You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Stress and Geometry Imaging from Outside the Pipeline
SBC: JENTEK SENSORS, INC. Topic: 111PH1There is a well defined, yet unfulfilled need for a convenient (non-contact, light weight) and rapid imaging tool for multi-directional, thru-wall stresses (both applied and residual) from the outside of a pipeline. Quantitative stress imaging is needed at mechanical damage and corrosion sites, as well as at other critical locations (dents, bends, etc.). JENTEK is uniquely positioned to deliver ...
SBIR Phase I 2011 Department of Transportation -
A Multi-Pedestrian Counting System Using Fusion of Stereo Camera and Laser Scanner
SBC: Migma Systems Inc. Topic: 091FH4In Phase I, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner were selected for use. We have demonstrated that our pedestrian counting system can count multiple pedestrians walking in a large group, maintain individual tracks even when some pedestrians walk in unpredictable patterns or leave the crosswalk prematur ...
SBIR Phase II 2011 Department of Transportation -
Solar Roadways
SBC: SOLAR ROADWAYS INCORPORATED Topic: 091FH5As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. In addition, the surface of the pavement is typically impermeable, causing negative consequences. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with m ...
SBIR Phase II 2011 Department of Transportation -
Helicopter Hostile Fire Indication Sensor
SBC: Agiltron Development Corporation Topic: SOCOM11001Agiltron Development Corp. will develop the world"s first affordable, reliable and accurate Helicopter Hostile Fire Indicator Sensor capable of detecting small arms through rocket propelled grenade threats using Agiltron"s unique photomechanical, uncooled infrared sensor. In phase one, Agiltron will construct a test sensor system and conduct field tests to determine detection range, accuracy and f ...
SBIR Phase I 2011 Department of DefenseSpecial Operations Command -
Tailorable Accurate Blood Simulant (TABS)
SBC: Infoscitex Corporation Topic: OSD10H01Many blood simulants that are currently available for medical training to teach and practice hemorrhage-handling skills lack the ability approximate real blood in many aspects. In order to provide the best training, the blood simulant needs to mimic the
SBIR Phase I 2011 Department of DefenseDefense Health Agency -
Nano-Structured Spatiotemporally Controlled Delivery System that Promotes Functional Tissue Regeneration
SBC: Infoscitex Corporation Topic: OSD10H03There is a substantial clinical need for regenerative therapies that effectively restore function to damaged tissues. For many tissues, autograft remains the clinical standard despite the limited volume available, associated patient morbidity and the resu
SBIR Phase I 2011 Department of DefenseDefense Health Agency -
Deployable Automated Analgesia and Anesthesia System
SBC: VIVONICS INC Topic: OSD10H05An automated, closed loop system for administration of analgesic and anesthetic medication to patients is proposed. Even with vigilant, trained personnel, infusion rates of propofol and other analgesic/anesthetic drugs can depart from their optimum rates,
SBIR Phase I 2011 Department of DefenseDefense Health Agency -
Deployable Remotely Enabled Analgesia Management System
SBC: Etiometry Inc. Topic: OSD10H05Sterling Point Research has assembled an interdisciplinary team composed of researchers from Children"s Hospital Boston and Boston University, an anesthesiologist, and a former U.S. Army medic to develop a Deployable Remotely Enabled Analgesia Management
SBIR Phase I 2011 Department of DefenseDefense Health Agency -
Haptics for Medical Simulation (HAMS)
SBC: CHARLES RIVER ANALYTICS, INC. Topic: OSD10H06Minimally invasive surgery (MIS), including laparoscopic surgery (LS), is beneficial in terms of the improved recovery of the patient, including shorter convalescence times, less postoperative pain, and less scarring. Training surgeons in these new techni
SBIR Phase I 2011 Department of DefenseDefense Health Agency -
THEO: Tactile and Haptics Enabled Open Surgery Simulator
SBC: Infoscitex Corporation Topic: OSD10H06The field of surgical simulation is fairly crowded with many products and research groups developing physical and virtual simulators. Much of this previous work is in simulating minimally invasive surgeries. The considerable body of work generated in de
SBIR Phase I 2011 Department of DefenseDefense Health Agency