You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY23 is not expected to be complete until September, 2024.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase II 1996 Nuclear Regulatory Commission
  2. Inservice Diagnostics of Motor Operated Valves

    SBC: ACENTECH INCORPORATED            Topic: N/A

    N/A

    SBIR Phase I 1995 Nuclear Regulatory Commission
  3. OPERATOR-BASED METRIC FOR NUCLEAR OPERATIONS AUTOMATION ASSESSMENT

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: N/A

    THE OBJECTIVE OF THE PHASE I EFFORT IS TO DEVELOP, IMPLEMENT, AND EVALUATE AN OPERATOR-BASED METRIC FOR ASSESSING FUTURE CONTROL ROOM AUTOMATION SYSTEMS FOR COMMERCIAL NUCLEAR PLANT OPERATIONS. THE FOCUS WILL BE ON AUTOMATION'S IMPACT ON OPERATOR UNDERLOAD AND SITUATION AWARENESS (SA). THE APPROACH COMBINES AN OPERATOR/SYSTEM BEHAVIORAL REPRESENTATION IMPLEMENTEDIN SOFTWARE, WITH A PROCEDURAL METH ...

    SBIR Phase I 1993 Nuclear Regulatory Commission
  4. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    THE PROPOSED RESEARCH ADDRESSES THE APPLICATION OF ESI'S ENHANCED PARTICLE REMOVAL TO THE NON-DESTRUCTIVE DECONTAMINATION OF NUCLEAR EQUIPMENT. IN THIS PROCESS, THE PART TO BE CLEANED IS CONTACTED, UNDER CONDITIONS OF SHEAR, WITH A SOLUTION OF A HIGH MOLECULAR WEIGHT FLUOROCARBON SURFACTANT IN AN INERT PERFLUORINATED LIQUID. IT IS THEN RINSED WITH PERFLUORINATED LIQUID AND AIR DRIED. THE PERFLUORI ...

    SBIR Phase II 1993 Nuclear Regulatory Commission
  5. ENHANCED REMOVAL OF RADIOACTIVE PARTICLES BY FLUOROCARBON SURFACTANT SOLUTIONS

    SBC: Entropic Systems, Inc.            Topic: N/A

    N/A

    SBIR Phase I 1992 Nuclear Regulatory Commission
  6. ENHANCEMENT TO STEAM GENERATOR TUBING EDDY CURRENT INSPECTION BY APPLICATION OF THERMALLY INDUCED STRESSES

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    STEAM GENERATOR TUBES REPRESENT A UNIQUE PART OF THE REACTOR COOLANT SYSTEM (RCS). LEAKAGE FROM ANY OTHER PART OF THE RCS IS CAPTURED BY THE CONTAINMENT BUILDING, BUT STEAM GENERATOR TUBE LEAKAGE IS TRANSPORTED OUT OF THE CONTAINMENT BUILDING ALONG WITH THE STEAM, WHICH IS NORMALLY UNCONTAMINATED. STEAM GENERATOR TUBES, CONSEQUENTLY, DESERVE, AND RECEIVE SPECIAL CONSIDERATION. THE ASSURANCE OF STE ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  7. NONDESTRUCTIVE EXAMINATION TO DIRECTLY MEASURE STEAM GENERATOR TUBE U-BEND VIBRATORY RESPONSE

    SBC: FOSTER-MILLER, INC.            Topic: N/A

    ON FEBRUARY 9, 1991, AT THE MIHAMA UNIT 2 NUCLEAR POWER STATION, OPEARTED BY KANSAI ELECTRIC CORPORATION, A STEAM GENERATOR TUBE RUPTURED AND RELEASED APPROXIMATELY 9,000 GALLONS OF REACTOR COOLANT INTO THE SECONDARY SYSTEM. THE LEAKAGE CAUSED A RAPID DEPRESSURIZATION OF THE REACTOR COOLANT SYSTEM, WHICH RESULTED IN AN AUTOMATIC REACTOR TRIP AND ACTUATION OF THE HIGH PRESSURE SAFETY INJECTION SYST ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  8. DETECTION OF INCIPIENT CORROSION IN NUCLEAR POWER PLANTS

    SBC: MASSACHUSETTS TECHNOLOGICAL LABORATORY            Topic: N/A

    ACOUSTIC FIELDS CAN BE DESIGNED TO COAX LIQUID BORNE SUBMICRONIC PARTICLES TO ANNOUNCE THEIR PRESENCE LOUDER THAN THE USUAL SCATTERING SIGNALS WHICH ARE PRIMARILY DETERMINED BY THE DENSITY AND COMPRESSIBILITY CONTRAST BETWEEN THE PARTICLE MATERIAL AND THE HOST FLUID. WE EXPECT A SIGNAL ENHANCEMENT OF AT LEAST 60DB. THE KEY CONCEPT IS TO COAX THE PARTICLES TO SOFT CAVITATE AND DETECT THE ENSUING TR ...

    SBIR Phase I 1992 Nuclear Regulatory Commission
  9. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    THIS RESEARCH PROPOSAL DEALS WITH THE DEVELOPMENT OF A GAMMARAY DOSIMETER THAT IS BASED ON A SOLID STATE DETECTOR AND A MICROPROCERSSOR AND WILL DISPLAY THE DOSE AND DOSE RATE OF THE SKIN, AT A GIVEN DEPTH OF THE BODY OR THE BODY-AVERAGED DOSE, BY MEASURING THE SPECTRUM OF A RADIATION FIELD AND CALCULATING THE TISSUE EQAUIVALENT DOSE OF INTEREST. THE DETECTOR IS A PROPRIETARY DESIGN FEATURES OF TH ...

    SBIR Phase II 1991 Nuclear Regulatory Commission
  10. GAMMA RAY SPECTROMETER/DOSIMETER

    SBC: Applied Inventions Corp.            Topic: N/A

    N/A

    SBIR Phase I 1990 Nuclear Regulatory Commission
US Flag An Official Website of the United States Government