You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Hybrid Veil Material for ESD/EMI Applications
SBC: NanoTechLabs Inc. Topic: AF083C071The objective of this proposal is to develop a hybrid conductive veil technology for use in UCASS or FA/xx and also as a replacement or repair of the existing conductive metallic ground planes on legacy platforms. The hybrid veil system can be made into a prepreg and bonded directly to the composite airframe. As a composite system, it is tougher and stronger than the current ground plane system, l ...
SBIR Phase II 2014 Department of DefenseNavy -
A Low Cost Electromagnetic Induction Ground Fault Detector
SBC: CREARE LLC Topic: N112133Machinery Control System (MCS) cabling faults can be difficult to identify and locate since as many as 3,000 to 5,000 I/O points are used and multiple junctions exist in each cable. A single MCS fault can require as many as four maintainers and a full day of troubleshooting to isolate and resolve, and MCS capability can be substantially reduced during this process. Creare is developing a low-cost ...
SBIR Phase II 2014 Department of DefenseNavy -
TECHNICAL PROPOSAL FOR THE SHIPBOARD LIGHTING SYSTEM (AVIATION LIGHTING SYSTEM-CONTROL PANEL SET (ALS-CPS)) SBIR N04-081 PHASE II
SBC: CRITICAL COMMUNICATIONS, CONTROLS AND INSTRUMENTS, LLC Topic: N04081This Proposal identifies the tasks to be performed by C3I for the partial completion of the Aviation Lighting System Control Panel Set (ALS-CPS) technology developments of SBIR Topic N04-081. The Advanced Lighting System Control Panel Set (ALS-CPS) components include a 12 Control Panel (12 CP), Network Switch (NS), Modular Protocol Controller (MPC), Variable Transformer Power Control Module (VTPCM ...
SBIR Phase II 2014 Department of DefenseNavy -
Post-IED Hull Inspection Tool
SBC: CORVID TECHNOLOGIES, LLC Topic: N123156On todays battlefields, vehicles are at risk of encountering improvised explosive devices (IEDs). Fortunately, not all of these result in complete vehicle loss. Following events at both ends of the severity spectrum, Battle Damage Assessment and Repair (BDAR) and event reconstruction efforts lack the fidelity that predictive simulations have begun to offer. Sending a vehicle back to the depot for ...
SBIR Phase II 2014 Department of DefenseNavy -
Field-Serviceable Superconducting Cable Housing
SBC: CREARE LLC Topic: N121077Legacy copper-based power distribution and degaussing cables will not be able to meet the future requirements of Navy ships and submarines. While cable systems employing high-temperature superconductors (HTS) have the potential to meet this need, further development work is required to improve the performance and increase the technology readiness level of key system components. The proposed work f ...
SBIR Phase II 2014 Department of DefenseNavy -
Ultrasonic Communication System for Noisy Environments
SBC: CREARE LLC Topic: N131005Safe efficient operations on the flight line or on the deck of an aircraft carrier require effective communications between members of the crew and between members of the crew and the aircraft pilot. Maintainers working on the flight deck or flight line are often subject to extremely loud noise fields (110 to 140 dBA), which makes natural voice communications challenging or impossible. Missed comm ...
SBIR Phase II 2014 Department of DefenseNavy -
Enhanced Coast and Shorelines
SBC: COGNITICS INC Topic: N091026In recent years, the military has put a great deal of effort into improving the realism and accuracy of simulation and mission rehearsal programs. Enhancing the realism and fidelity of simulations for complex terrain features and urban areas has become a priority. While high resolution satellite and aerial imagery is commonly available, high resolution digital elevation model (DEM) data is not com ...
SBIR Phase II 2014 Department of DefenseNavy -
Interactive Generative Manifold Learning
SBC: Signal Innovations Group, Inc. Topic: N122138Signal Innovations Group (SIG) proposes a Phase II program that addresses three primary capabilities for applications involving high-dimensional observed data: reversible nonlinear data dimensionality reduction, static and dynamic synthesis of data in the observed space based on a low-dimensional latent space, and intuitive and meaningful human interaction with the data in both the observed and la ...
SBIR Phase II 2014 Department of DefenseNavy -
Advanced Tactical Cryocoolers for UAV Applications
SBC: CREARE LLC Topic: N131064Low temperature superconducting electronics have the potential to revolutionize digital communications from Unmanned Aerial Vehicles (UAVs), but must operate at cryogenic temperatures. Commercial cryocoolers are large and inefficient and are unable to meet size, weight, and power requirements for UAVs. Our approach and the innovation is a reverse turbo-Brayton cryocooler that provides refrigeratio ...
SBIR Phase II 2014 Department of DefenseNavy -
Development of an Advanced Bearing for Extreme Service Environments
SBC: CREARE LLC Topic: N132103Aircraft carriers are the backbone of the U.S. Navys fleet, which operates around the globe, with the sole purpose of launching and recovering aircraft to support U.S. military and peacekeeping missions. The ability to quickly and safely launch aircraft can become a key limitation for an aircraft carrier when trying to deliver the maximum amount of warfighter capability. Currently, the wheel beari ...
SBIR Phase II 2014 Department of DefenseNavy