You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
STEM Solar Explorations
SBC: Diversified Painting & CO Topic: N/APurpose: The need for all students to be well prepared in science has been well documented. The purpose of this project is to develop a solar learning lab platform to apply learning in the area of energy science. Project Activities: The researchers will design curricula materials, multi-media video clips, lesson plans, student activities, assessments, and a back-end system to house data generated ...
SBIR Phase II 2012 Department of Education -
Software to Compute Effect Sizes for Cluster-Randomized Trials
SBC: Biostatistical Programming Associates, Inc. Topic: N/APurpose: In education research, the standardized mean difference (symbolized by d) is the predominant effect size index. It is calculated as the difference between the treatment-group and control-group means, divided by the pooled standard deviation. Using d allows the impacts of education interventions to be compared even when they have been evaluated using different measures or study designs. Ca ...
SBIR Phase II 2012 Department of Education -
Socket Pressure Monitoring System
SBC: LIBERATING TECHNOLOGIES INC Topic: 84133S1The goal of this Phase 1 project is to identify changes in residual limb volume in amputees and to warn the user when these changes may lead to potential problems. One cause of residual limb pain in amputees is improper prosthetic socket fit, causing a range of mild to unbearable pressures. Residual limbs can change shape over long timeframes which can change the interface between the socket and s ...
SBIR Phase I 2012 Department of Education -
The Intelligent Brace: A Compliance Monitoring System for Scoliosis
SBC: LIBERATING TECHNOLOGIES INC Topic: 84133S1The goal of this project is to provide real-time monitoring and data logging to help both the patient and clinician determine if and when a scoliosis brace is being worn effectively. Despite widespread use of bracing for treatment of scoliosis, its efficacy remains unproven. Studies have indicated that user compliance is a large factor in the efficacy of scoliosis brace treatment. Two factors comp ...
SBIR Phase I 2012 Department of Education -
Short-Wave-Infrared (SWIR) Night Glow Photon-Counting Integrated Circuit (PCIC) Focal Plane Array (FPA) Detectors and Night Vision Cameras
SBC: Wavefront Topic: SOCOM12002Almost all intelligence, surveillance, and reconnaissance (ISR) platforms and all small agile munitions need high-sensitivity night vision imagers for situational awareness and for target identification, tracking and discrimination. The requirements of situational awareness, responsiveness and weapon precision are ever more stringent in current and future urban warfare, where minimum collateral da ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Facial Signature Reduction
SBC: Bambu Vault LLC Topic: SOCOM12004Reducing the personal signature of the warfighter, while simultaneously allowing him to"see, breathe and hear"is critical to mission success. Methods of concealment that are suitable for the body do not adequately mask the face without hindering the ability to"see, breathe and hear". To address the need for reducing signature in the Visible and NIR/SWIR region Performance Indicator, LLC (PI) pro ...
SBIR Phase I 2012 Department of DefenseSpecial Operations Command -
Readorium Software for Improved Reading Comprehension of Non-fiction Science Text
SBC: Mtelegence Corporation Topic: N/APurpose: Prior research indicates that reading difficulties in childhood become more problematic as students move to middle and high school where increasingly challenging material must be learned. Although some older students still struggle with decoding, many more have difficulty constructing meaning from text. Despite research that has identified strategies for teaching students to comprehend wh ...
SBIR Phase II 2011 Department of Education -
STEM Solar Explorations
SBC: Diversified Painting & CO Topic: N/APurpose: The need for all students to be well prepared in science has been well documented. The purpose of this project is to develop a solar learning lab platform to apply learning in the area of energy science. Project Activities: The researchers will design curricula materials, multi-media video clips, lesson plans, student activities, assessments, and a back-end system to house data generated ...
SBIR Phase I 2011 Department of Education -
Software to Compute Effect Sizes for Cluster-Randomized Trials
SBC: Biostatistical Programming Associates, Inc. Topic: N/APurpose: In education research, the standardized mean difference (symbolized by d) is the predominant effect size index. It is calculated as the difference between the treatment-group and control-group means, divided by the pooled standard deviation. Using d allows the impacts of education interventions to be compared even when they have been evaluated using different measures or study designs. Ca ...
SBIR Phase I 2011 Department of Education -
Foot Operated Mouse for the Disability Market
SBC: Beckmer Products Inc./Dental R.A.T. LLC Topic: 84133S1This project designs, develops, and markets a foot-operated mouse that builds upon patented Dental R.A.T. technology. The foot mouse is designed to allow efficient hands-free access to all computer functions and is compatible with all operating systems/software. This foot mouse requires no special software, programming, or training. It has accurate cursor control and left/right mouse click capabil ...
SBIR Phase I 2011 Department of Education