You are here

Award Data

For best search results, use the search terms first and then apply the filters
Reset

The Award database is continually updated throughout the year. As a result, data for FY24 is not expected to be complete until March, 2025.

Download all SBIR.gov award data either with award abstracts (290MB) or without award abstracts (65MB). A data dictionary and additional information is located on the Data Resource Page. Files are refreshed monthly.

The SBIR.gov award data files now contain the required fields to calculate award timeliness for individual awards or for an agency or branch. Additional information on calculating award timeliness is available on the Data Resource Page.

  1. ADAPTIVE WAVELETS FOR LOSS-LESS HYPERSPECTRAL COMPRESSION

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    The penetration of hyperspectral sensing from either airborne or spaceborne platforms into both commercial and defense applications, has risen the need for efficient data transmission and storage. This efficiency can be provided by data compression technology that exhibits sufficient compression ratio at no or minimal loss of information and can perform the task in real or near real time. This P ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
  2. ADAPTIVE WAVELETS FOR LOSS-LESS HYPERSPECTRAL COMPRESSION

    SBC: ATLANTIC AEROSPACE ELECTRONICS CORP.            Topic: N/A

    The penetration of hyperspectral sensing from either airborne or spaceborne platforms into both commercial and defense applications, has risen the need for efficient data transmission and storage. This efficiency can be provided by data compression technology that exhibits sufficient compression ratio at no or minimal loss of information and can perform the task in real or near real time. This P ...

    SBIR Phase II 1998 Department of DefenseOffice of the Secretary of Defense
  3. ADS FORCE PHASE II: Assessment and Development Strategies FOr team Rapid Cognitive Effectiveness

    SBC: APTIMA INC            Topic: OSD10CR4

    Current military combat operations emphasize the use of teams, who are often expected to rapidly deploy together. This rapid deployment cycle is especially true for military transition teams. Such teams must quickly become highly functioning, as characterized by high levels of team cognitive readiness. To address the need for newly formed teams to rapidly become cognitively ready and effective, th ...

    SBIR Phase II 2012 Department of DefenseOffice of the Secretary of Defense
  4. Advanced Robot Training Interface

    SBC: Energid Technologies Corporation            Topic: OSD13HS1

    It is not likely that an autonomous system can be programmed with all the information it requires to perform every mission or every variation of every contingency within the near future. One way to address this issue is to provide user-friendly means to teach or program a robot to add to its autonomous capability. This proposal focuses on the physical aspects of the robot performance, manipulat ...

    SBIR Phase II 2015 Department of DefenseOffice of the Secretary of Defense
  5. A Five Volt Lithium Battery

    SBC: COVALENT ASSOC., INC.            Topic: N/A

    In this Phase I SBIR program we propose to develop a novel high voltage (5V) lithium-ion battery suitable for portable electronics equipmentand transportation applications. Lithium-ion batteries are already commercially available and typically consist of carbon anode, non-aqueous electrolyte and lithium transition metal oxide cathode such as LiCoO2, LiNiO2 or LiMnO4. These systems have an operat ...

    SBIR Phase II 1997 Department of DefenseOffice of the Secretary of Defense
  6. A Five Volt Lithium Battery

    SBC: COVALENT ASSOC., INC.            Topic: N/A

    N/A

    SBIR Phase I 1996 Department of DefenseOffice of the Secretary of Defense
  7. A High Efficiency, Wide Band Sound Projector for Acoustic Tomography and Global Ocean Monitoring

    SBC: Webb Research Corp.            Topic: N/A

    An acoustic projector suitable for long range signaling in the ocean is described. The design employs a novel approach, which could result in projectors of high performance, high efficiency, operation at any depth, and substantially reduced cost. Resolution of short pulses fundamentally requires acoustic energy spread over a broad band. Traditionally this has been done with projectors that pe ...

    SBIR Phase I 1997 Department of DefenseOffice of the Secretary of Defense
  8. A Model-Based Index of Cognitive Fightability for Warrior Systems

    SBC: APTIMA INC            Topic: N/A

    Current methods to assess system effectiveness often require the development of prototype systems and costly evaluation studies. Several heuristic approaches exist to support technology selection and implementation services, however a scientifically-basedprocess is needed that will consider the functionality that new technology provides, the missions that these systems will be applied to, and the ...

    SBIR Phase II 2003 Department of DefenseOffice of the Secretary of Defense
  9. An Interoperable Runtime Analysis and Monitoring (RAM) Tool Suite

    SBC: MAK TECHNOLOGIES            Topic: N/A

    The increasing number and complexity of HLA-based distributed simulation exercises has created an urgent need for a suite of commercially-supported HLA Runtime Analysis and Monitoring (RAM) tools. These tools must provide a clear, accurate and timely view into the dynamic virtual battlefield and its supporting infrastructure while also providing supervisory control of all federates. Mak Technolo ...

    SBIR Phase II 1998 Department of DefenseOffice of the Secretary of Defense
  10. A Novel Composite Elastomeric Material for CBW Agents

    SBC: ICET, INC            Topic: N/A

    We are proposing a triple defense system in a single compounded thin elastomeric material, to provide both physical permeation barrier as well as chemical and biological deactivation barrier without sacrificing the elastomeric properties of the proposed elastomers. The initial physical barrier is an alloyed ethylene-vinylalcohol ultrathin layer protected by the elastomer (better PVA coploymers wi ...

    SBIR Phase I 1998 Department of DefenseOffice of the Secretary of Defense
US Flag An Official Website of the United States Government