You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Manufacturing Optimization of High-Actuator-Count Deformable Mirrors for Mirror Quality and Actuator Yield Assurance
SBC: Microscale, Inc. Topic: S2This SBIR Phase I project aims to improve the mirror quality of thenbsp;PZT stack actuator DMs. With verified DM performance in terms of key performance parameters such as stroke, leakage current, speed, influence function as well asnbsp;the validity of the superposition law in the DM control, the innovation further strives to optimize the manufacturing processnbsp;to ultimately improve the mirror ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Space Boot Binding System for Surface Missions
SBC: INNOVATIVE AEROSPACE LLC Topic: H4The Space Suit Boot Binding System for Surface Missions supports the next generation space suit. The crew dons a snug fitting Inner Boot, and slides it through the xPGS Leg Assembly toward the attached Outer Boot. Two spring loaded pins integrated into the Inner Boot Sole Plate (IBSP), inboard of the crewrsquo;s toes, mate with receiving bushings on the Outer Boot Sole Plate (OBSP). The crew press ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Passsive UV Imaging Polarimeter For Atmospheric Studies
SBC: Optical Coating Solutions, Inc. Topic: S1A new UV imaging polarimeter design was demonstrated by Optical Coating Solutions, Inc. (OCS) as a proof-of-concept breadboard in a 2016 Phase I effort (NASA Contract NNX16CA44P). A version of that generic design is proposed for atmospheric studies in a follow-on effort.nbsp;The new polarimeter design can operate to wavelengths as short as 260nm and does not employ electronic or mechanical modulat ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Low Noise Miniature IMU for Harsh Space Environment
SBC: Infibertech, Corp, Topic: S3In this proposal we will develop key enabling components of, environmentally ruggedized, smaller size, radiation hardened and higher precision inertial navigations sensors.nbsp; Such sensors are necessary for various future NASA applications. These applications include scientific exploration of earth, the planets, moons, comets, and asteroids of our solar system using smaller and lower cost spacec ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Imaging Quality Microchannel Plates for UV-VIS Spectrometers
SBC: INCOM, INC. Topic: S1We propose to demonstrate feasibility for new glass capillary array (GCA) manufacturing techniques for making large format (ge;100 times; 100 mm2) imaging quality microchannel plate (MCP) electron amplifiers. MCPs are generally accepted to be essential components in low-noise, high-sensitivity photonic imagers. Incom#39;s ALD-GCA-MCP technology offers several advantages for space-based imaging ove ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Solar Concentrator System for Lunar ISRU Applications
SBC: PHYSICAL SCIENCES INC. Topic: Z12Physical Sciences Inc. (PSI) proposes to develop a solar concentrator system for lunar In-Situ Resource Utilization (ISRU) applications. In this system solar radiation is collected using a concentrator array which transfers the concentrated solar radiation to the optical waveguide (OW) transmission line made of low loss optical fibers. The OW transmission line directs the solar radiation to the th ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
High Energy Density and High Cycle Life Lithium-Sulfur Battery For Electrified Aircraft Propulsion
SBC: GINER INC Topic: A1A high cycle life and high energy density rechargeable battery will address an important growing demand for safe, efficient, low-cost, environmentally sustainable air transportation. These advances will enable ldquo;thin-haulrdquo; aircraft with low-carbon propulsion systems that provide low-cost passenger and package transportation. Advances in electrified aircraft propulsion (EAP) will also intr ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
Compact High Impulse Electrospray Thrusters for Large Observatory Precision Pointing
SBC: BUSEK CO., INC. Topic: Z10Busek proposes to develop a versatile, high-impulse precision pointing attitude-control actuator evolved from now flight-proven electrospray propulsion technology. The proposed system would support unprecedented thrust dynamic range while virtually eliminating reaction wheel vibrational jitter and associated complications.nbsp;Numerous past and upcoming precision observatory missions have recogniz ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
High Temperature Nozzle Seals for Dissimilar Materials
SBC: PHYSICAL SCIENCES INC. Topic: Z7High-performance, lightweight nozzles and combustion chambers are a core technology need for upper-stage and planetary descent/ascent rocket engines. Future NASA missions to Moon and Mars require reduced weight in combustion chambers and nozzles so that overall mission payload fraction and cost can be improved. Ceramic Matrix Composite (CMC) nozzle extensions are a way to reduce weight and improve ...
SBIR Phase I 2019 National Aeronautics and Space Administration -
V-Band Switch (65-70 GHz)
SBC: MILLIMETER WAVE SYSTEMS LLC Topic: S1Surface Level Pressure measurements will greatly improve hurricane forecasts (intensification and track predictions) and provide direct measurement of fundamental meteorological dynamics using instruments such as differential absorption radar.nbsp; A critical component is the TX/RX duplexing switch that must be low loss (lt;0.5dB), high isolation (gt;35dB) and power handling of 2W.nbsp; The low lo ...
SBIR Phase I 2019 National Aeronautics and Space Administration