You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Cooling/Thermal Management System Development for Active Denial Technology (ADT) and High-Power Radio-Frequency vehicle Stopper (RF) Systems
SBC: International Mezzo Technologies, Inc. Topic: N102110The heat exchanger in the Nacelle of the V-22 Osprey cools gearbox oils and hydraulic oil. In operation, the current heat exchanger becomes clogged with sand and dust and the engine overheats. Also, the current unit is very difficult to clean. A micro tube heat exchanger with large air passages offers the potential to alleviate this problem. In this program, Mezzo will design and manufacture, and ...
SBIR Phase II 2018 Department of DefenseNavy -
Reduced Cavitation, High Efficiency Outboard Propulsors for Small Planing Craft
SBC: CANDENT TECHNOLOGIES INCORPORATED Topic: N17AT019The Candent Technologies “Reduced Cavitation, High Efficiency Outboard Propulsor for Small Planing Craft” Phase II program is structured to develop an advanced waterjet propulsor for the Combat Rubber Raiding Craft (CRRC). This new axial flow waterjet propulsion system is designed as a “bolt on” assembly that replaces the lower unit of the existing MFE 55 outboard motor. This new propulsio ...
STTR Phase II 2018 Department of DefenseNavy -
Develop integrated analog photonic modulator components compatible with photonic foundry production
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: AF171126In phase II work, we will collaborate with Prof. Dennis W. Prather in UD and continue to develop broadband, low VÏ€, high linearity, thin-film lithium niobate on insulator (LNOI) modulators that are fully compatible with silicon photonic integrated circuits (PIC) foundry processes. We will demonstrate a low VÏ€, broadband, small footprint LNOI modulator with hybrid Si/LN or SiN/LN waveguide ...
SBIR Phase II 2018 Department of DefenseAir Force -
Wafer-Level Electronic-Photonic Co-Packaging
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: AF16AT01In phase II work, we will collaborate with Prof. Stefan Preble in RIT and continue to develop large scale hybrid integration and packaging techniques for key active photonic components such as lithium niobate on insulator (LNOI) modulators and modified uni-traveling (MUTC) photodiodes. We will demonstrate a low V, broadband, small footprint LNOI modulator with hybrid Si/LN or SiN/LN waveguide usin ...
STTR Phase II 2018 Department of DefenseAir Force -
Dynamic and Efficient Vapor Compressor
SBC: BASCOM HUNTER TECHNOLOGIES INC Topic: AF171057This Air Force SBIR project will develop and demonstrate a refrigerant vapor compressor that can provide up to 150 kW nominal cooling capacity.The developed compressor will be dynamically responsive to the needs of the vapor cycle system and can sustain high efficiency while providing cooling over the entire range of operating conditions for next generation aircraft.
SBIR Phase II 2018 Department of DefenseAir Force -
Dynamic and Efficient Vapor Compressor for Aircraft Thermal Management Systems (TMSs)
SBC: S-Ram Dynamics, LLC Topic: AF171057S-RAM Dynamics (S-RAM) will design, fabricate, test, and commercialize a high-performance axial piston transcritical CO2 energy recovery compressor (ERC) to support next-generation aircraft thermal management systems for the U.S. Air Force and commercial applications
SBIR Phase II 2018 Department of DefenseAir Force -
Generator Power Recapture
SBC: PC KRAUSE & ASSOCIATES INC Topic: AF161008The Air Force rebuilds and tests many aircraft and ground-power generators each year, involving many hours of loaded run-time with dissipative load banks. To improve facility energy efficiency and to have a positive environmental impact, a regenerative ac/dc load bank is proposed to push power from generator testing back to the electric grid. The proposed generator power recapture unit (GPRU) will ...
SBIR Phase II 2018 Department of DefenseAir Force -
Development of a Modular, Open-Architecture, Integrated, and Validated Mobility Prediction Capability
SBC: Advanced Science And Automation Corp Topic: A18105The objective of this project is to develop a modular, open-architecture, physics-based ground vehicle mobility prediction software tool for world-wide terrains that are encountered in military applications including on-road and off-road soft soil terrains. The tool will integrate three modules: (1) Physics-Based Vehicle-Terrain Modeling tool; (2) Geographic Information System (GIS); and (3) Stoch ...
SBIR Phase I 2018 Department of DefenseArmy -
Advanced Durability Systems for Unmanned Aerial Vehicle Propulsion
SBC: IBC Materials & Technologies, LLC Topic: SOCOM163002Group 2-3 UAS engines have low mean time between overhauls (MTBOs), often with as little as 200-400 hours before maintenance must be conducted.This leads to significant maintenance cost and logistics tail for deployed operations.Two-stroke piston and rotary engines for Group 2-3 platforms have common maintenance drivers such as carbon fouling, and wear of cylinders, housings and bearings.Phase I r ...
SBIR Phase II 2018 Department of DefenseSpecial Operations Command -
Multicore Fiber Optic Package Optical Subassembly for Wideband Digital and Analog Photonic Links
SBC: PHASE SENSITIVE INNOVATIONS INC Topic: N182101In this SBIR effort we will develop a balanced detection analog photonic link consisting of a DFB laser, a dual-output high-speed, low-Vp mach-zehnder modulator (MZM) and a high-power, high-linearity balanced photodetector (BPD) using a dual-core, single mode, multicore fiber (MCF) that is supplied by our subcontractor, OFS. We will design, fabricate and characterize (phase I) the MZM and the BPD, ...
SBIR Phase I 2018 Department of DefenseNavy