You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Integrated Ferrite Inductors and Transformers for Power Electronics with Ultra-low SWAP-C
SBC: WINCHESTER TECHNOLOGIES LLC Topic: A16020State-of-the-art power electronics use discrete components such as power magnetic inductors and transformers operating at < 1MHz, which suffer from a large SWAP-C (size, weight, power consumption, and cost). It has been challenging to achieve simultaneously high inductance, compact size, and high quality factors at 1~300MHz for integrated power electronics. In the completed Phase II Army STTR Phas ...
STTR Phase II 2023 Department of DefenseArmy -
Improved Technology to Treat Drug-Resistant Bacterial Infections
SBC: TRITON SYSTEMS, INC. Topic: A21CT010Bacterial infections are particularly significant for military personnel in situations where there may be a long delay between the injury and treatment at a hospital or clinic. The development of an effective, portable light-based system which can operate in both military hospitals and far-forward situations is proposed. The proof-of-concept prototype developed in Phase I will be refined to be mor ...
STTR Phase II 2023 Department of DefenseArmy -
Integrated Solution for Automatic Verification of Conformance of SOSA Modules and Waveforms Against Architectural Compliance Requirements
SBC: VISTOLOGY, INC. Topic: A19127Redacted
SBIR Phase II 2023 Department of DefenseArmy -
Computationally Driven Reliability & Repeatability for Wire Arc Additive Manufacturing of High Strength Maraging 250 Steel
SBC: SOLVUS GLOBAL LLC Topic: A21CT023Challenge: Reliable & repeatable production of large format, high performance components that are difficult to source using conventional casting and forging methods. We will Deliver: A physics-based modeling framework that enables reliable and repeatable large-format component-level production of high strength (>200 ksi) Maraging Steel produced via Wire-Arc Additive Manufacturing (WAAM). Proposal: ...
STTR Phase II 2023 Department of DefenseArmy -
Engineering optimization engine for reducing weight, complexity and embodied carbon in steel construction
SBC: QNECT LLC Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
High Temperature Carbon Capture with Molten Borates for Building Material Production
SBC: MANTEL CAPTURE, INC. Topic: A234P014Redacted.
SBIR Phase I 2023 Department of DefenseArmy -
HYDROS- Hybrid Diver Readiness Observation System
SBC: ALTEC, INC Topic: A234004Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Decoding Cognitive Fatigue: Leveraging EEG for Enhanced Soldier Performance and Biopotential Applications.
SBC: NEURABLE INC. Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
E?Textile Enabled Active Monitoring System (E?TEAMS)
SBC: VIVONICS INC Topic: A224025Redacted.
SBIR Phase II 2023 Department of DefenseArmy -
Hydrogen Generator
SBC: TRITON SYSTEMS, INC. Topic: A234012Redacted
SBIR Phase II 2023 Department of DefenseArmy