You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Swimmer Detection Sonar Network- Phase II: Integration Architecture
SBC: Scientific Solutions, Inc. Topic: N022071Under this SBIR project we are developing a Swimmer Detection Sonar Network (SDSN). The SDSN concept is to deploy a large number of networked inexpensive sonar nodes to protect a harbor or pier against terrorist swimmers. Under Phase I SBIR funding we developed potential schemes for the difficult task of integrating many sonar nodes. Under other funding provided by both the Republic of Singapor ...
SBIR Phase II 2004 Department of DefenseNavy -
Multi-Resolution Representations and Simulation of Large Terrain Models
SBC: COLLIDE, INC. Topic: A03207We propose to develop multiresolution representations and algorithms for synthetic terrain environments. They will be used for representing large terrain models as well dynamic and atmospheric simulations. Our ultimate goal is to increase the validity of the simulation by incorporating the multiple models at varying resolutions. We will use the OneSAF simulation Product Line Architecture Framework ...
SBIR Phase II 2005 Department of DefenseArmy -
Automatic Three-Dimensional (3-D) Target Template Generation
SBC: INTERNATIONAL ASSOCIATION OF VIRTUAL ORGANIZATIONS, INCORPORATED Topic: N05017The US Navy is seeking improved capabilities to quickly and efficiently generate 3-D target templates (or “site models”) to support such operational systems as the Tomahawk Command and Control Systems (TC2S), Distributed Common Ground Station-Navy (DCGS-N), and collateral damage assessment (e.g., CDET and FastCD). There are two parts of interest. The first is to extract valid and reliable 2-D ...
SBIR Phase II 2005 Department of DefenseNavy -
High Efficiency Mission Performance for Underwater Expendable Countermeasure Devices Commonality Applications
SBC: NEKTON RESEARCH LLC Topic: N03042The proposed Phase II effort will implement design recommendations set forth in the Phase I Final Report. The result will be an efficient, mobile ADC Mk2 (MADC) acoustic countermeasure device. The proposed technology insertion will retain the ADC Mk2 form factor and acoustic package, providing a mobile device that can be deployed with legacy launch systems. MADC will integrate RMP propulsor tec ...
SBIR Phase II 2005 Department of DefenseNavy -
Sanders IR Countermeasures (SICM) System
SBC: SANDERS DESIGN INTERNATIONAL Topic: AF03248Sanders Design International (SDI), Wilton, NH proposes an innovative defensive countermeasure against man portable air defense system (MANPADS) weapons to 15,000 feet altitude. Sanders Infrared Counter Measure (SICM) system is proposed for installation on commercial airliners and legacy military aircraft for protection of aircraft and personnel, during take-off, low-level flight, and landing situ ...
SBIR Phase II 2004 Department of DefenseAir Force -
A Multi-Spectral Sensor for Missile Threat Warning
SBC: SOLID STATE SCIENTIFIC CORPORATION Topic: AF03219Solid State Scientific Corporation is pleased to propose a Phase II program to enhance the state of current missile threat warning systems. A new algorithm concept using up to four MWIR color bands will be explored for identifying and declaring threats approaching threats while rejecting stationary or receding targets as clutter. The band pass of the four narrow-band filters in the MWIR will be ...
SBIR Phase II 2004 Department of DefenseAir Force -
Fault-to-Failure Progression Modeling of Propulsion System and Drive Train Bearings for Prognostic and Useful Performance Life Remaining Predictions
SBC: SENTIENT SCIENCE CORPORATION Topic: N02195Military and commercial aircraft operators are moving toward predictive maintenance to minimize costs while maximizing asset availability and safety. Key technological prerequisites for this new approach are the ability to monitor the condition of critical components, and the ability to accurately forecast their remaining useful life. Phase I of this project clearly demonstrated the feasibility of ...
SBIR Phase II 2004 Department of DefenseNavy -
Advanced Helmet for Maintainer Head and Hearing Protection
SBC: CREARE LLC Topic: N04255Improved head and hearing protection is required for aircraft maintainers working on a carrier flight deck during launch and recovery operations. The current head protection is inadequate in many aspects including impact protection, hearing protection, cleaning, comfort, and compatibility with night vision goggles (NVGs) and with chemical, biological, and radiological (CBR) equipment. Creare pro ...
SBIR Phase II 2005 Department of DefenseNavy -
Prognostic Wear Prediction Tool for BlackHawk Hanger Bearings
SBC: SENTIENT SCIENCE CORPORATION Topic: A04077During Phase I, the Blackhawk hanger bearing and oil cooler fan bearing applications were studied in detail, including analysis of vibration and temperature data from used oil cooler bench tests (conducted by Sikorsky) and used hanger bearing bench tests (conducted by Sentient). This data, along with an analysis of operational and environmental conditions, has allowed us to identify the probable r ...
SBIR Phase II 2005 Department of DefenseArmy -
Multi-Sensor Terrain Fusion
SBC: INTERNATIONAL ASSOCIATION OF VIRTUAL ORGANIZATIONS, INCORPORATED Topic: N03174The Navy is seeking improved capabilities to generate automatically elevation data products and have updatable and retrievable output via an automated advanced tactical terrain database system, supporting the Tomahawk Cruise Missile Program. The envisioned end-to-end solution must be able to process, manage, and/or fuse a variety of inputs, and these include multi-source imagery as well as existin ...
SBIR Phase II 2005 Department of DefenseNavy