You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
High-Bandwidth, Large stroke actuator fro active control applications
SBC: Active Control eXperts, Inc. Topic: N/AActive Control eXperts, Inc. (ACX) proposes to apply its expertise in actuator and control system design to high force, high bandwidth machine tool position control applications. ACX proposes to develop novel hybrid linear actuators which can operate at high loads (greater than 1000 lbs.) at high bandwidths (in excess of 200 Hz), and at high displacements (0.018 inches). This innovative solid-stat ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
High Resolution X-Ray Imaging Sensor for Real Time Nondestructive
SBC: RADIATION MONITORING DEVICES, INC. Topic: N/AN/A
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Photonic Radar Systems
SBC: Anro Engineering, Inc. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseDefense Advanced Research Projects Agency -
Halogen-Assisted Diamond Deposition in a Microwave Plasma Reactor
SBC: Applied Science and Technology,LLC Topic: N/AN/A
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Innovative Approaches to the Design of Visually Covert Low Power, Low Gain Antennas In The Range of 2-2000 MHz
SBC: ASTRON WIRELESS TECHNOLIGIES, INC. Topic: N/AAstron Corporation proposes to integrate supportability low profile covert antenna system requirements to cover a frequency span of 2 - 2000 MHz within two multi mobile platforms which will adapt to various transportable applications. The specific objectives of the Phase I effort are: a. OBJECTIVE 1 -Initiate a Preliminary Design Review meeting to identify and define the contractual requirements. ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
High Performance Video Compression for Narrow Band Channels
SBC: Aware, Inc. Topic: N/AThis project will develop and demonstrate a design for a wavelet-based compression system that will support the tranmission of video and still data bia UHF satellite communication channels and twisted-pair cuircuits. The system will feature real-time teleconferecing and the ability to rapidly transmit still imagery and video material at user selectable quality levels. The project will focus on eng ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Image Representative and Retrieval Using Image Context Vectors
SBC: Belmont Research, Inc. Topic: N/AThe burgeoning growth of image and video databases demands fast and effecitve methods for representing and searching image collections. Most current approaches depend upon labeling images with text keywords. Manual labeling is labor-intensive and difficult, because one must predict which parts of an image will be of future interest, as well as what query terms will be used for the retrieval. This ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Hi-C++: An Object-oriented Programming Environment For High Performance Platforms
SBC: Cooperating Systems Corp Topic: N/AThis research project uses object-oriented technology to enable the creation of production quality commercial software for high performance computing (HPC) hardware. Primary concerns include ease of use, platform flexibility, and high performance. The investigation focuses on a C++ programming environment, called Hi-C++, scalable and portable over a variety of HPC platforms ranging from workstatio ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
High Voltage "Supercapacitors" Phase II
SBC: COVALENT ASSOC., INC. Topic: N/AThe need for environmentally clean sources of energy for vehicular propulsion is driving a worldwide effort to develop high energy density "supercapacitors". These electronic devices are expected to work in tandem with advanced batteries or fuel cells to provide burst power required for acceleration and hill climbing. In order to greatly increase the double layer capacitance of carbonaceous electr ...
SBIR Phase II 1995 Department of DefenseDefense Advanced Research Projects Agency -
Modeling Kernel to Support Collaborative Concurrent Engineering
SBC: CRYSTALIZ, INC. Topic: N/AN/A
SBIR Phase I 1995 Department of DefenseDefense Advanced Research Projects Agency