You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Small Form Factor Airborne HF, VHF and UHF RF Direction Finding

    SBC: APPLIED SIGNALS INTELLIGENCE, INC.            Topic: A11121

    ABSTRACT: The objective of this sequential Phase II SBIR is to deliver a Technology Readiness Level 6 (TRL-6) airborne HF, VHF and UHF RF direction finding system that is suitable for integration with SUAS and to demonstrate it in a realistic airborne environment against representative signals. This proposed effort leverages the completed Army Phase I SBIR that demonstrated accurate DF in field ...

    SBIR Phase II 2014 Department of DefenseAir Force
  2. Wireless, Time-synchronized, Event Control System

    SBC: McQ Inc.            Topic: AF103236

    ABSTRACT: McQ Inc. developed a prototype Wireless Time-synchronized Event Control System (WTECS) for the 846th Test Squadron operating the Holloman High Speed Test Track (HHSTT) at Holloman Air Force Base. The current state of WTECS is TRL6 and MRL 9, while the desired end state of the transition effort is TRL7 and MRL 10. Improvements such as developing a database for the base station will all ...

    SBIR Phase II 2014 Department of DefenseAir Force
  3. Rain Erosion Modeling for Hypersonic Thermal Protection System (TPS) and Structures

    SBC: MENTIS SCIENCES INC            Topic: MDA05021

    Mentis Sciences (Mentis) is providing Low Rate Initial Production (LRIP) line to produce a Radome Assembly (RA). Mentis focus is to assure all elements of the production process approaches a Manufacturing Readiness Level (MRL) 8. This effort requires developing processes and Design of Experiments (DOE) for controlling each element of production to assure quality and cost goals for meeting LRIP. ...

    SBIR Phase II 2014 Department of DefenseMissile Defense Agency
  4. Micromachined Probes for Measurement and Characterization of Terahertz Materials and Devices

    SBC: DOMINION MICROPROBES, INC.            Topic: A12aT022

    The objective of this phase II STTR program is twofold: (1) to design, prototype, and commercialize differential on-wafer probes for characterizing devices in the 140220 GHz and 220320 GHz bands, and (2) to engineer the geometry and material of the micromachined probe tip to enable robust, consistent, and low-resistance electrical contact to devices with various contact pad metallizations, includi ...

    STTR Phase II 2014 Department of DefenseArmy
  5. Chemical Analyzer System for In Situ and Real Time Surface Monitoring for Composition Control During Synthesis of Compound Semiconductor Films

    SBC: Staib Instruments, Inc.            Topic: A13AT011

    The area of thin film growth has progressed rapidly, producing many high performance new materials which require accuracy of their atomic composition to perform as expected. Any method to provide real time in situ information about the elemental composition of the growing surface is highly valuable for these new, complicated materials. Utilizing a new instrument design, the Phase I project team ...

    STTR Phase II 2014 Department of DefenseArmy
  6. Blast Exposure Dosimetry System (BEDS)

    SBC: McQ Inc.            Topic: N123152

    Explosive devices are an ever present danger to the modern warfighter. These devices can take a wide range of forms from hand grenades to mortars to improvised explosive devices (IED). The pressure wave from an explosive blast can cause severe internal and external injury to a warfighter, often in the form of traumatic brain injuries (TBI). Currently, those who are within 50m of an explosion, even ...

    SBIR Phase II 2014 Department of DefenseNavy
  7. Military Training Systems Acceptance Test & Evaluation

    SBC: INNOVATIVE DEFENSE TECHNOLOGIES, LLC            Topic: N07034

    Automated testing will need to become an integral part in the PMA-281 T&E program and an automated testing program needs to be developed and implemented. Since PMA-281 programs will comply with the OSD UCS Architecture, which is Service Oriented Architecture (SOA)-based, the PMA-281 T&E program/automated testing strategy will need to consider automated testing throughout the entire SOA testing lif ...

    SBIR Phase II 2014 Department of DefenseNavy
  8. Field-Serviceable Superconducting Cable Housing

    SBC: CREARE LLC            Topic: N121077

    Legacy copper-based power distribution and degaussing cables will not be able to meet the future requirements of Navy ships and submarines. While cable systems employing high-temperature superconductors (HTS) have the potential to meet this need, further development work is required to improve the performance and increase the technology readiness level of key system components. The proposed work f ...

    SBIR Phase II 2014 Department of DefenseNavy
  9. Feature Based Machine Leaning

    SBC: VADUM INC            Topic: MDA12028

    The bulk filtering algorithm is designed to suppress or eliminate uninteresting objects from a sensor data stream allowing sensor management systems to focus finite resources more effectively on objects of interest. During Phase II Vadum will carry out a series of demonstrations showing the incremental integration of their bulk filter approach within a high fidelity lab environment. Vadum will a ...

    SBIR Phase II 2014 Department of DefenseMissile Defense Agency
  10. Antenna Design in PolyStrata for Unmanned Aerial Vehicles

    SBC: Nuvotronics, LLC            Topic: AF131141

    ABSTRACT: There is the growing demand for user terminals for mobile satellite telecommunication (SATCOM) applications including K/Ka dual-band SATCOM for unmanned and manned aircraft platforms. Nuvotronics is pleased to propose a two-year SBIR program to the Air Force for the development of a fully-electronically steerable array capable of scanning beams from zenith to near the horizon to replace ...

    SBIR Phase II 2014 Department of DefenseAir Force
US Flag An Official Website of the United States Government