You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Holistic Health and Fitness Readiness Kit
SBC: BURCHELL PROFESSIONAL GROUP, INC Topic: A234005During phase 1 research an innovative, low cost, low maintenance, high strength, semi-portable infrastructure (building and foundation) for a Holistic Health and Fitness (H2F) Soldier Performance Fitness Center (SPFC) will be designed and developed in close cooperation with the Army's Technical Point of Contacts (TPOCs) during a 3 month Period of Performance (PoP). Burchell Professional Group Inc. ...
SBIR Phase I 2023 Department of DefenseArmy -
XtruMach: Fixture-less Machining of Extruded Components
SBC: FAIRMOUNT TECHNOLOGIES LLC Topic: A19166Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Extended Durability Fuel Cells
SBC: FC RENEW, LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
3D Printed Composite Bio-Walls for Sustainable Construction
SBC: BRANCH TECHNOLOGY, INC. Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems
SBC: RESILIENT ENERGY & INFRASTRUCTURE, LLC Topic: A224016Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Extended Durability Fuel Cells
SBC: FC RENEW, LLC Topic: A224016Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Clean onsite energy from organic, biomass, and plastic waste, to reduce greenhouse gas emissions and deliver renewable energy, improved resiliency, and cost savings to the U.S. Army.
SBC: ENEXOR ENERGY, LLC Topic: A224016Abstract The Enexor BioEnergy xTechSBIR Phase II project will demonstrate how the Enexor Bio-CHP, a modular, grid-independent, distributed renewable energy technology, will enable Army facilities to redirect organic and plastic waste from ending in landfills to generating onsite, 24/7 reliable, and affordable renewable power and thermal energy to meet the Army Climate Strategy’s (ACS) End State ...
SBIR Phase II 2022 Department of DefenseArmy -
Rapid Deployment Hybrid MicroGrid a Plug & Play Transportable Solar PV System-of-Systems
SBC: RESILIENT ENERGY & INFRASTRUCTURE, LLC Topic: A224016Redacted
SBIR Phase I 2022 Department of DefenseArmy -
Stereo Line-Scan Camera System For Surface Distress Identification
SBC: RENTEC LLC Topic: A20BT017We are proposing a method to estimate 3D road surface dimensions by applying photogrammetric reconstruction techniques to images of a simulated road surface acquired using two, color line scan cameras. Estimated 3D dimensions of road surfaces will be compared to laser profilometer measurements to confirm their accuracy and resolution. Data analytics will provide dimensional data sufficient for d ...
STTR Phase I 2021 Department of DefenseArmy -
Uncooled Quantum Infrared Focal Plane Arrays
SBC: ZENOLEAP LLC Topic: A19123ZenoLeap LLC proposes to exploit its ongoing research and development of uncooled quantum infrared detectors, to enable the development of larger focal plane arrays (FPAs) based on this technology. This effort will build on ZenoLeap’s Phase I success in demonstrating high-speed quantum dots/graphene van der Waals heterostructures photodetectors with uncooled figure-of-merit detectivity D* up to ...
SBIR Phase II 2021 Department of DefenseArmy