You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
STEWARD: Sensor Technologies for Enhancing Workplace Awareness through Remote Discernment
SBC: APTIMA INC Topic: DLA162001Warehouse injuries and accidents are occurring much too frequently and resulting in devastating consequences and implications for the involved facility. Although the recent emergence of low-cost and unobtrusive sensor technologies have flooded nearly every market to improve health and safety, the warehousing and manufacturing markets have remained largely unpenetrated. Aptima plans to fill this ga ...
SBIR Phase I 2017 Department of DefenseDefense Logistics Agency -
The Property Reuse and Disposition Tool
SBC: Technology Solutions Experts, Inc. Topic: DLA162003Technology Solutions Experts, Inc. (TSE) is proposing to develop the Property Reuse and Disposition Tool, a mobile app that will significantly expedite and facilitate the way in which the Defense Logistics Agency (DLA) catalogs excess property for its reuse.The DLA's current process of cataloging excess property is cumbersome and tedious--with the advent and proliferation of mobile technologies, t ...
SBIR Phase I 2017 Department of DefenseDefense Logistics Agency -
D2R: A Mobile App for Efficient Disposition to Reutilization
SBC: Intelligent Automation, Inc. Topic: DLA162003DLA Disposition Services is responsible for the disposal of excess DOD personal property, foreign excess personal property, scrap, hazardous waste, and property requiring demilitarization. DLA Disposition Services also offers reutilization and public sales to military, federal, state and local agencies, non-profit agencies, and US taxpayers through a marketplace. In the current process, the user d ...
SBIR Phase I 2017 Department of DefenseDefense Logistics Agency -
Low‐Latency High‐reliability Wireless Protocol for Advanced Manufacturing Applications
SBC: INFOBEYOND TECHNOLOGY LLC Topic: NAAdvanced manufacture requires low-latency and high-reliability wireless communications between the sensors/actuators and the central controller. However, the current wireless protocols cannot meet such stringent latency and reliability requirements. In this project, InfoBeyond advocates L2Wireless (Low-Latency High-reliability Wireless Protocol Using Cooperative Relaying and Network Coding) to add ...
SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology -
3-D Digital Image Correlation Based Non-Destructive Testing System for Qualification of Additive Manufacturing Parts
SBC: X-Wave Innovations, Inc. Topic: NANIST's seeks a high resolution DIC technology for qualification of complex AM parts. To meet this critical need, X-wave Innovations Inc. proposes to develop a 3-Dimentional Digital Image Correlation (3-D DIC) based NDT system. The proposed effort builds upon the success of XII in developing a variety of NDT technologies (including DIC system) for advanced materials evaluation. The success of the p ...
SBIR Phase I 2017 Department of CommerceNational Institute of Standards and Technology -
High-Throughput Single-Nanoparticle Magnetic Analysis Platform Using Diamond Magnetic Imaging
SBC: Quantum Diamond Technologies Inc Topic: NAMagnetic nanoparticles are widely-used tools over a range of industries, but have particularly powerful biomedical applications for clinical and research diagnostics, clinical therapy, and basic life science research. Many of these applications require consistent sources for magnetic nanoparticles with narrow distributions of magnetic properties, but no technology is now commercially available for ...
SBIR Phase II 2017 Department of CommerceNational Institute of Standards and Technology -
Cyberchase Fractions Quest
SBC: FABLE VISION, INC. Topic: EDIES17R0006The final product is Cyberchase Fractions Quest—a math game based on the storyline of PBS children's television series, Cyberchase. In the game, students in grades 3 and 4 will apply learning fractions within three contexts: areas and regions (such as shapes), sets (groups of objects), and on a number line. The game will identify specific areas where students struggle and will introduce challeng ...
SBIR Phase II 2017 Department of EducationInstitute of Education Sciences -
Determining Students' Academic Engagement while Completing Learning Activities and Assessments
SBC: Tutorgen, Inc. Topic: edIES15R0005With this Phase I funding, the project team will develop and test a prototype of D-TECH, a system to determine students' level of academic engagement while completing computer-based learning activities and assessments. The prototype will integrate within existing third party computer-based programs (e.g., online courseware, educational games, simulations, intelligent tutors) and will consist of a ...
SBIR Phase I 2017 Department of EducationInstitute of Education Sciences -
Metrology of thin films on sapphire substrate
SBC: OPTOWARES INC Topic: DMEA16B001There is a lack of non-destructive metrology tool to measure the thickness of thin films on sapphire substrate due to the transparency of the
STTR Phase I 2017 Department of DefenseDefense Microelectronics Activity -
Ceramic Additive Manufacturing for Metal Castings
SBC: TECHNOLOGY ASSESSMENT AND TRANSFER, INC. Topic: DLA152003Additive manufacturing of integrally cored ceramic molds promises substantial cost savings and much shorter development cycles for the cooled blades and vanes of the high pressure turbine section of aircraft engines. AM directly prints the ceramic mold and core as a monolithic body, thereby eliminating the major steps of ceramic core and wax pattern fabrication. Based on a cost analysis conducte ...
SBIR Phase II 2017 Department of DefenseDefense Logistics Agency