You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADAPTIVE GRID TECHNIQUES FOR USE IN COMPUTATIONAL FLUID DYNAMICS

    SBC: Computational Mechan            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  2. AIR-FREE KEVLAR/URETHANE COMPOSITES

    SBC: TEXAS RESEARCH INSTITUTE , AUSTIN, INC.            Topic: N/A

    THE GOAL OF THIS PROGRAM IS THE DEVELOPMENT OF ONE OR MORE METHODS (APPLICABLE TO MANUFACTURING) WHICH ALLOW THE COMPLETE SATURATION OF LARGE (140 MIL DIAMETER) KEVLAR CORD WITH A POLYURETHANE RESIN. TASKS WILL INCLUDE THE SELECTION OF MATERIALS AND PROCESSING (ALREADY COMPLETED), A REVIEW OF ALTERNATE, MORE ADVANCED RESIN SYSTEMS, INVESTIGATION OF NDE METHODS TO MONITOR SUCCESS, LABORATORY IMPREG ...

    SBIR Phase II 1986 Department of DefenseNavy
  3. ANALYSIS OF HANE 0-10 SECOND MHD EMP

    SBC: AUSTIN RESEARCH ASSOCIATES            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseDefense Threat Reduction Agency
  4. ANALYSIS OF PSYCHOPHYSIOLOGICAL MEASUREMENTS TO SUPPORT BIOFEEDBACK CONTROL MECHANISMS

    SBC: Transform Index Technologies            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  5. A RESEARCH PROGRAM IS PROPOSED TO ESTABLISH THE FEASIBILITY OF COMBINING THE COMPREHENSIVE RULE-BASE OF AN EXPERT ARC WELDING SYSTEM WITH SENSORY FEEDBACK AND CONTROL ALGORITHMS TO INITIALLY SET AND ADAPTIVELY CONTROL THE WELD PROCESS IN A CHANGING

    SBC: Crc-evans Pipeline Internation            Topic: N/A

    A RESEARCH PROGRAM IS PROPOSED TO ESTABLISH THE FEASIBILITY OF COMBINING THE COMPREHENSIVE RULE-BASE OF AN EXPERT ARC WELDING SYSTEM WITH SENSORY FEEDBACK AND CONTROL ALGORITHMS TO INITIALLY SET AND ADAPTIVELY CONTROL THE WELD PROCESS IN A CHANGING ENVIRONMENT. IT WILL BE THE OBJECTIVE OF THE PROPOSED RESEARCH TO DEMONSTRATE THE FEASIBILITY OF ACCOMPLISHING THIS FOR BOTH CONVENTIONAL JOINTS AND NA ...

    SBIR Phase I 1986 Department of DefenseNavy
  6. CORRELATED RADARS

    SBC: AMERICAN XTAL TECHNOLOGY            Topic: N/A

    THE OBJECTIVE IS TO CREATE A RADAR JAMMING COMPUTER MODEL WHICH EASILY PERMITS ARMY PERSONNEL TO CALCULATE THE JAMMING PARAMETERS WHICH COUNTER BOTH RANGE DELAY AND DOPPLER RADARS. THIS SOFTWARE MUST BE WRITTEN IN BASIC, RUN ON AN MS-DOS COMPUTER AND THE SOURCE CODE SHOULD BE INCLUDED WITH UNLIMITED RIGHTS TO THE GOVERNMENT. KEY OBJECTIVES IN CREATING THIS SOFTWARE ARE AS FOLLOWS: 1) REVIEW EXISTI ...

    SBIR Phase I 1986 Department of DefenseArmy
  7. DEVELOPMENT OF AN IMPROVED NECK FOR EJECTION SYSTEM TESTING MANIKINS

    SBC: Simula, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseAir Force
  8. DIRECT GROWTH/FUSION CIRCUITRY DEVICES ON OPTICAL FIBER

    SBC: Advanced Fiberoptics Corp.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseArmy
  9. DOME FRESNEL LENS/GALLIUM ARSENIDE PHOTOVOLTAIC CONCENTRATOR ARRAY WITH AN AMO OPERATIONAL ARRAY EFFICIENCY GREATER THAN 20%

    SBC: ENTECH, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1986 Department of DefenseMissile Defense Agency
  10. DOPPLER CHAFF

    SBC: Pinson Associates Inc.            Topic: N/A

    THIS PROPOSED PROGRAM IS TO INVESTIGATE THE FEASIBILITY OF GENERATING DOPPLER FREQUENCIES FROM A CHAFF CLOUD BY USING NON-LINEAR DIPOLES AND ILLUMINATING THE CLOUD WITH A MODULATED CW SIGNAL. FEASIBILITY WILL BE ESTABLISHED BY A DETAILED ANALYSIS OF THE POWER AND FREQUENCY REQUIREMENTS AND AN INVESTIGATION OF THE MATERIALS REQUIRED TO MAKE THE NON-LINEAR DIPOLES WITH CONSIDERATION GIVEN TO COST AN ...

    SBIR Phase II 1986 Department of DefenseArmy
US Flag An Official Website of the United States Government