You are here
Award Data
The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.
Download all SBIR.gov award data either with award abstracts (290MB)
or without award abstracts (65MB).
A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.
The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.
-
Advanced Transparent Armor Materials and Manufacturing Methods
SBC: SURMET CORP Topic: SOCOM14002"Current glass-based transparent armor has two major deficiencies: 1) It is very heavy, and therefore can compromise performance and helicopter transportability of vehicles; and 2) It is very thick, and therefore can compromise visual signature of vehicles. Advanced technology ceramic transparent armor removes both these deficiencies and provides a twofold improvement in performance, but costs 6-1 ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Advanced Lightweight Transparent Armor Solutions for GMV"s
SBC: TECHNOLOGY ASSESSMENT AND TRANSFER, INC. Topic: SOCOM14002The expanding use of traditional transparent armor (TA) windows in smaller and lighter vehicles to enhance warfighter safety highlights the necessity to find lighter weight solutions to minimize vehicle performance degradation. While ultra lightweight TA solutions are available using a transparent polycrystalline material such as Spinel, the cost benefit is not easily realized on many smaller pla ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Inconspicuous Up-Armoring of Vehicles Using Segmented Ceramic and Metallic Elements
SBC: TRITON SYSTEMS, INC. Topic: SOCOM14003Triton Systems Inc.(Triton), together with our partner Technical Products Inc. (TPI) will conduct a feasibility study to evaluate options for armoring non standard commercial vehicles (NSCV) in an unobtrusive fashion using austere mechanical facilities corresponding to expedient basing in the area of operations. Triton has wide experience in metallic, ceramic and composite armoring solutions and ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Low Profile Closed Coolant System for High Speed Combatant Craft
SBC: TIAX LLC Topic: SOCOM14005High speed combatant craft utilized by SOCOM, such as the Riverine (SOC-R), use pumped raw water to provide engine cooling for the twin marine diesel engines. While raw water provides an essentially limitless heat sink, it often contains debris which can clog engine strainers, causing the engines to overheat. Thus, engine performance, as well as maintenance, is negatively affected by the use of th ...
SBIR Phase I 2014 Department of DefenseSpecial Operations Command -
Over the Horizon Underwater Communications
SBC: Megawave Corporation Topic: SOCOM13002In this proposal we describe our approach and anticipated results concerning the use of a novel and innovative method for providing Over-The-Horizon (OTH) L-band links between a submerged tracking device and an overhead satellite without the requirement for an on or above surface antenna. The encapsulation of an antenna in a dielectrically compensating tethered cocoon that includes a sensor and m ...
SBIR Phase I 2013 Department of DefenseSpecial Operations Command -
Remote Electronic Medical Devices using the Integrated Clinical Environment (REMDICE)
SBC: DocBox Inc Topic: SOCOM13003Generation of a single platform with multiple functional units requires a"fresh"approach. Battlefield CONOPS requires the immediate availability of multiple sensors and active devices. The sensors include: ultrasound, capnography, blood pressure measurement using non-invasive techniques, pulse oximetry, non-invasive hemoglobin measurement, electrocardiography and video laryngoscopy. Each of the ...
SBIR Phase I 2013 Department of DefenseSpecial Operations Command -
Megapixel Uncooled Photomechanical LWIR Imager
SBC: AGILTRON, INC. Topic: SOCOM07005Agiltron has developed a breakthrough modular IR imaging technology that employs a photomechanical effect, in which an array of micro-machined sensor pixels converts IR radiation into visible light signals that can be optically detected by commercial off-the-shelf CMOS or CCD visible-light imagers. With commercial CMOS imagers achieving multi-megapixel resolution, the resolution of the modular Agi ...
SBIR Phase I 2007 Department of DefenseSpecial Operations Command -
High Resolution Long Wave Infrared Focal Plane Array Development
SBC: NANTERO, INC. Topic: SOCOM07005Infrared (IR) detection is an integral part of the Global War on terrorism. Vandium Oxide based micro-bolometers are the current state of the art in uncooled IRFPA. The need for higher resolution 1280X960 arrays that operate at low power for man-portable applications include 24 hour surveillance and targeting . Carbon Nanotube (CNT) based IR detectors could fill this need. CNTs have unique electri ...
SBIR Phase I 2007 Department of DefenseSpecial Operations Command -
Camouflage Tactical Multiband Direction Finding Antenna Array
SBC: SYNTONICS LLC Topic: SOCOM06017Syntonics will demonstrate the feasibility of a broadband “DF Tarp." It can be a lightweight, rugged, fabric-like structure stretched on guyed poles like an awning or laid on top of a vehicle. It can be rolled or folded for storage. It can be fabricated in any color or camouflage pattern desired and many shapes — square, round, irregular — are possible. The antenna structure can be integrate ...
SBIR Phase I 2007 Department of DefenseSpecial Operations Command -
NBC Personnel Cooling Suit
SBC: Aspen Systems, Inc. Topic: N/A"Aspen Systems proposes to develop a small portable personal cooling system that may be used by the Special Operations Forces with or without NBC protective clothing. The approach proposed will rely on our miniature refrigeration technology previouslydeveloped. Our rotary compressor, developed to provide 300 Watts of cooling will be scaled up to meet the SOCOM requirements of 500 Watts. Technic ...
SBIR Phase I 2002 Department of DefenseSpecial Operations Command