of this program is to develop the experimental and computational facilities to simulate these effects. The three major objectives to be accomplished in Phase I are: (1) To develop a method of inducing forced vibrations ...

    SBIR Phase II 1995 Department of DefenseArmy
  2. Non-Cooperative Combat Identification using Multispectral Imaging

    SBC: Advanced Materials Corp            Topic: N/A

    We propose development of a 'smart' optical preprocessor that installs as an integral part of the light gathering optics of first- or second-generation forward looking infrared imaging systems (FLIRs). This optical preprocessor is based on an advanced-art imaging acousto-optic tunable filter (aka, A-O filter). These newly-configured A-O filters are programmable to seek out specific spectral featur ...

    SBIR Phase II 1995 Department of DefenseArmy
  3. Permanent magnets with extremely high energy product for electromechanical devices

    SBC: Advanced Materials Corp            Topic: N/A

    The theoretical maximum energy product of intermetallic compounds Nd2Fe14B and Pr2Fe14B is as high as 64 M Oe at room temperature. However, the actual energy product achieved in the laboratory is ~50 M Oe and the best commercial magnets exhibit only ~45 MG Oe. The inability to fabricate magnets with energy products close to 64 MG Oe is caused in part by 1) an imperfect grain alignment and 2) the p ...

    SBIR Phase II 1995 Department of DefenseArmy
  4. "Safety Seat and Restraint System"

    SBC: ARCCA, INC.            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of Transportation
  5. Visual Programming Language Development, an Environment of Language, Real Time, and Parallel Process Development

    SBC: Centre International            Topic: N/A

    This is a proposal for development of a visual programming environment. This would permit programs to be designed and implemented in terms of diagrams, possibly data-flow diagrams. Whereas flow diagrams have been used for a while, it will now be possible to use them as actual programs, rather than just as program-development aids. The visual-programming environment will encourage reuse of compon ...

    SBIR Phase I 1995 Department of DefenseArmy
  6. Human Operator Model Baseline Architecture Simulation (HOMBAS)

    SBC: CHI SYSTEMS INC            Topic: N/A

    CHI Systems proposes to develop a Human Operator Model Baseline Architecture Simulation (HOMBAS) based on our existing Human Operator Model Management Environment (HOMME) model and architecture. HOMBAS will be designed primarily for integration into simulations of complete systems, to permit human contributions to total system performance to be appropriately reflected in simulation-based evaluatio ...

    SBIR Phase II 1995 Department of DefenseArmy
  7. Development of Integrated Tactical Decision Aid for Battle Management

    SBC: CHI SYSTEMS INC            Topic: N/A

    AirLand Battle and AirLand Operations doctrines require quick, accurate decision-making in order to achieve the synchronicity and agility needed to execute the doctrine. Current decision makin aids at the tactical level are almost exclusively manual and failr to adequately integrate all combat power multipliers, such as artillery, intelligence, logistics, etc., into single integrated decision aids ...

    SBIR Phase II 1995 Department of DefenseArmy
  8. Commander's Intelligent Battlefield Information Display (CIBID)

    SBC: CHI SYSTEMS INC            Topic: N/A

    N/A

    SBIR Phase I 1995 Department of DefenseArmy
  9. Modular Omnibus Program with Internal Checking (MOPIT)

    SBC: Conway Enterprises            Topic: N/A

    The problem addressed here is how to structure a computer program (MOPIT) which can choose from a library of computer modules to solve a new problem defined by the user. The modules must have common naming conventions, appropriate linking and have suitable input-output provisions. A preprocessor will also be supplied as part of the proposed research. The preprocessor using information supplied ...

    SBIR Phase I 1995 Department of DefenseArmy
  10. Electrodeposited Transformer Core for High Efficiency Power Supplies

    SBC: Damaskos, Inc.            Topic: N/A

    A thin film power supply is proposed based on a new thin film magnetic material for the transformer core which will result in a high efficiency, ultra compact transformer capable of MHz operation. This transformer will consist of a thin film core in combination with thin film windings and will be compatible with direct integration onto IC components. This magnetic core will be fabricated using a ...

    SBIR Phase I 1995 Department of DefenseArmy
US Flag An Official Website of the United States Government