You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ENZYMES IMMOBILIZED ON GOLD SURFACES

    SBC: Escagenetics Corp.            Topic: N/A

    THE OBJECTIVE OF THIS PROJECT IS TO DEVELOP A NEW CLASS OF BIOSENSORS BASED ON THE USE OF COLLOIDAL GOLD DIRECTLY OR DEPOSITED AS A POROUS GOLD FILM. THE KEY TO THE APPROACH ISTHE IMMOBILIZATION OF ENZYMES ON GOLD SURFACES THAT PROVIDE FOR HIGHFLUX, HETEROGENEOUS ELECTRON TRANSFER. THE FEASIBILITY OF CONSTRUCTING THIS NEW CLASS OF BIOSENSORS WILL BE EVALUATED BY THE END OF PHASE I. THE OBJECTIVES ...

    SBIR Phase II 1987 Department of Energy
  2. A CLEAN HELIUM COMPRESSOR/EXPANDER FOR LONG LIFE CRYOGENIC SERVICE

    SBC: CREARE LLC            Topic: N/A

    CRYOGENIC HELIUM REFRIGERATORS AND LIQUIFIERS CONVENTIONALLYEMPLOY OIL LUBRICATED POSITIVE DISPLACEMENT COMPRESSORS AT THE WARM END AND FREQUENTLY USE PISTON TYPE EXPANSION ENGINES AT THE COLD END. THESE SYSTEMS REQUIRE EXTENSIVE AND VIGILANT MAINTENANCE TO CONTROL CONTAMINATION FROM LUBRICATING OIL AND ITS VOLATILE COMPONENTS MIGRATING TO THE COLD END. HENCE THE NEED FOR LOW MAINTENANCE COMPRESSO ...

    SBIR Phase II 1987 Department of Energy
  3. ALL-METAL, DEMOUNTABLE CRYOGENIC SEAL

    SBC: CREARE LLC            Topic: N/A

    IN MOST CRYOGENIC SYSTEMS, THE PIPING JOINTS IN COLD REGIONSOF THE SYSTEM ARE MADE BY WELDING OR SOLDERING. THIS IS ESSENTIAL BECAUSE EXISTING DESIGNS OF CRYOGENIC PIPE SEALS CANNOT BE RELIED ON NOT TO LEAK. ANY SUCH LEAKS INTO THE COLD BOX REDUCE THE EFFECTIVENESS OF THE INSULATION, THEREBY REDUCING THE EFFICIENCY OF THE REFRIGERATOR. WELDEDJOINTS MAKE REPLACEMENT OF COMPONENTS DIFFICULT AND HAVE ...

    SBIR Phase II 1987 Department of Energy
  4. DOSIMETRY AND MONITORING OF AROMATIC AMINES

    SBC: Perfect View Inc.            Topic: N/A

    UP TO 35,000 WORKERS OF THE U.S. CHEMICAL INDUSTRY AND MORE THAN 270,000 WORKERS IN THE PETROLEUM AND COAL-RELATED INDUSTRIES MAY BE EXPOSED DAILY TO CARCINOGENIC AND MUTANOGENIC COMPOUNDS FROM THE AROMATIC AMINE GROUP. COAL GAS, INC. DEVELOPED A VERY SIMPLE HIGH-TECHNOLOGY APPROACH TO MONITORING THE EXPOSURE OF PERSONNEL TO TRACE LEVELS OF POLLUTANTS AND IS PROPOSING TO CONDUCT R & D WHICH WILL E ...

    SBIR Phase II 1987 Department of Energy
  5. Hybrid Veil Material for ESD/EMI Applications

    SBC: NanoTechLabs Inc.            Topic: AF083C071

    The objective of this proposal is to develop a hybrid conductive veil technology for use in UCASS or FA/xx and also as a replacement or repair of the existing conductive metallic ground planes on legacy platforms. The hybrid veil system can be made into a prepreg and bonded directly to the composite airframe. As a composite system, it is tougher and stronger than the current ground plane system, l ...

    SBIR Phase II 2014 Department of DefenseNavy
  6. A Low Cost Electromagnetic Induction Ground Fault Detector

    SBC: CREARE LLC            Topic: N112133

    Machinery Control System (MCS) cabling faults can be difficult to identify and locate since as many as 3,000 to 5,000 I/O points are used and multiple junctions exist in each cable. A single MCS fault can require as many as four maintainers and a full day of troubleshooting to isolate and resolve, and MCS capability can be substantially reduced during this process. Creare is developing a low-cost ...

    SBIR Phase II 2014 Department of DefenseNavy
  7. TECHNICAL PROPOSAL FOR THE SHIPBOARD LIGHTING SYSTEM (AVIATION LIGHTING SYSTEM-CONTROL PANEL SET (ALS-CPS)) SBIR N04-081 PHASE II

    SBC: CRITICAL COMMUNICATIONS, CONTROLS AND INSTRUMENTS, LLC            Topic: N04081

    This Proposal identifies the tasks to be performed by C3I for the partial completion of the Aviation Lighting System Control Panel Set (ALS-CPS) technology developments of SBIR Topic N04-081. The Advanced Lighting System Control Panel Set (ALS-CPS) components include a 12 Control Panel (12 CP), Network Switch (NS), Modular Protocol Controller (MPC), Variable Transformer Power Control Module (VTPCM ...

    SBIR Phase II 2014 Department of DefenseNavy
  8. Post-IED Hull Inspection Tool

    SBC: CORVID TECHNOLOGIES, LLC            Topic: N123156

    On todays battlefields, vehicles are at risk of encountering improvised explosive devices (IEDs). Fortunately, not all of these result in complete vehicle loss. Following events at both ends of the severity spectrum, Battle Damage Assessment and Repair (BDAR) and event reconstruction efforts lack the fidelity that predictive simulations have begun to offer. Sending a vehicle back to the depot for ...

    SBIR Phase II 2014 Department of DefenseNavy
  9. FLAAT Growth Technology for Low Cost Thick High Quality GaN on Thin 8 Sapphir

    SBC: KYMA TECHNOLOGIES, INC.            Topic: 11b

    The use of non-native substrates for GaN- based devices leads to devices with high densities of defects stemming from misfit dislocation formation due to lattice mismatch and large values of wafer bow stemming from thermal mismatch. The latter is particularly problematic as one attempts to grow device films on large area substrates. The high defect densities give rise to degraded performance and r ...

    SBIR Phase II 2014 Department of Energy
  10. Multiscale Hydrogeologic-Biogeochemical Process Monitoring and Prediction Framework

    SBC: SUBSURFACE INSIGHTS LLC            Topic: 20a

    Remediation and long term management of contaminated sites is likely to require hundreds of billions of dollars. Most of the sites which remain in the US inventory of contaminated sites do not have simple solutions, and effective remediation of these sites will require a fundamental, timely and actionable understanding of physical, chemical and biological processes and overall system behavior in c ...

    SBIR Phase II 2014 Department of Energy
US Flag An Official Website of the United States Government