You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. High Voltage Pulse Forming Network (PFN) Capacitor

    SBC: POLYK TECHNOLOGIES LLC            Topic: A14063

    The Phase I project has demonstrated that high energy density of 1.6 J/cc can be achieved in large size film capacitors with microsecond discharge speed and long DC lifetime. Advanced electrode technology may further improve the energy density in large size capacitors. This SBIR Phase II project will develop and improve manufacturing technologies and capacitor design to achieve high energy density ...

    SBIR Phase II 2016 Department of DefenseArmy
  2. A Non-catalytic JP-8 Reformer

    SBC: ADVANCED COOLING TECHNOLOGIES INC            Topic: A14076

    Partial oxidation has been considered as the simplest fuel reforming method that does not require water management. However, the higher hydrocarbons and sulfur compounds in military fuel create significantly challenging for catalyst based reformer. An innovative non-catalytic thermal partial oxidation (TPOX) reformer has been developed at Advanced Cooling Technologies, Inc. (ACT). The proposed Swi ...

    SBIR Phase II 2016 Department of DefenseArmy
  3. Ceramic Matrix Composite Materials for Transpiration Cooling

    SBC: COMBUSTION RESEARCH & FLOW TECHNOLOGY INC            Topic: A14007

    The proposed effort will formulate and demonstrate the methodology for fabricating Porous Ceramic Matrix Composite (PCMC) transpiration plates with controlled levels of porosity, suitable for high-speed/high-temperature missile applications. The porosity of the fabricated plates will be characterized and compared with traditional porous metallic plates with drilled holes constructed for scramjet m ...

    SBIR Phase II 2016 Department of DefenseArmy
  4. Battle Damage Assessment for Electronic Warfare Planning and Operation

    SBC: VADUM INC            Topic: A14065

    Vadum will develop a TRL 6 software module; Electronic Warfare Battle Damage Assessment Module (EW-BDA). The module will begin integration into the Electronic Warfare Planning and Management Tool (EWPMT) under development by Product Manager Electronic Warfare (PM EW) and Raytheon Space and Airborne Systems (SAS). Phase II integration will culminate with testing and demonstration of the module with ...

    SBIR Phase II 2016 Department of DefenseArmy
  5. Development of Biocompatible Dressings for the Delivery of Analgesics to Burn Wounds

    SBC: Keranetics, LLC            Topic: A14048

    This Phase II project is relevant to the medical product research goals of the Department of Defense given the prevalence of complex burn wounds that cause both acute and chronic pain. The current solution for burn-related pain is the administration of systemic opioid drugs, which have significant side effects and are highly addictive. A potential solution to this problem is localized, topical del ...

    SBIR Phase II 2016 Department of DefenseArmy
  6. LIFELINE

    SBC: RE2, INC.            Topic: A14053

    LIFELINE is a modular device that can be utilized by a single medic to increase efficiency of casualty extraction, getting both the medic and the casualty quickly out of harms way. The Phase I effort was highly successful in that it proved the feasibility of LIFELINE. The challenge of Phase I was designing a system that is quickly installed by one person, adapts to different S-MET vehicles, has th ...

    SBIR Phase II 2016 Department of DefenseArmy
  7. Hybrid Projectile Components Miniaturization

    SBC: KEYSTONE AUTOMATION, INC            Topic: A14084

    Under this SBIR initiative a completed flexible circuit based autopilot board will be designed, manufactured, tested, and verified to assure the end component meets all necessary technical specifications. This board will allow for control of surveillance/guided projectiles in the 40, 60, 81, and 120mm projectile systems.

    SBIR Phase II 2016 Department of DefenseArmy
  8. Investigation of Fiber Filled Injection Molding Materials for Thermoplastic Composite Missile Structures (MSC P4241)

    SBC: MATERIALS SCIENCES LLC            Topic: A11077

    Fiber reinforced thermoplastic matrix composites (TPMCs) have gained increased attention for use in high performance composite structures and components for aviation and missile applications due to significant benefits for improved damage tolerance, faster processing and assembly, reduced joint weight, virtually unlimited shelf life with minimal storage requirements, and recycling options.Despite ...

    SBIR Phase II 2016 Department of DefenseArmy
  9. Thermal Infrared Detection of Aerosolized Bacterial Spores

    SBC: MESH INC            Topic: A13098

    Protection of fixed sites from biological or chemical (CB) aerosol plume attacks depends on early warning and confirmatory evidence to provide time and information to take the appropriate mitigating actions. An effective sensing system requires continuous, autonomous, and rapid coverage of large surrounding areas. Most qualitative CB sensors used for identification purposes are too expensive or to ...

    SBIR Phase II 2016 Department of DefenseArmy
  10. A Process to Manufacture Propulsion Grade Functional Polybutadiene

    SBC: MACH I Inc.            Topic: NonDoD

    MACH I, Inc. successfully developed a process to produce a hydroxyl terminated polybutadiene (HTPB) polymer comparable to the existing commercial product Poly bd R-45M resin under a SBIR Phase II contract completed in 2013.This fact was confirmed through the completion of two commercial runs at a plant in Akron, Ohio and subsequent positive evaluation by propellant manufacturers.However, an additi ...

    SBIR Phase II 2016 Department of DefenseArmy
US Flag An Official Website of the United States Government