You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Holistic Health and Fitness Readiness Kit

    SBC: BURCHELL PROFESSIONAL GROUP, INC            Topic: A234005

    During phase 1 research an innovative, low cost, low maintenance, high strength, semi-portable infrastructure (building and foundation) for a Holistic Health and Fitness (H2F) Soldier Performance Fitness Center (SPFC) will be designed and developed in close cooperation with the Army's Technical Point of Contacts (TPOCs) during a 3 month Period of Performance (PoP). Burchell Professional Group Inc. ...

    SBIR Phase I 2023 Department of DefenseArmy
  2. XtruMach: Fixture-less Machining of Extruded Components

    SBC: FAIRMOUNT TECHNOLOGIES LLC            Topic: A19166

    Redacted

    SBIR Phase II 2023 Department of DefenseArmy
  3. Extended Durability Fuel Cells

    SBC: FC RENEW, LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  4. 3D Printed Composite Bio-Walls for Sustainable Construction

    SBC: BRANCH TECHNOLOGY, INC.            Topic: A234P014

    Redacted.

    SBIR Phase I 2023 Department of DefenseArmy
  5. Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems

    SBC: RESILIENT ENERGY & INFRASTRUCTURE, LLC            Topic: A224016

    Redacted.

    SBIR Phase II 2023 Department of DefenseArmy
  6. Extended Durability Fuel Cells

    SBC: FC RENEW, LLC            Topic: A224016

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  7. Clean onsite energy from organic, biomass, and plastic waste, to reduce greenhouse gas emissions and deliver renewable energy, improved resiliency, and cost savings to the U.S. Army.

    SBC: ENEXOR ENERGY, LLC            Topic: A224016

    Abstract The Enexor BioEnergy xTechSBIR Phase II project will demonstrate how the Enexor Bio-CHP, a modular, grid-independent, distributed renewable energy technology, will enable Army facilities to redirect organic and plastic waste from ending in landfills to generating onsite, 24/7 reliable, and affordable renewable power and thermal energy to meet the Army Climate Strategy’s (ACS) End State ...

    SBIR Phase II 2022 Department of DefenseArmy
  8. Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems

    SBC: RESILIENT ENERGY & INFRASTRUCTURE, LLC            Topic: A224016

    Redacted

    SBIR Phase I 2022 Department of DefenseArmy
  9. Stereo Line-Scan Camera System For Surface Distress Identification

    SBC: RENTEC LLC            Topic: A20BT017

    We are proposing a method to estimate 3D road surface dimensions by applying photogrammetric reconstruction techniques to images of a simulated road surface acquired using two, color line scan cameras.  Estimated 3D dimensions of road surfaces will be compared to laser profilometer measurements to confirm their accuracy and resolution. Data analytics will provide dimensional data sufficient for d ...

    STTR Phase I 2021 Department of DefenseArmy
  10. Uncooled Quantum Infrared Focal Plane Arrays

    SBC: ZENOLEAP LLC            Topic: A19123

    ZenoLeap LLC proposes to exploit its ongoing research and development of uncooled quantum infrared detectors, to enable the development of larger focal plane arrays (FPAs) based on this technology. This effort will build on ZenoLeap’s Phase I success in demonstrating high-speed quantum dots/graphene van der Waals heterostructures photodetectors with uncooled figure-of-merit detectivity D* up to ...

    SBIR Phase II 2021 Department of DefenseArmy
US Flag An Official Website of the United States Government