You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Environmental Protection: Power Line Bird-Diverter Installation with Novel Touch-Capable Drone

    SBC: PITCH AERONAUTICS INC.            Topic: 84

    Our water air soil farms and forests depend on birds as vital natural resources. Birds consumeinsects pollinate plants disperse seeds and maintain wetlands. Unfortunately transmission linecollisions kill 57 million birds annually in the United States. Installing markers that help birdssee and not hit power lines can decrease bird collisions by more than 70%. Today powerlinemen use bucket trucks an ...

    SBIR Phase I 2023 Department of Agriculture
  2. Autonomous harvester for cilantro with bunching and tying capability

    SBC: PADMA AGROBOTICS LLC            Topic: 813

    This project aims to develop an automated robotic harvester for cilantro and other specialty cropsthat are harvested in bunches. Currently this is a labor-intensive task that takes up to 50% of totalcosts. Automating this task would mean reducing OPEX for farms by 40%-50% and moreimportantly tackling the huge labor shortage currently affecting the agricultural sector. This willpermit to grow produ ...

    SBIR Phase I 2023 Department of Agriculture
  3. HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payload attachment

    SBC: HYDRONALIX INC            Topic: 86

    HERMES: Humanitarian Emergency Response Messenger of Essential Supplies drone payloadattachmentPI: Anthony C. MulliganSmall business: Hydronalix Green Valley AZMore than 95% of U.S. land area is classified as rural but home to just 19% of the population.Rural communities face geographic and demographic obstacles in responding to and preparing forextreme events such as hurricanes tornadoes and floo ...

    SBIR Phase I 2023 Department of Agriculture
  4. Designer Biochar- low-cost adsorbents for nitrate and phosphate nutrients to prevent eutrophication of watercourses and to provided nutrients in soil augmentation

    SBC: GLANRIS WATER SYSTEMS INC            Topic: 88

    Project Summary/AbstractFunding Opportunity Number: USDA-NIFA-SBIR-009301Topic Area 8.8: Biofuels and Biobased ProductsTitle of Project: Designer Biochar - Low-cost adsorbents and fertilizers for nitrate and phosphateadsorption and nutrient deliveryPD/PI: Brigano Frank A. Glanris Inc.Co PD/PI: Mlsna Todd E. Mississippi State UniversityCo PD/PI: Pittman Charles Mississippi State UniversityGlanris I ...

    STTR Phase I 2023 Department of Agriculture
  5. HotSwap System for ISAM Friendly Spacecraft

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    In-orbit servicing, assembly, and manufacturing (ISAM) technologies are taking the space industry by storm and will undoubtedly shape the future industry. These ISAM services generally focus around providing mobility for different spacecraft improving lif

    SBIR Phase II 2023 Department of DefenseAir Force
  6. ThermaSat Plus OTV

    SBC: THERMASAT, INC.            Topic: AFX234DCSO1

    The space domain is changing with in-orbit servicing, assembly, and maintenance (ISAM) technologies quickly dominating new spacecraft designs and developments. A future space economy undoubtedly will be based around ISAM services for satellites. As these

    SBIR Phase II 2023 Department of DefenseAir Force
  7. US-Based High-Speed I/O for Space-Based Defense Applications

    SBC: ALPHACORE INC            Topic: AFX234DCSO2

    The US Space Force (SF) wishes to advance existing dual-purpose interface technology for its modernization priorities in broadly identified segments. A rad-hard SerDes is a “must” technology to have in any electronic system, or a set of systems, in which

    SBIR Phase II 2023 Department of DefenseAir Force
  8. A Disruptive Pulse Power Capacitor Technology for Use in Direct Energy Weapons

    SBC: POLYCHARGE AMERICA, INC            Topic: X224OCSO1

    Direct Energy weapons in the form of High Energy Lasers (HEL) and High-Power Microwaves (HPM) for use in air and space-based platforms, continue to be technologically challenged, mostly due to equipment size, which translates into a need for higher energy and power density components.  High voltage pulse capacitors are a key and often a critical component of different pulse power systems.  The P ...

    SBIR Phase I 2023 Department of DefenseAir Force
  9. Additive Manufacturing of Structural Insulators

    SBC: ADVANCED CERAMICS MANUFACTURING, LLC            Topic: MDA22T012

    There is a need for a lightweight, high-performance, insulation to protect the internal systems in hypersonic vehicles. A passive thermal protection system (TPS) design would be simple and reliable. As designs evolve, there is a need for TPS insulation materials that can be additively manufactured. Our Phase I approach will additively manufacture pre-ceramic scaffolds that are used to create low d ...

    STTR Phase I 2023 Department of DefenseMissile Defense Agency
  10. Compact Hybrid Powerplant for Deployable UAS

    SBC: DRAGOON TECHNOLOGY LLC            Topic: X224OCSO1

    Dragoon Technology proposes to develop a power-dense hybrid powerplant meeting the requirements of small deployable Unmanned Aerial Systems (UAS), providing greater endurance and range than that provided by battery power. Dragoon’s existing hybrid powertrain meets the needs of small, long endurance UAS, and will be adapted to the higher power and more compact form factor requirements of deployed ...

    SBIR Phase I 2023 Department of DefenseAir Force
US Flag An Official Website of the United States Government