You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. Multimodal Alerting Interface with Networked Short-range Transmissions (MAIN-ST)

    SBC: CHARLES RIVER ANALYTICS, INC.            Topic: 161FH2

    The connected vehicles program is a multimodal U.S. DOT initiative that uses a dedicated wireless communication technology to enable safer, smarter, and greener surface transportation. While significant efforts are being made to bring motor vehicles and transportation infrastructure onto this connected network, bicycles have been largely overlooked. As a result, a significant need exists to bring ...

    SBIR Phase I 2016 Department of Transportation
  2. Pedestrian Detection, Counting and Tracking Systems for Travel Surveys, Traffic Safety Systems and Traffic Control Systems

    SBC: Migma Systems Inc.            Topic: 091FH4

    In Phase II, we developed a new system for pedestrian detection, tracking and counting. In this system, both IR LED stereo camera and laser scanner are selected for use. This Phase II system was field-tested at a few cities and achieved a counting accuracy about 97% over 5,000 pedestrians counted. The system can also stream the ped counts and images to a remote server. Based on the feedback from p ...

    SBIR Phase II 2016 Department of Transportation
  3. A Reliable Transit Passenger Counting and Re-identification System Using Occlusion Proof Biometrics

    SBC: Migma Systems Inc.            Topic: 142FT1

    Automated passenger counter has been used in the transit systems for automated passenger counting and reporting. These systems have suffered counting accuracy issues, particularly at high rider load points, and at end-of-line count reconciliation. In Phase I, we have successfully developed systems for passenger counting and re-identification. Test results using the data collected at a transit b ...

    SBIR Phase II 2016 Department of Transportation
  4. Self-Sustaining, Intelligent Pavement Systems

    SBC: SOLAR ROADWAYS INCORPORATED            Topic: 091FH5

    As stated in the solicitation, the pavement infrastructure in the US covers a large surface area and requires intensive energy and natural resources. Vehicles that travel over these pavements are also resource intensive. Solar Roadways Incorporated envisions replacing current asphalt surfaces with modular Solar Road Panels: structurally-engineered solar panels that can be driven upon. The roadwa ...

    SBIR Phase II 2016 Department of Transportation
  5. Device to Address the Competing Needs of Ensuring Lockability of Seat Belts and Mitigating Entrapment Risk

    SBC: TOOL, INC.            Topic: 142NH1

    Federal regulations require a seat belt assembly with a locking lap belt to be available in passenger seating positions to securely accommodate a child restraint system. More recently, federal regulations have been updated to improve the quality of the child restraint system and the mechanisms by which it is secured. However, there are restrictions on total weight capacities for new restraint sy ...

    SBIR Phase II 2016 Department of Transportation
  6. Long Life, Low Cost Mini-Roundabouts from Simple Modular Shapes and Recycled Material

    SBC: ZKXKZ LLC            Topic: 142FH3

    In Phase I, ZKxKZ designed, developed and demonstrated an approach for fabrication and rapid installation of low cost modular mini-roundabouts made from recycled plastic boards. Phase 1 culminated in the demonstration of half-scale 24’ diameter roundabout’s center circle made with the recycled boards. The same material and modular construction approach can be applied to other roundabout featur ...

    SBIR Phase II 2016 Department of Transportation
  7. Analysis and Development of Scalable Techniques for Creating Optically Transparent Resistive Films with Tapered Resistivity

    SBC: Nano Terra, Inc.            Topic: SOCOM16004

    Conductive films that maintain transparency are a key element in many current products and industries, including electronic devices for touch screens and automobiles to defrost windows. Such films are also useful in military applications. By introducing a resistive taper in conductive films or antennas, overall performance can be improved by reducing backscattering and increasing sensitivity in an ...

    SBIR Phase I 2016 Department of DefenseSpecial Operations Command
  8. Advanced Transparent Armor Materials and Manufacturing Methods

    SBC: SURMET CORP            Topic: SOCOM14002

    "Current glass-based transparent armor has two major deficiencies: 1) It is very heavy, and therefore can compromise performance and helicopter transportability of vehicles; and 2) It is very thick, and therefore can compromise visual signature of vehicles. Advanced technology ceramic transparent armor removes both these deficiencies and provides a twofold improvement in performance, but costs 6-1 ...

    SBIR Phase I 2014 Department of DefenseSpecial Operations Command
  9. Structured Waveform, Magnetic Field (SWMF) PIG Development for Cracks and Corrosion

    SBC: JENTEK SENSORS, INC.            Topic: 132PH1

    Multiple major pipeline failures have been caused by seam weld defects not detected by available ILI technology [August 16, 2013 WSJ]. Phase I will demonstrate a game changing capability to deliver internal and external corrosion mapping and seam weld crack detection in a low-cost tool that “encourages more repetitive ILI runs and wider use.” JENTEK’s new through wall imaging method called S ...

    SBIR Phase I 2014 Department of Transportation
  10. Mid-chord Rail Offset Measurement Systems (McROMS)

    SBC: TECHNICAL PRODUCTS INC            Topic: 141FR1

    What is needed is a lightweight system that can be deployed and used by one person that will measure and compile the track geometry data and compute the MCO for a rail section in real time without reliance on any external reference. Such a device, the Mid-chord Rail Offset Measurement System (McROMS) is the subject of this proposal. But MCO is not the only rail geometry data of interest. If this s ...

    SBIR Phase I 2014 Department of Transportation
US Flag An Official Website of the United States Government