You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ASSESSMENT OF SMART SENSOR TECHNOLOGIES FOR CONVENTIONAL ANDADVANCED LWRS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    A RESEARCH PROJECT IS PROPOSED TO EVALUATE THE SUITABILITY OF NEWLY DEVELOPED SMART SENSOR TECHNOLOGIES FOR BOTH OF THEFOLLOWING NUCLEAR POWER PLANT APPLICATIONS: MANAGEMENT OF AGING DEGRADATION OF SAFETY SYSTEM TEMPERATUREAND PRESSURE SENSORS IN CONVENTIONAL LWRS SMART TEMPERATURE AND PRESSURE SENSORS FOR ADVANCED LWRS. THE PROJECT WILL ADDRESS BOTH THE CALIBRATION DRIFT AND RESPONSE TIME DEGRADA ...

    SBIR Phase II 1992 Nuclear Regulatory Commission
  2. IMPROVED STEADY-STATE INITIALIZATION ALGORITHMS FOR COMPUTER CODES

    SBC: Compu Simulation & Anal I            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  3. DEGRATION OF NUCLEAR PLANT TEMPERATURE SENSORS

    SBC: ANALYSIS AND MEASUREMENT SERVICE CORPORATION            Topic: N/A

    SAFETY SYSTEM TEMPERATURE SENSORS IN NUCLEAR POWER PLANTS ARE SUBJECT TO PERFORMANCE DEGRATION BECAISE PF AGING EFFECTS. A PROGRAM OF LABORATORY TESTING AND IN-SITU TESTINGIS NEEDED TO ENSURE THAT AGING DOES NOT LEAD TO REDUCED SAFETY AND AVAILABILITY. MUCH OF THE TECHNOLOGY NEEDED FOR THIS PROGRAM NOW EXISTS AS ISOLATED METHODS AND PROCEDURES. THESE WILL BE USED IN THIS PROJECT TO PERFORM AN AGIN ...

    SBIR Phase II 1987 Nuclear Regulatory Commission
  4. RISK-BASED ANALYSIS OF TECHNICAL SPECIFICATIONS

    SBC: Applied Biomathematics Inc            Topic: N/A

    N/A

    SBIR Phase I 1987 Nuclear Regulatory Commission
  5. DEVELOP AN INHALATION SCREENING DOSE MONITOR FOR WORKERS AT NUCLEAR POWER PLANTS

    SBC: Mikayola International            Topic: N/A

    AN "INHALATION SCREENING DOSE COLLAR-STANCHION MONITOR" WITHEMBEDDED MINIATURE THIN-WALL GEIGER-MUELLER RADIATION DETECTORS EVALUATES THE THYROID GLAND FOR NANOCURIE ACTIVITYINVENTORY. THE PRIMARY TECHNICAL OBJECTIVE IS TO ESTABLISH THAT THE "COLLAR-STANCHION MONITOR" WILL BE CAPABLE OF DETECTING WITHIN 15 SECONDS AND WITH 2 SIGMA CONFIDENCE AN ACTIVITY INVENTORY OF 0.7 NANOCURIES OF I-131 DOSE EQ ...

    SBIR Phase I 1987 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government