You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. New NOAA-Derived Data Products for the TV Broadcast Market

    SBC: Worldwinds, Inc.            Topic: 832D

    This Phase II SBIR will execute the research to commercialization process developed in Phase I, when WorldWinds, Inc. developed and implemented a procedure to showcase graphical NOAA products for on-air consumption by the general public. Through collaboration with Baron Services, Inc., of Huntsville, AL, the Phase I project developed a prototypical composite Blended Total Precipitable Water produ ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  2. Cost Competitive Wave Energy Without Moving Parts

    SBC: OSCILLA POWER INC            Topic: 815

    Oscilla Power, Inc. (OPI) is developing a utility-scale wave energy harvester that is enabled by low cost and readily-available magnetostrictive alloys. T his device, which utilizes no moving parts, has the potential to deliver predictable quantities of electric power to coastal utilities, industrial users, and remote facilities at costs competitive with coal or gas. The Phase I project demonstra ...

    SBIR Phase II 2011 Department of CommerceNational Oceanic and Atmospheric Administration
  3. Low Cost Large Scale PEM Electrolysis for Renewable Energy Storage

    SBC: Proton Energy Systems, Inc.            Topic: 01a

    Solar and wind energy are the most likely candidates to meet our future energy needs based on the available capacity. The problem is that these renewable sources are not consistently accessible, and thus storage must be an integral part of the energy solution. Hydrogen generation via proton exchange membrane (PEM) water electrolysis is one attractive solution, but the life cycle cost of the elec ...

    SBIR Phase II 2011 Department of Energy
  4. Improved Hydrogen Purification

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 10c

    Industrial hydrogen production relies primarily on natural gas and hydrocarbon feedstocks to drive the various reaction chemistries that lead to hydrogen generation. Carbon dioxide, the ultimate co-product when such feedstocks and processes are employed, necessarily becomes a major contaminant of the generated hydrogen. Thus, carbon dioxide isolation and removal is an important process step in th ...

    SBIR Phase II 2011 Department of Energy
  5. Novel Membranes for Olefin/Paraffin Separation

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 10d

    Ethylene and propylene are major chemical industry raw materials and consume a great deal of energy related to their production. It is estimated that 230 trillion BTU/yr are consumed in olefin/paraffin separations. Significant energy consumption is employed when cryogenically separating ethane from ethylene and propane from propylene. These cryogenic separations are difficult and are both capital ...

    SBIR Phase II 2011 Department of Energy
  6. High-Gradient Two-Beam Electron Accelerator

    SBC: Omega-P, Inc.            Topic: 65a

    In a two-beam accelerator, a high-current drive beam imparts energy to a low current test beam by generating microwave power that flows from one beam to the other. The largest project of this sort is CLIC, located at CERN in Geneva, Switzerland, that is being designed for operation at an electron-positron center-ofmass energy as high as 3 TeV. Technical complexity and low efficiency characterize t ...

    SBIR Phase II 2011 Department of Energy
  7. High Current Cold Cathode Employing Diamond and Related Materials

    SBC: Omega-P, Inc.            Topic: 64e

    Thermionic cathodes are in use in an overwhelming majority of vacuum electronics devices, including high-power RF sources used to drive particle accelerators. These cathodes do not operate reliably or have long lifetime if their current density exceeds 5-10 Amperes/cm2. Artificial diamond and related materials, produced by chemical vapor deposition, appear to be an attractive alternative, which co ...

    SBIR Phase II 2011 Department of Energy
  8. A Technology to Mitigate Syngas Cooler Fouling

    SBC: REACTION ENGINEERING INTERNATIONAL            Topic: 25c

    Coal gasification plants have exhibited sub-par performance and plant economics due to poor reliability and availability. A major contributor to the poor performance has been fouling of the syngas cooler located downstream of the gasifier. The fouling is due to vaporized ash from the coal gasification process depositing on the fireside surface of the tubes in the fire tube heat exchanger used for ...

    SBIR Phase II 2011 Department of Energy
  9. Thermochemically Integrated Solid State Hydrogen Separator and Compressor

    SBC: FuelCell Energy, Inc.            Topic: 12d

    With the depletion of fossil fuel reserves, hydrogen-based energy is becoming increasingly significant. Production, purification and compression of hydrogen represent key technical challenges. Hydrogen is most commonly produced from steam methane reformers, by gasification or as a refining or chemical system off-gas. All of these production systems require purification and compression steps and ...

    SBIR Phase II 2011 Department of Energy
  10. Dewatering Membrane for Hazy Hydrodesulfurization Unit Effluents

    SBC: COMPACT MEMBRANE SYSTEMS, INC.            Topic: 09

    Many refinery product streams, particularly those from Ultra Low Hydrodesulfurisation units, are prone to haze due to water emulsions. Haze is also problematic for biodiesel production, as hazy fuel cannot be used until the haze settles or is removed, which creates costly scheduling and shipping delays. This project will develop a novel membrane process for the removal of dissolved and dispersed ...

    SBIR Phase II 2008 Department of Energy