You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED FARE PAYMENT MEDIA

    SBC: Echelon Industries Inc.            Topic: N/A

    THE FEASIBILITY OF SMART CARDS FOR THE PUBLIC TRANSIT INDUSTRY HAS NOT BEEN ESTABLISHED. THERE IS A PERCEPTION THAT SMART CARDS CAN BE USED TO REDUCE THE TOTAL TRANSACTIONCOSTS ASSOCIATED WITH FARE PAYMENT, TO IMPROVE SECURITY, REDUCE FRAUD AND IMPROVE SYSTEM PERFORMANCE AND RIDERSHIP. THE OBJECTIVE OF THIS PROGRAM IS TO DETERMINE THE APPROPRIATENESS OF THESE CLAIMS; THIS WILL BE ACCOMPLISHED BY R ...

    SBIR Phase II 1993 Department of Transportation
  2. LOW COST ACOUSTIC SENSORS SUITABLE FOR HIGH DENSITY ARRAY DEPLOYMENT

    SBC: Optiphase, Inc.            Topic: N/A

    OUR PROPOSAL DEFINES A DETAILED APPROACH TO DEVELOP A HIGH DENSITY ACOUSTIC ARRAY TO MONITOR AMBIENT ACOUSTIC CONDITIONS. WE PROPOSE AN INNOVATIVE APPROACH INVOLVING PASSIVE INTERROGATION OF FIBER OPTIC INTERFEROMETRIC SENSORSWHICH REQUIRE NO ELECTRONICS TO OPERATE THE TELEMETRY OR SENSORS. THE PROPOSED CONFIGURATION UTILIZING RUGGED SILICAMATERIALS IS CAPABLE OF HIGH ACCURACY OVER SEVERE ENVIRONM ...

    SBIR Phase II 1993 Department of Commerce
  3. HOLOGRAPHIC DIAGNOSTICS FOR RAPID SOLIDIFICATION PROCESSING & OSPREY RESEARCH

    SBC: STRATONICS INC            Topic: N/A

    VARIOUS TYPES OF RAPID SOLIDIFICATION PROCESSES, RSP, ARE CRITICAL AEROSPACE TECHNOLOGIES SUPPORTING THE TRANSITION FROM NICKEL BASED SUPERALLOYS TO BIMETALLIC ALLOYS. PULSED LASER HOLOGRAPHY OFFERS THE POTENTIAL FOR RESOLVING THE MICROSCOPIC DETAILS OF RSP ATOMIZATION, OSPREY, AND PLASMA DEPOSITION PROCESSES; THEREBY PROVIDING INFORMATION TO IMPROVE AND CONTROL THE PROCESS. DESIRABLE ASPECTS OF P ...

    SBIR Phase II 1993 Department of Commerce
  4. TURBINE ENGINE ROTOR SYSTEM FAILURE PREDICTION AND PREVENTION

    SBC: Systems Control Technology,            Topic: N/A

    THE OBJECTIVE OF THIS RESEARCH IS TO DEVELOP A METHODOLOGY AND A PROTOTYPE DESIGN FOR A SYSTEM CAPABLE OF PREDICTING FAILURE OF ROTATING PARTS IN TURBINE ENGINES. SCT PROPOSES AN INNOVATIVE, INTEGRATED APPROACH THAT ASSIMILATES DATA FROM MULTIPLE SOURCES TO TREND ENGINE PERFORMANCE AND HEALTH. INDICATIONS OF COMPONENET FAILURE WILL BE IDENTIFIED AND ACTUAL DATA WILL BE COMPARED AGAINST THE INDICAT ...

    SBIR Phase II 1993 Department of Transportation
  5. AUTOMATED TERCOM PLACEMENT AND EVALUATION

    SBC: Systems Control Technology,            Topic: N/A

    DETERMINING SITES TO BUILD NEW TERCOM MAPS HAVE PROVEN TO BE A VERY COMPLICATED AND TIME CONSUMING TASK, AS EVIDENCED IN BOTH SIOP CRUISE MISSILE PLANNING AND OPERATION DESERT STORM. THE CRUISE MISSILE PLANNER, WITH SOME DIFFICULTY, CAN DETERMINE NEEDED CANDIDATE TERCOM SITES, BUT ALL TOO OFTEN, BECAUSE OF INSUFFICIENT TERRAIN ROUGHNESS, THE DEFENSE MAPPING AGENCY (DMA) IS UNABLE TO CREATE A TERCO ...

    SBIR Phase II 1993 Department of DefenseDefense Threat Reduction Agency
  6. A LOW-COST OPTICAL WEATHER IDENTIFIER FOR AN AUTOMATED WEATHER OBSERVING SYSTEM

    SBC: DYNAMICS TECHNOLOGY, INC.            Topic: N/A

    THE IDENTIFICATION OF THE TYPE OF PRECIPITATION (RAIN, SNOW, FOG/HAZE, HAIL) HAS TRACTIONALLY RELIED ON HUMAN JUDGMENT. RECENTLY, THE WAVE PROPAGATION LABORATORY OF DEVELOPED A TECHNOLOGY FOR AUTOMATIC WEATHER IDENTIFICATION USING LASER SCINTILLATION AND SCATTERING. THE TECHNIQUE HAS BEEN SUCCESSFULLY TESTED IN FIELD OPERATION. HOWEVER, THE SYSTEM IS TOO CLUMSY AND EXPENSIVE FOR LARGE-SCALE FIELD ...

    SBIR Phase II 1985 Department of Transportation
  7. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
US Flag An Official Website of the United States Government