You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. A CLEAN HELIUM COMPRESSOR/EXPANDER FOR LONG LIFE CRYOGENIC SERVICE

    SBC: CREARE LLC            Topic: N/A

    CRYOGENIC HELIUM REFRIGERATORS AND LIQUIFIERS CONVENTIONALLYEMPLOY OIL LUBRICATED POSITIVE DISPLACEMENT COMPRESSORS AT THE WARM END AND FREQUENTLY USE PISTON TYPE EXPANSION ENGINES AT THE COLD END. THESE SYSTEMS REQUIRE EXTENSIVE AND VIGILANT MAINTENANCE TO CONTROL CONTAMINATION FROM LUBRICATING OIL AND ITS VOLATILE COMPONENTS MIGRATING TO THE COLD END. HENCE THE NEED FOR LOW MAINTENANCE COMPRESSO ...

    SBIR Phase II 1987 Department of Energy
  2. Acoustic Surveillance System

    SBC: CREARE LLC            Topic: A08113

    The military needs better methods of monitoring remote facilities to protect them against burglary and vandalism. Many of these facilities cover large areas, contain numerous buildings and other valuable assets, and are at high risk for theft. New acoustic monitoring technologies are needed that will allow deployment of large numbers of low-cost, autonomous sensors. Each sensor must provide rel ...

    SBIR Phase I 2008 Department of DefenseArmy
  3. ACTIVELY CONTROLLED GAS BEARINGS

    SBC: Burton Technologies Inc            Topic: N/A

    RESEARCH AND DEVELOPMENT WILL BE CARRIED OUT TO PROVIDE PROTOTYPE, ACTIVELY CONTROLLED GAS BEARINGS FOR PRECISION MOVEMENT IN INSTRUMENTS AND MACHINE TOOLS. THIS WILL DRAW UPON PRELIMINARY WORK ON (1) FABRICATION, (2) DYNAMIC ANALYSIS OF THE BEARING AND SUPPORTED MASS, (3) PIEZOELECTRIC VALVING AND PIEZOELECTRIC DISPLACEMENT OF THE BEARING SURFACE, AND (4) THE ADAPTATION OF A MICROPROCESSOR TO SER ...

    SBIR Phase II 1987 National Science Foundation
  4. Adaptation of post-disaster mental health training for black communities

    SBC: HERMES LLC            Topic: N/A

    DESCRIPTION (provided by applicant): Adaptation and adoption of evidence based mental health strategies has been challenging for those working with subpopulations disproportionately affected by the aftermath of natural disasters and may contribute to the g rowing racial disparities seen in access to mental health services, diagnosis, and treatment of mental health conditions. Outside assistance te ...

    SBIR Phase I 2008 Department of Health and Human ServicesNational Institutes of Health
  5. ADAPTING EXISTING CURRICULA FOR PROMOTING SOCIAL AND ADA

    SBC: THREE C INSTITUTE FOR SOCIAL DEVELOPMT            Topic: N/A

    Location 1903 N HARRISON AVE, STE 101 CARY, NC 27513 United States N44MH0664102C $365 147.00 2 005 ADAPTING EXISTING CURRICULA FOR PROMOTING SOCIAL AND ADA Department of Health and Human Services National Institutes of Health SBIR PHS2006-1 THREE C INSTIT ...

    SBIR Phase II 2005 Department of Health and Human ServicesNational Institutes of Health
  6. ADAPTING EXISTING CURRICULA FOR PROMOTING SOCIAL AND ADAPTIVE FUNCTIONING IN INDI

    SBC: 3-C Institute for Social Development, Inc.            Topic: N/A

    Children with high-functioning autism spectrum disorders (HFX-ASD) are at heightened risk for a wide range of social relationship problems. Specialists in the field of autism suggest the social skill deficits experienced by people with HFX-ASD are the most difficult aspect of the disorder to overcome. This Phase II project will continue the research and development (RandD) of an innovative social ...

    SBIR Phase II 2008 Department of Health and Human ServicesNational Institutes of Health
  7. ADAPTIVE GRID GENERATION FROM HARMONIC MAPS ON RIEMANNIAN MANIFOLDS

    SBC: CREARE LLC            Topic: N/A

    THE RESULTS OBTAINED TO DATE BY VARIOUS AUTHORS INDICATE CLEARLY THAT NUMERICAL SOLUTIONS ARE MORE ACCURATE AND RE QUIRE MUCH LESS COMPUTER TIME AND STORAGE WHEN THE GRID POINTS ARE PROPERLY LOCATED. THE DEVELOPMENT OF THE SOLU- TION OVER A REAL TIME PATH OR ITERATIVE PROCESS (FALSE TIME PATH) REQUIRES THE MESH NODES TO MOVE DYNAMICALLY IN THE PROPER POSITION AT EACH ITERATION OR INSTANCE OF TIME. ...

    SBIR Phase I 1987 National Science Foundation
  8. Adaptive Hyperspectral Sensor for Battlefield Combustibles

    SBC: SOLID STATE SCIENTIFIC CORPORATION            Topic: AF04207

    The objective of this program is to develop a wide field of view spectral imaging sensor to support theater surveillance and intelligence. The AHS operates in the Mid Wave Infrared (MWIR) band and provides day/night spectral target cueing, geolocation and identification of hot battlefield threats. Currently deployed EO sensors can measure broadband MWIR signals, but are incapable of providing adva ...

    SBIR Phase II 2005 Department of DefenseAir Force
  9. A Device to Monitor Toe Walking in Children with Cerebral Palsy

    SBC: Simbex LLC            Topic: N/A

    DESCRIPTION (provided by applicant): This goal of this SBIR project is to quantify and validate the feasibility and potential for a non- obtrusive, wearable, in-shoe gait-monitoring device for children with Cerebral Palsy (CP). It is hypothesized that continuous monitoring and analysis of simple gait parameters in children with CP outside the clinical laboratory and during normal daily activities ...

    SBIR Phase II 2008 Department of Health and Human ServicesNational Institutes of Health
  10. Adhesives for Rapid Outfitting and Insulation Attachment

    SBC: TRIANGLE POLYMER TECHNOLOGIES, INC.            Topic: N08180

    There is an ongoing requirement to reduce the cost and time associated with insulation attachment during outfitting and new construction on naval vessels. Currently, the primary method of attaching insulation on metal surfaces is through the used of welded studs. These studs are attached to decks and bulkheads early in the construction process and are often damaged before the construction process ...

    SBIR Phase I 2008 Department of DefenseNavy
US Flag An Official Website of the United States Government