You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Adaptive Data Fusion and Analysis System

    SBC: AMERICAN GNC CORPORATION            Topic: N04016

    This Phase II project is aimed at developing an advanced information fusion system applicable to the test and evaluation environment based on the development and applications of advanced concepts of intelligent processing to data fusion and analysis and decision support systems. The highly demanding requirements of the newer and future all-source data fusion and analysis systems for tests onboard ...

    SBIR Phase II 2005 Department of DefenseNavy
  2. Acoustic and Electro-Optic Data Fusion

    SBC: Arete Associates            Topic: N03041

    The goal of this SBIR Program is to enhance the AQS-20A computer-aided classification and identification performance by constructively exploiting acoustic and EO sensor measurements. Benefits from this program will accrue to underwater mine countermeasures due to improved probability of mine identification and reduced probability of false alarm. To this end Areté Associates is collaborating wit ...

    SBIR Phase II 2005 Department of DefenseNavy
  3. A Temperature Sensor Array for the Determination of Sound Velocity

    SBC: Arete Associates            Topic: N03117

    The XSVA is a 24-element vertical array of temperature and conductivity sensors, integrated into a standard sonobuoy, providing continuous estimates of sound velocity over a 72-hour measurement period. In Phase I, Areté Associates demonstrated the key elements of the XSVA array concept. We built and tested a breadboard sensor module, the backbone of the array. This module will make the parameter ...

    SBIR Phase II 2005 Department of DefenseNavy
  4. Automatic Real-time Computer Aided IDentification (ARCAID)

    SBC: Arete Associates            Topic: N03038

    Areté has developed a CAD / CAC / CAI algorithm for 3D range data collected by the AQS-20A EOID sensor. The algorithm, called Automatic Real-time Computer-Aided IDentification (ARCAID) performs detection, MLO/NMLO classification, shape classification, Mine/Non-Mine/Unknown identification (ID) and mine-type ID on EOID data compatible with the AQS-20A EOID sensor system. At the conclusion of th ...

    SBIR Phase II 2005 Department of DefenseNavy
  5. Dissolved Hydrogen Sensor

    SBC: Arete Associates            Topic: N03126

    Areté Associates proposes to develop a novel sensor using thick-film technology to measure variations in the concentration of dissolved hydrogen in the ocean environment. We will employ a unique layout of the classic Wheatstone bridge design that uses screened-palladium metal resistors as the transducer. Palladium absorbs hydrogen gas and changes its electrical resistance in response to the absor ...

    SBIR Phase II 2005 Department of DefenseNavy
  6. Enhanced Understandability and Effectiveness for Joint Strike Fighter (JSF) Automatic Logistic Products

    SBC: BCL Technologies            Topic: N03192

    Rapid maintenance allows aircraft to be repaired and available for duty faster, thus improving aircraft availability and helping our fight against terrorism and aiding homeland defense. One method of improving repair time, and subsequently aircraft availability, is to simplify maintenance manuals by converting them to a simpler form of Internationally Standardized English, the Simplified English L ...

    SBIR Phase II 2005 Department of DefenseNavy
  7. Integrated Information Architecture for Crisis Management and Response

    SBC: Brandes Associates, Inc.            Topic: N02137

    During the Phase 1 effort, a detailed architectural design for an Intelligent Consequent Management System (ICMS) was created. This architecture serves as the basis for Phase II work. The architecture describes a Consequence Management (CM) network comprised of two basic types of nodes: Intelligent Servers (IS) and Thin-client Applications (TCA). IS nodes service a selected set of TCAs within a gi ...

    SBIR Phase II 2005 Department of DefenseNavy
  8. High Fuel-to-Air Ratio (FAR) Development Tool

    SBC: CASCADE TECHNOLOGIES INC            Topic: N03187

    The objective is to develop a simulation tool capable of accurate predictions of the complex mixing process in gas turbine engine combustors, applicable to complex geometry, multi-physics problems, and combustion in lean and high FAR regions. Because of the importance of the mixing process, the simulation tool will be based on the large-eddy simulation technique. The code will be based on our unst ...

    SBIR Phase II 2005 Department of DefenseNavy
  9. Four-dimensional (4-D) Oceanographic Instrumentation

    SBC: CONTINENTAL CONTROLS AND DESIGN, INC.            Topic: N02197

    In Phase 2, CCD proposes to build and test directional wave buoy prototypes that are smaller than a soda can and could cost less than $1,000 in production. The heart of this new directional micro-buoy is a Tiny Guidance Engine (TGE) developed originally for smart munitions. In less than a cubic inch, TGE measures all 6 degrees of freedom inertially, 3 axes magnetically, pressure, and temperature ...

    SBIR Phase II 2005 Department of DefenseNavy
  10. H-60 Mission Avionics Technology Insertion

    SBC: CPU TECHNOLOGY, INC.            Topic: N03031

    The objective of this proposal is to develop a preliminary brassboard implementation for an H-60 system and for the AN/ALE-47, and demonstrate the interfaces through simulated flight using the ADVAYK brassboard. All designs will be virtually simulated and validated to ensure the desired behavior of the existing system is captured. The designs for each of the three projects will be validated vir ...

    SBIR Phase II 2005 Department of DefenseNavy
US Flag An Official Website of the United States Government