You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Real Time Thermal Mapping Techniques for Elastomeric Track Components

    SBC: Templeman Automation, LLC            Topic: A10137

    Acquisition of accurate, real-time measurements of track component temperatures is necessary for establishing the requirements for improved parts and materials. To support this, Templeman Automation LLC. (TA) has developed its Wireless Track Temperature Monitoring (WTTM) system using embedded, battery-free RFID sensor chips. WTTM uniquely combines industry-proven miniature RFID sensor chip technol ...

    SBIR Phase II 2011 Department of DefenseArmy
  2. Solid State Transcutaneous Carbon Dioxide Sensor

    SBC: GINER INC            Topic: A09159

    The United States Army (The Army) has identified the need for a device that can accurately and non-invasively measure the partial pressure of carbon dioxide (PCO2) that is suitable for use in combat casualties who have hypovolemic shock, acute lung injury, massive resuscitation, and other factors that alter the exhaled or end-tidal CO2 (ETCO2)-PCO2 relationship. In this Phase II program, Giner, In ...

    SBIR Phase II 2011 Department of DefenseArmy
  3. Enhanced IED Detection Using Ontological Knowledgebase with Fuzzy Reasoning

    SBC: Migma Systems Inc.            Topic: A09078

    In Phase I, we have developed a suite of algorithms with capabilities including anomaly detection, false alarm mitigator, intelligent target grouping for minefield display to the human operator, and minefield detection. An ontological knowledgebase has also be developed, which provides a unified environment for the operation and coordination of individual algorithm modules. Test results using actu ...

    SBIR Phase II 2011 Department of DefenseArmy
  4. Next-Generation, LED-based, Adjustable Spectrum, Pulsed Solar Simulator

    SBC: Spire Corporation            Topic: 02a

    Solar simulators are needed for measuring the performance of solar cells and solar panels. These instruments currently use filtered high-intensity xenon lamps with poor spectral control, high voltage transients that can adversely affect electronic control circuits, lamp aging and a lack of easily-implemented size scaling. What is needed is a more reliable, low-voltage solid-state, spectrum-adjus ...

    SBIR Phase II 2011 Department of Energy
  5. Photoluminescense for Solar Cell Crack Detection

    SBC: Spire Corporation            Topic: 02b

    In the manufacturing process for photovoltaic (PV) cells and modules, a significant percentage of crystalline silicon wafers and solar cells contain microcracks that are difficult or impossible to detect with the human eye or currently available machine vision systems. These microcracks can propagate through the cells, resulting in power loss and cell breakage, due to mechanical and thermal stres ...

    SBIR Phase II 2011 Department of Energy
  6. Components for Heating and Fueling of Fusion Plasmas

    SBC: DIVERSIFIED TECHNOLOGIES, INC.            Topic: 67b

    Next generation fusion facilities will require many megawatts of RF power from dozens of gyrotrons. Conventional DC power systems, built from WWII era components, have provided the typical approach to powering high-power RF vacuum devices for the last 50 years. Typically, they suffer from reliability and availability problems, and are often only 50 70% efficient. Scaling these conventional RF pow ...

    SBIR Phase II 2011 Department of Energy
  7. Marx Modulator Optimization for Advanced Accelerators

    SBC: DIVERSIFIED TECHNOLOGIES, INC.            Topic: 65d

    The next generation of particle accelerators will require large numbers of RF cavities, producing field gradients undreamt of a dozen years ago. The next frontier is high energy, short pulse modulators, continuing the technical thrust begun under recent colliders and numerous X-Band accelerator designs. Modulators to drive the klystrons for these new accelerators must meet aggressive requirements ...

    SBIR Phase II 2011 Department of Energy
  8. High Strength Silver Sheath for Bi2212/Ag Conductor

    SBC: Supercon, Inc.            Topic: 62a

    This proposal describes an innovative high strength silver alloy for making Bi2212/Ag round wire conductor. To generate magnetic fields greater than 20 T, a new high field superconductor such as Bi2212 is needed. However, Bi2212 is brittle ceramic that can be easily damaged, and its critical current is very strain sensitive. The Bi2212 compound is contained in a silver matrix that is chemically co ...

    SBIR Phase II 2011 Department of Energy
  9. Efficient manufacture of extreme surface area Microchannel plate devices functionalized by atomic layer deposition thin films

    SBC: ARRADIANCE LLC            Topic: 61a

    The work proposed in this SBIR proposal is is synergistic with the, DOE funded, basic R & amp;D effort of a consortium of national laboratories, universities, and industry, led by Argonne National Laboratory and the University of Chicago for the development of new, large area, photodetector devices. This project proposes to address the commercialization gap that exists between the proofofprinciple ...

    SBIR Phase II 2011 Department of Energy
  10. Manufacturing of Large and Highly Transparent Aerogel Tiles with Refraction Indices up to 1.1 for Cherenkov Detectors

    SBC: ASPEN AEROGELS, INC.            Topic: 46d

    Aerogels with low refractive index and high light transmittance are highly desirable for Cherenkov detectors in high-energy particle physics. However, the quality, cost, and scale of the manufactured aerogels have been a challenge for this field. Over the past 10 years, Aspen Aerogels has gained considerable expertise fabricating highly hydrophobic transparent aerogels. On the proposed effort, Asp ...

    SBIR Phase II 2011 Department of Energy
US Flag An Official Website of the United States Government