You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY20 is not expected to be complete until September, 2021.
-
Software Package for Material Model Evaluation
SBC: APTEK, Inc. Topic: N/AThis Phase I and II SBIR will develop a user-friendly, run-time efficient software package dedicated to fitting and evaluating material models used in finite element codes like LS-DYNA. The software package will consist of a pre-processor, a core driver, and a post-processor. The pre-processor will allow the user to specify the material model, model parameters, and desired load history. The dri ...
SBIR Phase II 2004 Department of Transportation -
Portland Cement Concrete Pavement Recycling
SBC: Road Processing Resources Inc. Topic: N/ARPR's Phase I contract proved the feasibility of concrete recycling based o a shock-producing hammer/anvil concept for fracturing and sizing aggregate and separating reinforcing steel into marketable scrap. The Phase II project will develop a portable self-propelled prototype to remove and process a 12 foot wide roadway at a rate of about a mile a day. This is called "Fast Track" highway removal ...
SBIR Phase II 2004 Department of Transportation -
Low Cost Transverse Rail Defect Detector
SBC: WavesinSolids LLC Topic: N/ADevelopment of the basic EMAT-based transverse rail defect detector has progressed toward finished form, as envisioned in the original solicitation. This modification is intended to produce a demonstrable version of a 2-rail detection system with automated signal interpertation.
SBIR Phase II 2004 Department of Transportation