You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Lethality Enhancement by Hi-Therm Reactive Materials

    SBC: GENERAL SCIENCES INC            Topic: N/A

    "The Phase I effort produced very important and encouraging results in terms of interceptor lethality enhancement. This was achieved by the innovative development and testing of high density reactive composites which as projectiles or impacting structurescan deliver large amounts of chemical energy to the target in addition to kinetic, in a non-parasitic manner. This effort proved that (a) these ...

    SBIR Phase II 2002 Department of DefenseMissile Defense Agency
  2. Evaluation of Composite Joints in General Aviation Structures

    SBC: MATERIALS SCIENCES LLC            Topic: N/A

    During the Phase I program, MSC demonstrated a powerful new software tool designed for the analysis of bonded joints in General Aviation (GA) aircraft. The tool can handle the complex geometry and boundary conditions found in typical joints, and has been shown to be exceptionally accurate. An easy-to-use front end to the code was also demonstrated. In addition, Materials Sciences Corporation (M ...

    SBIR Phase II 2002 Department of Transportation
  3. GaP ZnS for Blue Light Emitting Diodes

    SBC: ASTROPOWER, INC.            Topic: N/A

    AstroPower is developing a two-junction monolithic tandem solar cell composed of (AlxGa1-x)0.51In.49P lattice matched to GaAs for use as the top cell in a three-junction, two-terminal tandem stack. This tunable bandgap material system is capable of current matching, at 2.03eV, in a two-junction monolithic tandem solar cell two terminal design of (AlxGa1-x)0.51In0.49P/GaAs yielding a best case pred ...

    SBIR Phase II 1993 Department of DefenseMissile Defense Agency
  4. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    A SIX MONTH PROGRAM TO DEVELOP A RUGGED NEW DEVICE FOR MONITORING THE ONSET OF ICE FORMATION ON SURFACES OF TRANSPORTATION VEHICLES, ROADS, BRIDGES AND AIRCRAFTS, WILL BE DEVELOPED AND A PROTOTYPE WILL BE LABORATORY TESTED. THE NOVEL GAGE AND ELECTRONIC SYSTEM IS PARTLY BASED ON THE TECHNOLOGY APPLIED TO MEASURE CONDUCTIVITY OF SOLUTIONS. BASED ON EXISTING TECHNOLOGY, AND ALREADY TESTED UNDER HIGH ...

    SBIR Phase II 1985 Department of Transportation
US Flag An Official Website of the United States Government