You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
ABAIS: Affect and Belief Adaptive Interface System
SBC: PSYCHOMETRIX ASSOCIATES, INC. Topic: N/ACurrently, the majority of decision-support systems assume normative performance and fail to adapt to individual differences. This is particularly true with respect to affective states and individual beliefs, which can have profound impact on performance, particularly in complex, crisis situations. We propose to develop an Affect and Belief Adaptive Interface System (ABAIS) capable of compensati ...
SBIR Phase I 1998 Department of DefenseAir Force -
ABSORBED DOSE MEASURMENTS USING POLYMER/GEL CHAMBERS
SBC: MGS RESEARCH INCORPORATED Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
ABUSE RESISTANT TRANSDERMAL BUPRENORPHINE FOR OPIATE
SBC: BIOTEK, INC. Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
A Catalytically Stabilized Lean Direct Injection Combustor for Advanced Subsonic Technology Emissions Reduction
SBC: PRECISION COMBUSTION, INC. Topic: N/AN/A
SBIR Phase I 1998 National Aeronautics and Space Administration -
ACNE TREATMENT WITH PHOTOTHERMOLYSIS OF SEBACEOUS GLANDS
SBC: Cynosure, Inc. Topic: N/AN/A
SBIR Phase I 1998 Department of Health and Human Services -
A Compact, Portable, Reduced-Cost, Gamma Ray Spectroscopic System for Nuclear Verification
SBC: Spire Corporation Topic: N/AA Compact, Portable, Reduced-Cost, Gamma Ray Spectroscopic System for Nuclear Verification DOE Grant No. DE-FG02-98ER86083 Amount: $99,980 Small Business Spire Corporation One Patriots Park Bedford, MA 01730-2343 Dr. Rengarajan Sudharsanan, Principal Investigator Mr. Richard S. Gregorio, Business Official (781) 275-6000 Research Institution Lawrence Livermore National Laboratory 7000 East Av ...
STTR Phase I 1998 Department of Energy -
A Correlated-k Plume Radiative Transfer Code
SBC: SPECTRAL SCIENCES, INC Topic: N/AAccurate modeling of radiation from rocket plumes is critical for remote sensing simulations and assessing vehicle base heating. Current computer models use approximate radiative transfer and computational methods that were developed 20-30 years ago. A unified, general, and accurate approach for rocket plume radiation is needed that takes advantage of rapid advances in computer speed and paralle ...
SBIR Phase I 1998 Department of DefenseAir Force -
A Cryogenic Refrigeration System for Superconducting Generators
SBC: ENERGEN, INC. Topic: N/ASuperconducting rotating machinery has been proposed as a means of achieving greater efficiency in electrical power generation and utilization. Furthermore, superconducting generators and motors have the potential to be more compact thereby increasing the flexibility of system designs as well as potentially reducing manufacturing costs. However, commercialization of this technology is gated by the ...
SBIR Phase I 1998 Department of DefenseMissile Defense Agency -
Active Combustion Control Using Micro-Fabricated Sensors and Actuators
SBC: PHYSICAL SCIENCES INC. Topic: N/AN/A
SBIR Phase I 1998 National Aeronautics and Space Administration -
Adaptive Antenna Array for Radar Cross Section (RCS) Measurement
SBC: ARCON CORP Topic: N/AARCON Corporation proposes a number of cost-effective improvements for measuring low RCS targets on the USAF RATSCAT RCS measurement ranges. These improvements include hardware modifications and intelligent adaptive software to improve measurement accuracy while controlling costs by keeping most of the present reflector systems. Specifically, we address the problem of pylon reflections, illuminat ...
SBIR Phase I 1998 Department of DefenseAir Force