Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY19 is not expected to be complete until June, 2020.

  1. Low Voltage Power Sources for Long-Life Electronics

    SBC: TalosTech LLC            Topic: SB163009

    There is a critical need for DoD to develop power sources that will increase the mission lifetime for unattended sensors and sensor radio networks. In order to take advantage of recent advances in extremely low power subthreshold circuits to greatly exte...

    SBIR Phase I 2017 Department of DefenseDefense Advanced Research Projects Agency
  2. Chemical Nano-Imprint Lithography

    SBC: EM PHOTONICS INC            Topic: SB041030

    The overall objective of this Phase II project is to optimize the fabrication procedure associated with the chemical lithography proposed in Phase I to fabricate nanophotonic structures and devices at a fraction of the cost of existing technologies. We plan to use our optimized chemical lithography procedure to fabricate an ultra-high resolution patterns and devices including nano-probe for near f ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  3. Hardware Assisted Electronic Circuit Simulation System

    SBC: EM PHOTONICS INC            Topic: SB041029

    In Phase I, EM Photonics demonstrated the viability of using a reconfigurable hardware approach to accelerating the simulation of electronic circuits based on their electromagnetic properties. In Phase II, this technology will be used to create a solver capable of analyzing mixed signal circuits 64 times faster than is currently available from equivalent software. The resulting device will shrin ...

    SBIR Phase II 2005 Department of DefenseDefense Advanced Research Projects Agency
  4. NEW TRANSIT MARKETS FOR COMPETITIVE PROCUREMENT

    SBC: Dean P Bell & Assoc Inc            Topic: N/A

    THE DEVELOPMENT OF AN UNPRECEDENTED PUBLIC SECTOR/PRIVATE SECTOR BUSINESS PARTNERSHIP AMONG PRIVATE BUS OPERATORS, VISITOR AND CONVENTION BUREAUS (C&VB) AND PUBLIC TRANSIT AGENCIES TO MEET THE GROWING TRANSPORTATION NEEDS OF THE MEETING MARKET (E.G., CONVENTIONS AND CORPORATE MEETINGS). THIS WILL DETERMINE THE FEASIBILITY OF ESTABLISHING A FIXED-ROUTE SHUTTLE SERVICE BETWEEN HOTELS AND CONVENTION ...

    SBIR Phase I 1987 Department of Transportation
  5. ICING MONITORING EQUIPMENT

    SBC: JONAS, INC.            Topic: N/A

    N/A

    SBIR Phase I 1984 Department of Transportation
  6. MONOLITHIC GAAS LIGHT-EMITTING DIODES ON SILICON VLSI CIRCUITS ELEMENTS

    SBC: ASTROPOWER, INC.            Topic: N/A

    OPTOELECTRONIC SOURCES, INTEGRATED AS MONOLITHIC ELEMENTS ON SILICON VLSI CHIPS, OFFER IMPORTANT ADVANTAGES IN THE TRANSMISSION OF INFORMATION WITHIN THE CHIP OR BETWEEN CHIPS IN ADVANCED COMPUTER SYSTEMS. THE SPEED OF OPTICAL-INTEGRATED VLSI DEVICES IS EXPECTED TO BE CONSIDERABLY HIGHER THAN EQUIVALENT VLSI WITH METALLIC INTERCONNECTS, DUE TO ABSENCE OF THE RC DELAY INHERENT IN THE METALLIC CONDU ...

    SBIR Phase II 1987 Department of DefenseDefense Advanced Research Projects Agency
  7. REDUNDANT STANDOFF DETECTION CAPABILITY FOR EXPLOSIVE FILLED ORDNANCE BASED ON OPTIMAL SELECTION OF ADVANCED TECHNOLOGIES

    SBC: Technology International Incorporated of Virginia            Topic: N/A

    A CRITICAL TECHNOLOGY ASSESSMENT EFFORT IS PLANNED TO EXPLORE THE VIABILITY OF APPLYING ADVANCED NON-DESTRUCTIVE TESTING METHODS IN DETECTION OF EXPLOSIVES. THE ASSESSMENT WILL BE FOLLOWED BY SCREENING TECHNOLOGIES WHICH ARE IMPRACTICAL; DOES NOT MEET THE REQUIREMENTS. OUT OF THE SCREENED TECHNOLOGIES OPTIMAL ALTERNATIVE STRATEGIES WILL BE DEFINED TO DEVELOP A CONCEPT FOR THE RSDC. THE FORMULATED ...

    SBIR Phase I 1987 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government