You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CLEAN HELIUM COMPRESSOR/EXPANDER FOR LONG LIFE CRYOGENIC SERVICE

    SBC: CREARE LLC            Topic: N/A

    CRYOGENIC HELIUM REFRIGERATORS AND LIQUIFIERS CONVENTIONALLYEMPLOY OIL LUBRICATED POSITIVE DISPLACEMENT COMPRESSORS AT THE WARM END AND FREQUENTLY USE PISTON TYPE EXPANSION ENGINES AT THE COLD END. THESE SYSTEMS REQUIRE EXTENSIVE AND VIGILANT MAINTENANCE TO CONTROL CONTAMINATION FROM LUBRICATING OIL AND ITS VOLATILE COMPONENTS MIGRATING TO THE COLD END. HENCE THE NEED FOR LOW MAINTENANCE COMPRESSO ...

    SBIR Phase II 1987 Department of Energy
  2. ALL-METAL, DEMOUNTABLE CRYOGENIC SEAL

    SBC: CREARE LLC            Topic: N/A

    IN MOST CRYOGENIC SYSTEMS, THE PIPING JOINTS IN COLD REGIONSOF THE SYSTEM ARE MADE BY WELDING OR SOLDERING. THIS IS ESSENTIAL BECAUSE EXISTING DESIGNS OF CRYOGENIC PIPE SEALS CANNOT BE RELIED ON NOT TO LEAK. ANY SUCH LEAKS INTO THE COLD BOX REDUCE THE EFFECTIVENESS OF THE INSULATION, THEREBY REDUCING THE EFFICIENCY OF THE REFRIGERATOR. WELDEDJOINTS MAKE REPLACEMENT OF COMPONENTS DIFFICULT AND HAVE ...

    SBIR Phase II 1987 Department of Energy
  3. A Magneto-Hydrodynamic System for Generating High-Pressure Impluses in Spallation Targets

    SBC: CREARE LLC            Topic: 02c

    The Spallation Neutron Source (SNS) at Oak Ridge National Laboratory (ORNL) produces neutrons that allow researchers to study key material properties. Neutrons are produced by the interaction of a very short (1 µsec), highly intense (1 MW at 60 Hz) pulse of protons with a flowing bath of mercury called the target. The process deposits a large amount of thermal energy in the mercury. Because mer ...

    SBIR Phase I 2008 Department of Energy
  4. Analysis Tools for Detection and Diagnosis of Biological Threats

    SBC: ALPHA-GAMMA TECHNOLOGIES, INC.            Topic: CBD04113

    DNA microarray technology, in combination with statistical and predictive modeling tools, could be used to evaluate thousands of genes against distinct gene expression patterns induced by chemical/biological agents to provide early identification and speed therapeutic intervention. The overall objective of this Phase II effort is to leverage existing public domain resources and commercial tools t ...

    SBIR Phase II 2005 Department of DefenseOffice for Chemical and Biological Defense
  5. AN EXPERT SYSTEM OPERATOR AID FOR NUCLEAR POWER PLANT MANEUVERS

    SBC: Applied Research Associates, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  6. An Innovative Technique of Preparing Solar Grade Silicon Wafers from Metallurgical Grade Silicon by In-Situ Purification

    SBC: GT Equipment Technologies, Inc.            Topic: 39a

    75655S The photovoltaics (PV) industry is having difficulty finding enough raw materials to match its rapid growth. In addition, traditional sources of secondary grade polysilicon are no longer readily available at inexpensive prices. Reducing the cost of solar silicon wafers is the key to lowering the price of crystalline silicon solar cells. This project will develop a single-step wafer fabr ...

    SBIR Phase II 2005 Department of Energy
  7. A RAINFALL MEASUREMENT DEVICE USING UNDERWATER ACOUSTIC SIGNALS

    SBC: CREARE LLC            Topic: N/A

    MEASUREMENTS OF RAINFALL OVER LARGE BODIES OF WATER SUCH AS LARGE LAKES OR OCEANS ARE MADE INFREQUENTLY BECAUSE OF THE LACK OF AN ACCURATE MEASURING DEVICE. A LARGE PORTION OF THE EARTH'S PRECIPITATION FALLS OVER THE OCEANS; THEREFORE, IT IS ESSENTIAL FOR UNDERSTANDING GLOBAL CLIMATE TO HAVE ACCURATE MEASUREMENTS OF RAINFALL OVER LARGE WATER AREAS. A DEVICE WILL BE DEVELOPED TO MEASURE RAINFALL AC ...

    SBIR Phase I 1987 Department of Energy
  8. A Robust Microfabricated Specimen Support with Integrated Capabilities for In-Situ Experimentation in the Transmission Electron Microscope

    SBC: Protochips, Inc.            Topic: 23

    79454S Despite advances in modern electron optics, which have permitted observation with unprecedented resolutions, most materials science research involves the quantification of static properties of materials. This is mostly due to limitations in modern day equipment and the time and cost associated with modifying existing microscopes. Consequently a need exists to extend the current ability t ...

    SBIR Phase I 2005 Department of Energy
  9. CONTINUOUS CASTING OF METALLIC NUCLEAR FUEL WITHOUT CONTAINMENT CONTACT

    SBC: CREARE LLC            Topic: N/A

    N/A

    SBIR Phase I 1987 Department of Energy
  10. DOSIMETRY AND MONITORING OF AROMATIC AMINES

    SBC: Perfect View Inc.            Topic: N/A

    UP TO 35,000 WORKERS OF THE U.S. CHEMICAL INDUSTRY AND MORE THAN 270,000 WORKERS IN THE PETROLEUM AND COAL-RELATED INDUSTRIES MAY BE EXPOSED DAILY TO CARCINOGENIC AND MUTANOGENIC COMPOUNDS FROM THE AROMATIC AMINE GROUP. COAL GAS, INC. DEVELOPED A VERY SIMPLE HIGH-TECHNOLOGY APPROACH TO MONITORING THE EXPOSURE OF PERSONNEL TO TRACE LEVELS OF POLLUTANTS AND IS PROPOSING TO CONDUCT R & D WHICH WILL E ...

    SBIR Phase II 1987 Department of Energy
US Flag An Official Website of the United States Government