You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
INFLATABLE STRUCTURES FOR ENHANCED SIDE IMPACT CRASH PROTECTION
SBC: Collison Safety Engineer Inc Topic: N/ATHIS PROPOSAL DESCRIBES A SIX-MONTH PROGRAM FOR THE INVESTIGATION INTO THE TECHNICAL FEASIBILITY OF A DEPLOYABLE, DOOR-MOUNTED PAD FOR ENHANCING THE PROTECTION LEVEL AFFORDED FRONT SEAT OCCUPANTS BY VEHICLES STRUCK IN THE SIDE DOOR AREA. THE CONCEPT PROPOSED FOR INVESTIGATION IS AN INFLATABLE STRUCTURE INTEGRATED INTO A PRODUCTION-CONFIGURED SMALL CAR DOOR. UPON IMPACT OF THE DOOR A STORED GAS OR ...
SBIR Phase I 1987 Department of Transportation -
ELIMINATION OF TURBULENCE-INDUCED STRUCTURAL FAILURE AND CONTROL LOSS IN VERY LIGHT AIRCRAFT
SBC: Daedalus Research Inc. Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation -
NEW TRANSIT MARKETS FOR COMPETITIVE PROCUREMENT
SBC: Dean P Bell & Assoc Inc Topic: N/ATHE DEVELOPMENT OF AN UNPRECEDENTED PUBLIC SECTOR/PRIVATE SECTOR BUSINESS PARTNERSHIP AMONG PRIVATE BUS OPERATORS, VISITOR AND CONVENTION BUREAUS (C&VB) AND PUBLIC TRANSIT AGENCIES TO MEET THE GROWING TRANSPORTATION NEEDS OF THE MEETING MARKET (E.G., CONVENTIONS AND CORPORATE MEETINGS). THIS WILL DETERMINE THE FEASIBILITY OF ESTABLISHING A FIXED-ROUTE SHUTTLE SERVICE BETWEEN HOTELS AND CONVENTION ...
SBIR Phase I 1987 Department of Transportation -
ICING MONITORING EQUIPMENT
SBC: JONAS, INC. Topic: N/AN/A
SBIR Phase I 1984 Department of Transportation