You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Integrated Automated Pre-concentrator Inlet for Mass Spectrometer
SBC: 1st Detect Corp Topic: CBD09106This proposal describes a project to develop a pre-concentrator inlet system for a mass spectrometer. The pre-concentrator utilizes a heated mesh design that is coated with a variety of sorbent materials to provide high pre-concentration with adversely affecting the analysis time. An innovative method of evacuating the pre-concentrator chamber provides an additional gain in pre-concentration of 2 ...
SBIR Phase II 2010 Department of DefenseOffice for Chemical and Biological Defense -
INTERACTIVE EXPERT EDITING SYSTEM
SBC: Synercom Technology Inc. Topic: N/ATHE DEVELOPMENT OF AN EXPERT SYSTEM FOR LABELING MAPS RE QUIRES THE PRECISE MODELING OF CARTOGRAPHER'S COMPETENCE WITHIN THE COMPUTER. THIS MODEL CAN BE LARGELY SUBDIVIDED INTO THREE PARTS: GENERALLY ACCEPTED CARTOGRAPHIC RULES, PROJECT SPECIFIC PROCEDURES AND REQUIREMENTS, AND A SYSTEM OF HEURISTICS BASED ON "RULES OF THUMB." RELATIVELY SIMPLE PROGRAMS YIELD ACCEPTABLE RESULTS FOR SIMPLE CASES. H ...
SBIR Phase II 1987 Department of Commerce -
DESIGN OF A HIGH SPEED, HIGH RESOLUTION SIDE SCAN SONAR SYS TEM
SBC: KLEIN ASSOC., INC. Topic: N/ASIDE SCAN SONAR HAS DEVELOPED TO THE POINT WHERE IT IS NOW AN ACCEPTED PART OF HYDROGRAPHIC CHARTING PROJECTS, AS WELL AS A BROAD RANGE OF OCEAN SEARCH AND SURVEY APPLICATIONS. ONE LIMITATION ON ITS UTILITY, HOWEVER, IS THE REQUIREMENT TO OPERATE THE SYSTEM AT RELATIVELY LOW SPEEDS (5 KNOTS OR LOR LESS) IN ORDER TO ACQUIRE HIGH-QUALITY DATA. ANY INCREASEIN VESSEL SPEED CAPABILITY WOULD RESULT IN G ...
SBIR Phase II 1987 Department of Commerce -
POLYCULTURE OF MARINE SHRIMP AND OYSTERS IN PONDS
SBC: Ocean Ventures Inc Topic: N/ATHE PROPOSAL IS TO CONDUCT RESEARCH ON POLYCULTURE OF OYSTERS IN PONDS WITH MARINE SHRIMP. SURVIVAL OF OYSTERS IN STATIC WATER PONDS IS LOW, BUT IT IS ANTICIPATED THE SURVIVAL AND GROWTH WILL BE GOOD IN PONDS WHERE AERATION DEVICESCAUSE WATER TO CIRCULATE WITHIN THE POND. BESIDES THE OBV IOUS ECONOMIC BENEFIT TO BE DERIVED FROM THE SALE OF OYSTERS, BENEFITS TO GENERAL POND PRODUCTIVITY ARE ANTICIP ...
SBIR Phase II 1987 Department of Commerce -
POLYCULTURE OF MARINE SHRIMP AND OYSTERS IN PONDS
SBC: Ocean Ventures Inc Topic: N/ATHE PROPOSAL IS TO CONDUCT RESEARCH ON POLYCULTURE OF OY- STERS IN PONDS WITH MARINE SHRIMPL SURVIVAL OF OYSTERS IN STATIC WATER PONDS IS LOW, BUT IT IS ANTICIPATED THE SURVI- VAL AND GROWTH WILL BE GOOD IN PONDS WHERE AERATION DEVICES CAUSE WATER TO CIRCULATE WITHIN THE POND. BESIDES THE OB- VIOUS ECONOMIC BENEFIT TO BE DERIVED FROM THE SALE OF OY- STERS, BENEFITS TO GENERAL POND PRODUCTIVITY ARE ...
SBIR Phase II 1987 Department of Commerce