You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Satellite Operator Decision Aid And Training System (SODATS)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    In response to Small Business Innovative Research solicitation AF01-053, 21CSI is pleased to propose the development of a proof-of-concept software decision aid for satellite command composition. Our decision aid, the Satellite Operator Decision Aid andTraining System (SODATS), will be built from the bottom up to support both operator training and operational usage. It will employ intelligent agen ...

    SBIR Phase I 2001 Department of DefenseAir Force
  2. Shoot & Scoot Assistant

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    A military combat unit must

    SBIR Phase I 2001 Department of DefenseArmy
  3. Tasking, Processing, Exploitation, and Dissemination (TPED)-Knowledge Acquisition and Assessment System (KAAS)

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    In response to Small Business Innovative Research solicitation OSD01-CR10, 21CSI is pleased to propose the development of a proof-of-concept software knowledge assessment tool for TPED teams. Our assessment tool, the TPED Knowledge Acquisition andAssessment System (TPED-KAAS), will be built from the bottom up to support TPED team assessment and training. The heart of this system will be a unique ...

    SBIR Phase I 2001 Department of DefenseAir Force
  4. Agents and Avatars in the Aerospace Operations Center in Support of Combat Operations

    SBC: 21ST CENTURY SYSTEMS, INC.            Topic: N/A

    For efficient space operations, and for effective space force enhancement to terrestrial forces, Aerospace Operations Center (AOC) personnel must be continuously aware of the status of on-orbit assets, payload coverage, reacting to system degradations andfailures, and responding to intolerant environments for satellites. To complete the situational awareness picture, there is also the need to depi ...

    SBIR Phase I 2001 Department of DefenseAir Force
  5. Pediatrician ADHD Media Support Package for Parents

    SBC: ACADEMIC EDGE, INC.            Topic: N/A

    DESCRIPTION (provided by applicant): Children with ADHD are at significant risk for failing to complete high school and as many as 25 percent develop chronic patterns of antisocial behavior that persist into adulthood. Primary care providers--the practitioners who evaluate and treat the vast majority of children with ADHD--often fail to uti ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  6. Classroom Support of ADHD Social Skills Development

    SBC: ACADEMIC EDGE, INC.            Topic: N/A

    The purpose of this project is to design, develop, and evaluate an Intergrated Media Intervention (IMI) that will assist teachers, school counselors, group facilitators and related personnel to foster the development of age-appropriate social problem-solving skills by children and adolescents with disruptive behavior disorders such as ADHD, ODD, and CD. The IMI is a package of classroom implement ...

    SBIR Phase I 2001 Department of Health and Human ServicesNational Institutes of Health
  7. Intelligent Control For Autonomous Remote Spacecraft

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    We will apply the latest knowledge in learning control, adaptive control, and optimal control to develop a modular, state-of-the-art, adaptive, nonlinear, guidance, navigation, and control package for remote spacecraft. The system will incorporate planning and decision making modules to give the remote spacecraft on-line goal directed self-reliant behavior with a high degree of autonomy. At the hi ...

    STTR Phase I 2001 National Aeronautics and Space Administration
  8. MagLev Launch Propulsion for LoFLYTE¿Waverider Unmanned Aerial Vehicle

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Accurate Automation, teamed with PRT Advanced Maglev Systems, will work together to perform flight test experiments for launching the LoFLYTE¿ UAV from NASA Marshall Space Flight Center¿s 100-foot outdoor Maglev track. The goal of the Phase I program is to lay the foundation for a Phase II flight test program that will demonstrate the use of the Maglev track to launch a hypersonic configuration ...

    SBIR Phase I 2001 National Aeronautics and Space Administration
  9. Development of Radio Frequency Mitigation Technologies for Missile Defense Electronics

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Accurate Automation Corporation is proposing the development of a plasma limiter for the protection of sensing electronic equipment from high power EM radiation. The Limiter is essentially a self-breaking, fine-point, electrode placed within the receivingtransmission line. In Phase I, AAC will begin development and testing of the concept in an S-band resonant ring located at Texas Tech University. ...

    SBIR Phase I 2001 Department of DefenseArmy
  10. Enhanced Turbojet Inlet Injection

    SBC: ACCURATE AUTOMATION CORPORATION            Topic: N/A

    Accurate Automation Corporation (AAC) proposes to develop an analytical andexperimental database that demonstrates the basic feasibility of inlet injection ofoxidizer in turbojet engines for turbojet acceleration. This will enable operation ofconventional turbojets to higher Mach numbers, to higher speeds, and to higheraltitudes than they are current capable. This is a step in using the nation'si ...

    SBIR Phase I 2001 Department of DefenseDefense Advanced Research Projects Agency
US Flag An Official Website of the United States Government