You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. COMPUTERIZED EMERGENCY OPERATION PROCEDURES RESEARCH

    SBC: Accident Prevention Group            Topic: N/A

    THE PURPOSE OF PHASE I OF THIS RESEARCH PROJECT IS TO CRITICALLY REVIEW THE EXISTING COMPUTERIZED EOP SYSTEMS FOR BOTH PWR AND BWR PLANTS, DEVELOPED BY VARIOUS NATIONAL AND INTERNATIONAL ORGANIZATIONS TO FULLY UNDERSTAND THEIR ADVANTAGES, DISADVANTAGES AND LIMITATIONS IN TERMS OF THEIR IMPACT ON OPERATORS PERFORMANCE AND RELIABILITY AND RECOMMEND ONE SYSTEM OR A COMPOSITE OF SEVERAL SYSTEMS, BEFOR ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  2. AN ADAPTING FINITE ELEMENT MODEL FOR UNSATURATED POROUS MEDIA

    SBC: Advanced Projects Research, Incorporated            Topic: N/A

    A TWO-DIMENSIONAL NUMERICAL MODEL BASED ON A HYBRID FINITE ELEMENT METHOD WITH MESH ADAPTATION IS PROPOSED TO CALCULATE GROUNDWATER FLOW AND POLLUTANT TRANSPORT IN UNSATURATED POROUS MEDIA. THE ALGORITHM IS MODIFIED TO ENHANCE COMPUTATIONAL SPEED AND STORAGE, AND INCORPORATES PETROV-GALERKIN WEIGHTING FOR THE ADVECTION TERMS. NONLINEARITIES ASSOCIATED WITH UNSATURATED SOIL PROPERTIES, ATMOSPHERIC ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  3. DEVELOPMENT OF TOOLS FOR SAFETY ANALYSIS OF CONTROL SOFTWARE IN ADVANCED REACTORS

    SBC: Advanced Systems Concepts            Topic: N/A

    THIS RESEARCH WILL EXECUTE AN INDEPTH STUDY OF THE BASIC FEATURES OF EMBEDDED SYSTEM AND PLANT PROCESS SOFTWARE, INCLUDING ITS INTERACTIONS WITH THE HARDWARE SYSTEMS THAT IT IS INTENDED TO CONTROL AND REGULATE. THE PURPOSE OF SUCH A STUDY WILL BE TO IDENTIFY THE PROCEDURES AND ANALYTICAL TECHNIQUES, TO BE INTEGRATED IN AN EMBEDDED SYSTEM SOFTWARE ANALYSIS METHODOLOGY, THAT CAN BE OF GREATEST UTILI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  4. ADVANCED FARE PAYMENT MEDIA

    SBC: Echelon Industries Inc.            Topic: N/A

    THE FEASIBILITY OF SMART CARDS FOR THE PUBLIC TRANSIT INDUSTRY HAS NOT BEEN ESTABLISHED. THERE IS A PERCEPTION THAT SMART CARDS CAN BE USED TO REDUCE THE TOTAL TRANSACTIONCOSTS ASSOCIATED WITH FARE PAYMENT, TO IMPROVE SECURITY, REDUCE FRAUD AND IMPROVE SYSTEM PERFORMANCE AND RIDERSHIP. THE OBJECTIVE OF THIS PROGRAM IS TO DETERMINE THE APPROPRIATENESS OF THESE CLAIMS; THIS WILL BE ACCOMPLISHED BY R ...

    SBIR Phase II 1993 Department of Transportation
  5. TURBINE ENGINE ROTOR SYSTEM FAILURE PREDICTION AND PREVENTION

    SBC: Systems Control Technology,            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A METHODOLOGY AND A PROTOTYPE DESIGN FOR A SYSTEM CAPABLE OF PREDICTING FAILURE OF ROTATING PARTS IN TURBINE ENGINES. SCT PROPOSES AN INNOVATIVE, INTEGRATED APPROACH THAT ASSIMILATES DATA FROM MULTIPLE SOURCES TO TREND ENGINE PERFORMANCE AND HEALTH. INDICATIONS OF COMPONENET FAILURE WILL BE IDENTIFIED AND ACTUAL DATA WILL BE COMPARED AGAINST THE INDICAT ...

    SBIR Phase II 1993 Department of Transportation
  6. AUTOMATED TERCOM PLACEMENT AND EVALUATION

    SBC: Systems Control Technology,            Topic: N/A

    DETERMINING SITES TO BUILD NEW TERCOM MAPS HAVE PROVEN TO BE A VERY COMPLICATED AND TIME CONSUMING TASK, AS EVIDENCED IN BOTH SIOP CRUISE MISSILE PLANNING AND OPERATION DESERT STORM. THE CRUISE MISSILE PLANNER, WITH SOME DIFFICULTY, CAN DETERMINE NEEDED CANDIDATE TERCOM SITES, BUT ALL TOO OFTEN, BECAUSE OF INSUFFICIENT TERRAIN ROUGHNESS, THE DEFENSE MAPPING AGENCY (DMA) IS UNABLE TO CREATE A TERCO ...

    SBIR Phase II 1993 Department of DefenseDefense Threat Reduction Agency
  7. A LOW-COST OPTICAL WEATHER IDENTIFIER FOR AN AUTOMATED WEATHER OBSERVING SYSTEM

    SBC: DYNAMICS TECHNOLOGY, INC.            Topic: N/A

    THE IDENTIFICATION OF THE TYPE OF PRECIPITATION (RAIN, SNOW, FOG/HAZE, HAIL) HAS TRACTIONALLY RELIED ON HUMAN JUDGMENT. RECENTLY, THE WAVE PROPAGATION LABORATORY OF DEVELOPED A TECHNOLOGY FOR AUTOMATIC WEATHER IDENTIFICATION USING LASER SCINTILLATION AND SCATTERING. THE TECHNIQUE HAS BEEN SUCCESSFULLY TESTED IN FIELD OPERATION. HOWEVER, THE SYSTEM IS TOO CLUMSY AND EXPENSIVE FOR LARGE-SCALE FIELD ...

    SBIR Phase II 1985 Department of Transportation
  8. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
  9. PROBABILITY OF FLOODS WITH VERY LONG RETURN PERIODS

    SBC: Linsley Kraeger Associates Ltd            Topic: N/A

    THIS PROPOSAL IS DIRECTED TO THE DEVELOPMENT OF A PROCEDURE FOR GENERATING LONG STREAMFLOW SEQUENCES. IT IS PROPOSED TO FIRST DEVELOP A LONG SEQUENCE OF HOURLY RAINFALL BY STOCHASTIC METHODS AND TO TRANSFORM THIS RAINFALL SEQUENCE INTO STREAMFLOW WITH A DETERMINISTIC HYDROLOGIC MODEL. PHASE I WILL FOCUS ON THE A STOCHASTIC RAINFALL MODEL CAPABLE OF DEVELOPING RAINFALL SEQUENCES AT MULTIPLE SITES. ...

    SBIR Phase II 1985 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government