You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADVANCED AREA DETECTOR FOR REAL-TIME RADIOGRAPHY OF AEROPROPULSION MATERIALS ADVANCED AREA DETECTOR FOR REAL-TIME RADIOGRAPHY OF AEROPROPULSION MATERIALS

    SBC: Aracor            Topic: N/A

    THE OBJECTIVES OF THE PHASE I EFFORT ARE TO QUANTIFY THE EFFECT OF X-RAY SCATTER ON RADIOGRAPHIC IMAGE QUALITY, TEST SCATTER REJECTION APPROACHES, AND GENERATE A CONCEPTUAL DESIGN OF A SYSTEM WHICH WILL PROVIDE BETTER RESOLUTION, CONTRAST SENSITIVITY, AND DYNAMIC RANGE THAN IS CURRENTLY AVAILABLE WITH COMMERCIAL REAL-TIME RADIOGRAPHY SYSTEMS. PRESENTLY, REAL-TIME RADIOGRAPHY SYSTEMS DO NOT REJECT ...

    SBIR Phase II 1993 National Aeronautics and Space Administration
  2. A PARALLEL COMPUTING ENVIRONMENT FOR PROBABAILISTIC RESPONSEANALYSIS OF HIGH TEMPERATURE COMPOSITES

    SBC: ALPHASTAR TECHNOLOGY SOLUTIONS LLC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  3. HIGH-RESOLUTION AUTOMATED METHOD FOR LOCATING, IDENTIFYING, AND MEASURING SURFACE

    SBC: Apd Cryogenics Inc.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  4. INNOVATIVE MAGNETIC SUSPENSION BEARING TECHNOLOGY FOR SPACE SHUTTLE MAIN ENGINE TURBOPUMPS INNOVATIVE MAGNETIC SUSPENSION BEARING TECHNOLOGY FOR SPACE SHUTTLE MAIN ENGINE TURBOPUMPS

    SBC: Avcon, Inc.            Topic: N/A

    THE RELIABILITY AND PERFORMANCE OF SPACE SHUTTLE MAIN ENGINES (SSME) ARE CRITICAL TO MISSION LAUNCH, SUCCESS, AND SAFETY. CURRENTLY, SSME RELIABILITY AND PERFORMANCE ARE LIMITED BY TURBOPUMP BEARING FAILURE, BOTH IN THE HIGH PRESSURE LIQUID OXYGEN AND HIGH PRESSURE FUEL TURBOPUMPS (HPOTP AND HPFTP). CURRENT BEARING LIMITATIONS ARE RELATED TO HIGH STRESSES AND WEAR AS WELL AS TO HARSH (TEMPERATURE ...

    SBIR Phase II 1993 National Aeronautics and Space Administration
  5. OPTIMUM PHASE DEMODULATION AND ADAPTIVE CHANNEL EQUALIZATIONWITH HOPFIELD NEURAL NETWORKS

    SBC: CHIRP CORP.            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  6. LARGE AREA HIGH TEMPERATURE SUPERCONDUCTING THIN FILMS

    SBC: CONDUCTUS, INC.            Topic: N/A

    THE HIGH-TEMPERATURE SUPERCONDUCTING FILMS NOW DEPOSITED IN SITU ARE LARGE ENOUGH FOR RESEARCH PURPOSES AND FOR PRODUCTION OF A LIMITED NUMBER OF DEVICES. BUT MOST PRACTICAL DEVICES AND CIRCUITS WILL REQUIRE HIGH-QUALITY FILMS ON LARGE SUBSTRATES. THIS PROJECT WILL DEVELOP A PROCESS FOR DEPOSITING HIGH-QUALITY FILMS OF YBA2CU3O7-D, WITH UNIFORM THICKNESS AND UNIFORM ELECTRICAL PROPERTIES, IN TECHN ...

    SBIR Phase II 1993 National Aeronautics and Space Administration
  7. A NON-VOLATILE SOLID STATE RECORDER FOR SPACECRAFT

    SBC: SEAKR ENGINEERING, LLC            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
  8. BROAD TUNING RANGE STABILIZED DIODE LASER SYSTEM

    SBC: Deacon Research            Topic: N/A

    THERE IS A MARKET NEED FOR STABILIZED, TUNABLE DIODES, PROVIDED THE PRINCIPAL ADVANTAGES OF THE LASER DIODE, I.E., LOW COST, COMPACTNESS, AND HIGH RELIABILITY, ARE MAINTAINED. RECENT ADVANCES IN SEMICONDUCTOR MANUFACTURING TECHNOLOGY HAVE LED TO AN EXPLOSION IN LASER DIODE AVAILABILITY ACROSS A WIDE WAVELENGTH RANGE. THIS SITUATION HAS CREATED A MARKET OPPORTUNITY FOR A PLUG-REPLACEABLE STABILIZED ...

    SBIR Phase II 1993 National Aeronautics and Space Administration
  9. ADVANCED FARE PAYMENT MEDIA

    SBC: Echelon Industries Inc.            Topic: N/A

    THE FEASIBILITY OF SMART CARDS FOR THE PUBLIC TRANSIT INDUSTRY HAS NOT BEEN ESTABLISHED. THERE IS A PERCEPTION THAT SMART CARDS CAN BE USED TO REDUCE THE TOTAL TRANSACTIONCOSTS ASSOCIATED WITH FARE PAYMENT, TO IMPROVE SECURITY, REDUCE FRAUD AND IMPROVE SYSTEM PERFORMANCE AND RIDERSHIP. THE OBJECTIVE OF THIS PROGRAM IS TO DETERMINE THE APPROPRIATENESS OF THESE CLAIMS; THIS WILL BE ACCOMPLISHED BY R ...

    SBIR Phase II 1993 Department of Transportation
  10. PARALLEL IMPLEMENTATION OF IMAGE CORRESPONDENCE ALGORITHMS FOR ROTORCRAFT

    SBC: Innovative Configuration Inc            Topic: N/A

    N/A

    SBIR Phase II 1993 National Aeronautics and Space Administration
US Flag An Official Website of the United States Government